About this file

This document package is a solicitation for the procurement of equipment for the Colombian Combined Training Center. The solicitation seeks to procure, produce, integrate, test, deliver, and install Instrumented Multiple Intergrated Laser Engagement System (I-MILES) Exercise Control (EXCON)/Transportable Radio Relay (TRR), and associated support equipment. The Statement of Work, Requirements Matrix, Performance Certification Statement, and Performance Specification attachments provide details on requirements. Products required include I-MILES EXCON/TRR systems, support equipment, and associated integration, testing, delivery, installation and training services. The Department of the Army Materiel Command Contracting Command Orlando Contracting Center issued the solicitation. Responses are due by the date specified in the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-IPO

6. REQUIRING OFFICE

SOW Paragraph 3.1.1

5. CONTRACT REFERENCE

DI-MGMT-81861

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Integrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 4: Each submission shall portray the total project schedule, as well as the project critical path and all critical path dependencies.

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: Shall be due on or before 10 working days After Contract Award.

Block 13: Shall be due on or before 10 working days after a critical milestone schedule change.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.

The Government will have 30 working days for review and acceptance or rejection of each submission.

The Contractor shall have 10 working days to incorporate Government comments.

Contractor format is acceptable.

16. REMARKS 1SFAE-STRI-IPO

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

SOW Paragraph 3.1.2.3

5. CONTRACT REFERENCE

DI-ADMN-81250A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Conference Minutes

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMN

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

8. APP CODE

NO

7. DD 250 REQ

SEE BLOCK 16

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

1. Block 9: Distribution Statement D - Distribution authorized to DoD and U.S. DoD contractors only. Administrative or Operational, 28 May 2014.

Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

2, Block 12: Meeting slides shall provided to the Government NLT 10 working days prior to the initial PMR

3. Block 13: Meeting slides shall be provided to the Government NLT 10 working days prior to each subsequent PMR

4. Block 14: DELIVERABLES SHALL BE DELIVERED VIA WIDE AREA

WORKFLOW (WAWF) IN ACCORDANCE WITH CONTRACT CLAUSES SET FORTH IN

SECTION G, CONTRACT ADMINISTRATION DATA. IN THE EVENT THAT

DOCUMENTATION CANNOT BE PROVIDED VIA WAWF (DUE TO FILE SIZE OR

CONTENT TYPE), THEN THE DOCUMENT SHALL BE SENT VIA ELECTRONIC

MAIL (EMAIL) OR OPTICAL DISK (CD OR DVD). ALL DOCUMENTS SHALL BE

DELIVERED IN BOTH SEARCHABLE PDF AND NATIVE EDITABLE FORMAT.

NATIVE EDITABLE FORMAT IS DEFINED AS A DIGITAL FILE PRODUCED BY

COTS SOFTWARE (I.E. MICROSOFT OFFICE, OPENOFFICE, AUTOCAD,

VECTORWORKS, OR OTHERS). EMAIL OR OPTICAL DISK TRANSMISSIONS

SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT LEADER AND

THE PROJECT ENGINEER. OPTICAL DISK DELIVERIES SHALL BE MADE TO

THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-IPO, ATTN: APM,

PC, AND ENGINEER FOR THE PROJECT IDENTIFIED IN CDRL BLOCK D,

12211 SCIENCE DRIVE, ORLANDO, FL 32826-3276.

16. REMARKS See Block 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.1

5. CONTRACT REFERENCE

DI-MGMT-81651

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contract Invoicing and Payment Report

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

QRTLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 8: Government approval is required.

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

Block 12: The CIPT shall be simultaneously due no later than five calendar days after each quarterly reporting period. The first reporting period shall begin at contract award.

Block 13: The CIPT shall be due through the end of the contract or until all balances are zero, and no more actions are pending.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, AutoCAD, Vector Works, or others). Optical Disk deliveries shall be made to PEO STRI, ATTN: SFAE-STRI-IPO / ATTN:TOW-ITAS-LIFTS APM and Project Contract Specialist, 12211 Science Drive, Orlando, FL 32826-3224.

The Government shall have 15 working days for review and acceptance or rejection of each Contract Invoicing and Payment Report (CIPR).

The Contractor shall have five working days to incorporate Government comments.

Contractor format is acceptable.

16. REMARKS See Block 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.1

5. CONTRACT REFERENCE

DI-MGMT-81904

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A004

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

ONE/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block 2: CONTRACTORS PROGRESS, STATUS AND MANAGEMENT REPORT

Block D: Colombia Combined Training Center

Block 4: Each submission shall portray the total project schedule, as well as the project critical path and all critical path dependencies.

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: Shall be due on or before 10 working days After Contract Award.

Block 13: Shall be due on a monthly basis.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.

The Government will have 30 working days for review and acceptance or rejection of each submission.

The Contractor shall have 10 working days to incorporate Government comments.

Contractor format is acceptable.

16. REMARKS See Block 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.10

5. CONTRACT REFERENCE

DI-SAFT-81563

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Accident/Incident Report

2. TITLE OF THE DATA ITEM

A005

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

See Block 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: a. Minor Incidents: The Contractor shall report pertinent facts regarding the incidents involving personnel misconduct, minor equipment/property damage and/or injury within forty-eight (48) hours of the initial discovery.

b. Moderate Incidents: The Contractor shall report pertinent facts regarding incidents involving moderate equipment/property damage or injury within Twenty-four (24) hours of the initial discovery.

c. Major Incidents: The Contractor shall report pertinent facts regarding incidents involving major equipment/property damage, major injury or fatality, and/or escalation of force incidents IMMEDIATELY upon initial discovery in person or telephonically, to the appropriate Government POCs (i.e. cognizant PCO, Program Director, local authorities).

Block 13: a. Minor Incidents: The Contractor shall report pertinent facts regarding the incidents involving personnel misconduct, minor equipment/property damage and/or injury within forty-eight (48) hours of the initial discovery.

b. Moderate Incidents: The Contractor shall report pertinent facts regarding incidents involving moderate equipment/property damage or injury within twenty-four (24) hours of the initial discovery.

c. Major Incidents: The Contractor shall report pertinent facts regarding incidents involving major equipment/property damage, major injury or fatality, and/or escalation of force incidents IMMEDIATELY upon initial discovery in person or telephonically, to the appropriate Government POCs (i.e. cognizant PCO, Program Director, local authorities).

Block 14: a. Minor Incidents: The Contractor shall notify the appropriate Government Point(s) of Contact (POCs) (i.e. COR) via telephonic or electronic (email) means.

16. REMARKS See Block 16

000 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

16. REMARKS (Continued)

b. Major Incidents: The Contractor shall notify the appropriate Government Point(s) of Contact (POCs) (i.e. cognizant PCO, local authorities and COR, where applicable, telephonically). A voice mail message left telephonically is not acceptable to meet this requirement. Within 40 hours of the initial verbal report, the Contractor shall submit an Accident/Incident Report IAW the CDRL to the PCO and the COR.

c. Major Incidents: The Contractor shall report pertinent facts regarding incidents involving major equipment/property damage, major injury or fatality, and/or escalation of force incidents IMMEDIATELY upon initial discovery in person or telephonically, to the appropriate Government POCs (i.e. cognizant PCO, Program Director, local authorities). A voice mail message left telephonically is not acceptable to meet this requirement. Within 24 hours of the initial verbal report, the Contractor shall submit an Accident/Incident Report IAW the CDRL to the PCO and COR.

Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e.

Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN:

SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

Colombia Combined Training Center

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFT

B. EXHIBITA. CONTRACT LINE ITEM NO.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Page 2 of 2 PagesDD FORM 1423-1, FEB 2001

SOW Paragraph 3.2.3

5. CONTRACT REFERENCE

DI-SAFT-80102C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

SAFETY ASSESSMENT REPORT

2. TITLE OF THE DATA ITEM

B001

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFT

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Contractor shall utilize existing products or standard contractor approved Safety Assessment Reports whenever possible and provide any change pages if required.

Block 8: Government approval will be required prior to the start of any testing.

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: Shall be due 90 calendar days prior to the In-Plant Inspection, Inventory, and Functional Test.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.

The Government will have 30 working days for review and acceptance or rejection of each submission.

The Contractor shall have 10 working days to incorporate Government comments.

Contractor format is acceptable.

16. REMARKS 1SFAE-STRI-IPO

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.2.4

5. CONTRACT REFERENCE

DI-MISC-81381

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Form Fit ReportSite Survey Report

2. TITLE OF THE DATA ITEM

B002

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MISC

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: First Submission shall be due 30 Calendar days after completion of each Form Fit/Site Survey.

BLOCK 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office, or others). Optical disks shall be delivered to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.

The Government will have 30 working days for review and acceptance or rejection of each submission.

The Contractor shall have 10 working days to incorporate Government comments.

Contractor format is acceptable.

16. REMARKS 1SFAE-STRI-IPO

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

See Block 16

5. CONTRACT REFERENCE

DI-NDTI-80603A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Test Procedure

2. TITLE OF THE DATA ITEM

B003

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTI

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Gomez, Robert

I. APPROVED BY

14-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 5: SOW Paragraph 3.2.5 SOW Paragraph 3.2.6

Block 8: . Government approval will be required prior to the start of any testing.

Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.

DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: Shall be due 60 calendar days prior to start of the In-Plant Inspection, Inventory, and Functional Test.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.

The Government will have 30 working days for review and acceptance or rejection of each submission.

The Contractor shall have 10 working days to incorporate Government comments.

Contractor format is acceptable.

16. REMARKS 1SFAE-STRI-IPO

010 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraphs 3.4.1 and 3.4.2

5. CONTRACT REFERENCE

DI-ILSS-80872

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Training MaterialsTraining Materials

2. TITLE OF THE DATA ITEM

C001

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ILSS

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

SEE BLOCK 16

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

See Block 16

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

2TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Dunson, Keith

I. APPROVED BY

13-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 9: In lieu of a Distribution Statement and in accordance with DoDI 5230.24, the following Disclosure Statement will be applied to this effort:

DISCLOSURE: The enclosed U.S. training materials are approved for release to the Government of Colombia. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING: All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Block 12: Initial submission shall be due 90 calendar days prior to the In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 20 calendar days to incorporate Government comments and re-submit.

Block 13: Final submission shall be due 60 calendar days after the In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 15 calendar days to incorporate Government comments.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, or others). Optical disk deliveries shall be made to the following address:

PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276. One hard copy of the New Equipment Training course materials shall be delivered per student during the NET event and one hard copy of the Maintenance Training course materials shall be delivered per student during the Maintenance Training event. One soft copy of the NET course materials and one soft copy of the Maintenance Training course materials shall be delivered with the system upon delivery to country.

16. REMARKS See Block 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.5.1

5. CONTRACT REFERENCE

MIL-STD-40051-2C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Operator User's ManualPage-Based Technical Manuals

2. TITLE OF THE DATA ITEM

C002

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM X OTHER

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

SEE BLOCK 16

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Dunson, Keith

I. APPROVED BY

13-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 4: The contractor shall use MIL-STD-40051-2C as a guide for the technical publication format.

Block 9: In lieu of a Distribution Statement and in accordance with DoDI 5230.24, the following Disclosure Statement will be applied to this effort:

DISCLOSURE: The enclosed U.S. technical publication is approved for release to the Government of Colombia. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

The contractor shall validate the technical publications prior to official submittal and Government review.

Block 12: Submittal shall be due 90 calendar days prior to In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 20 calendar days to incorporate Government comments.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, or others). The gaining country shall have unlimited reproduction rights for the soft copies within the gaining country, for gaining country use only.

Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276. In addition, a minimum of three soft copies and three hard copies of each approved Operator User's Manual shall be shipped with the system to the gaining country.

16. REMARKS See Block 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.5.2

5. CONTRACT REFERENCE

MIL-STD-40051-2C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

System Maintenance ManualPage-Based Technical Manuals

2. TITLE OF THE DATA ITEM

C003

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM X OTHER

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

NO

7. DD 250 REQ

SEE BLOCK 16

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

See Block 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

14-APR-2021

J. DATE

Dunson, Keith

I. APPROVED BY

13-APR-2021

H. DATEG. PREPARED BY

Brooks, Demetrius

Block D: Colombia Combined Training Center

Block 4: The contractor shall use MIL-STD-40051-2C as a guide for the technical publication format.

Block 9: In lieu of a Distribution Statement and in accordance with DoDI 5230.24, the following Disclosure Statement will be applied to this effort:

DISCLOSURE: The enclosed U.S. technical publication is approved for release to the Government of Colombia. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

The contractor shall validate the technical publications prior to official submittal and Government review.

Block 12: Submittal shall be due 90 calendar days prior to In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 20 calendar days to incorporate Government comments.

Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, or others). The gaining country shall have unlimited reproduction rights for the soft copies within the gaining country, for gaining country use only.

Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276. In addition, a minimum of one hard copy, and two soft copies of each approved System Maintenance Manual shall be shipped with the system to the gaining country.

16. REMARKS See Block 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW Paragraph 3.5.3

5. CONTRACT REFERENCE

DI-TMSS-80527C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

COTS ManualsSee Block 16

2. TITLE OF THE DATA ITEM

C004

1. DATA ITEM NO.

F. CONTRACTOR

SOW-2020-031

E. CONTRACT/PR NO.

See Block 16

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM X OTHER

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .