Attachment 3. PRST_Table.pdf
PDF 172 KB Posted
- Attached to
- MK 39 Mod 3 EMATT Production
- Solicitation number
- N6660422R0002
About this file
This document contains a Performance Requirements Summary Table for the MK 39 Mod 3 EMATT Production solicitation. The solicitation is for a ten-year production requirement to build, test, and deliver MK 39 Mod 3 EMATT units to the Naval Sea Systems Command. The summary table outlines key performance objectives, standards, and acceptance criteria for program management, quality assurance, pre-production validation, production, configuration management, software management, and progress reporting. It specifies required deliverables such as management plans, test reports, configuration items, and status reports to monitor contractor performance. Submission of items is to adhere to the listed Contract Data Requirements Lists.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A. CDRLS_MK 39 EMATT.pdf | ||
| Attachment 1. DD Form 254.pdf | ||
| Attachment 2. EMATT TDP Option Worksheet.pdf | ||
| N6660422R0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v1.2_APRIL2021
Performance Requirements Summary Table
Guidance on how to fill out this table is available in the DoD Guidebook for Performance-Based
Services Acquisition located at https://www.acq.osd.mil/dpap/docs/pbsaguide010201.pdf
Requirement (Task number and title from SOW/PWS)
CDRL
(if applicable)
Performance Objective
Performance Standard
Acceptable Quality Level
(AQL)
Monitoring Method
4.1.1 Program
Management Review and Technical
Interchange Meetings
A001
Conduct Program Management Reviews (PMR) semiannually.
Participate in Technical Interchange Meetings (TIM) weekly
Presentation materials should be provided prior to PMRs and TIMs. Monthly Production metrics to be included with each presentation
Presentation materials should be provided prior to PMRs and TIMs in accordance with CDRL A001.
Government oversight as part of the review, comment, and approval process. Government will review the plans and all other technical documentation/data products
4.1.2 Quality Assurance
Plan A002
Perform quality assurance testing in accordance with Applicable Documents to verify systems operate in accordance with all government approved change requests.
Establish, implement, document and maintain a quality system that ensures conformance and meets the requirements of
ANSI/ISO/ASQ
9001-2008 (Document 3.2) A Quality Assurance Program Plan (QAPP) to be generated for review and approval. The QAPP shall describe the Quality Management System methodology and approaches to be used under the contract. The Quality Management
QAPP shall be submitted to the government in accordance with CDRL A002 https://www.acq.osd.mil/dpap/docs/pbsaguide010201.pdf
System shall meet the requirements of Applicable Document 3.2
4.1.3
Pre-Production Validation and
First Lot Validation
4.14
Production
A003 A004
Build, test and deliver Pre- Production Validation and First Lot Validation units.
(4.1.3) Build, test and deliver MK39 Mod 3
EMATTS(4.1.4)
Build, test and deliver Pre- Production Validation and First Lot Validation units.
(4.1.3) Deliver factory acceptance Functional test reports and Environmental and In- water test reports, and Serial number reports with each lot.
All reports generated should be provided to the government for review in accordance with CDRL A003 and A004.
Government oversight as part of the review, comment, and approval process. Government will review the plans and all other technical documentation/data products
4.1.4.1 Early Sampling A005
Inspection of randomly selected samples upon completion of 30% of the anticipated inspection lot quantity but less than 100% at the behest of the contractor.
Provide written proof (Certificate of Compliance) that subsystems components for the entire lot are from the same manufacturer and build process.
Included subsystems a listed in the
SOW
If this mechanism is used all certificates submitted to the government should be in accordance with
CDRL A005
4.1.4.4 Reliability Test
Plan A006
Development of a Reliability Test Plan if reliability is below 80%, as measured at the end of each CLIN’s Period of Performance.
Document efforts to improve
EMATT
reliability in the initial delivery and also document results of the test and investigation in the final delivery.
The government will reserve the right to halt production until the investigation and testing are completed.
All finding and reports generated should be provided to the government for review in accordance with CDRL
A006
4.1.4.5 Failure
Review Board
A007 A008
Upon completion of a reliability inspection, if the sample fails to
The Failure Review Board shall consist of both Government
All finding and reports provided to the government for review in meet the requirements of the Reliability
Test Plan (SOW 4.1.4.4) a Failure
Review Board shall be conducted.
and Contractor personnel. Upon completion of the Failure Review
Board the contractor shall submit a Corrective
Action Plan (CAP) ,whereas upon Government approval of the CAP, a reliability inspection sample will be submitted by the contractor in accordance with the Prime Item
Product Performance
Specification for the MK 39 Mod
3 EMATT
(Document 3.1) accordance with CDRL A007 and A008
4.1.5 Air Launch Certification
A009
Any and all changes made to
NAVSEA
drawing
#8721731 shall be reviewed by the appropriate
NAVAIR
personnel prior to incorporation of production units
Review
NAVSEA
Drawings and submit updates as required. Five
(5) modified test units with minor changes shall be submitted for non-destructive testing. Fifteen
(15) modified test units with major changes shall be submitted for destructive testing.
Any Air launch certificate packages submitted shall be in accordance with
CDRL A009
4.1.6 Battery
Certification A00A
Lithium batteries are to be in compliance with all Navy Lithium Safety Program Responsibilities and Procedures of S9310-AQ-
SAF-010.
Fabricate and deliver eighteen
(18) cells and five (5) full assembly batteries as certification test assets if batteries have not been previously tested.
Destructive testing to be
All findings, documents and reports generated should be provided to the government for review in
A00A performed by the Government for verification that the items meet the performance requirements detailed in document 3.1.
submission of a battery certification package with any RFV’s or ECP’s to applicable
NAVSEA
drawings
4.2 Configuration Management
A00B
Implementation of Configuration
Management (CM) to establish and maintain a configuration baseline in accordance with the CM plan for
PMS 404
Submission of an Engineering
Change Proposal (ECP) for any changes made to the MK 39 Mod
3 EMATT
baseline. ECP’s to be submitted via CMPro Database. Costs for ECPs.
Submissions prior to Preproduction
Validation to be included in CLIN
0001.
All approvals for technical content and contractual acceptance will be in accordance with
CDRL A00B
4.2.3 Diminishing
Manufacturing Sources and
Material Shortages
(DMSMS)
Review
A00C Establishment of baseline design for DMSMS
Provide recommendations for lifetime buy, redesign or drop in replacements.
Responsible for all DMSMS updates should be provided to the government for review in accordance with CDRL
A00C
4.2.4 Software
Configuration Management
A00D A00E
Provide a method for identifying and documenting software defects.
Maintain a software configuration management database that captures and tracks all software problems and is capable of reporting problems.
Software to have no unresolved should be provided to the government for review in
A00D and A00E defects upon completion of contract.
Software and source code to be delivered when modified.
Submission of annual bug list and participation in TIMs to discuss aforementioned list.
5.0 Progress Reports A00F Prepare and
submit reports
Preparation of Contractor’s Status Report that indicates the progress of work, status of the program(s), and existing or potential problem areas for all assigned tasks.
The Contractor shall submit the Contract Status Report for the same timeframe as each invoice submitted in the
Wide Area Workflow
(WAWF)
Module of the Procurement
Integrated Enterprise
Environment
(PIEE).
All documents and reports provided to the government for review in
A00F