Exhibit A Contract Data Requirements List (CDRLs).pdf
PDF 280 KB Posted
- Solicitation number
- W900KK-21-R-0023
About this file
This document package is a solicitation for the procurement of equipment for the Colombian Combined Training Center. The solicitation seeks to procure, produce, integrate, test, deliver, and install Instrumented Multiple Intergrated Laser Engagement System (I-MILES) Exercise Control (EXCON)/Transportable Radio Relay (TRR), and associated support equipment. The Statement of Work, Requirements Matrix, Performance Certification Statement, and Performance Specification attachments provide details on requirements. Products required include I-MILES EXCON/TRR systems, support equipment, and associated integration, testing, delivery, installation and training services. The Department of the Army Materiel Command Contracting Command Orlando Contracting Center issued the solicitation. Responses are due by the date specified in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-IPO
6. REQUIRING OFFICE
SOW Paragraph 3.1.1
5. CONTRACT REFERENCE
DI-MGMT-81861
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Integrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 4: Each submission shall portray the total project schedule, as well as the project critical path and all critical path dependencies.
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: Shall be due on or before 10 working days After Contract Award.
Block 13: Shall be due on or before 10 working days after a critical milestone schedule change.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.
The Government will have 30 working days for review and acceptance or rejection of each submission.
The Contractor shall have 10 working days to incorporate Government comments.
Contractor format is acceptable.
16. REMARKS 1SFAE-STRI-IPO
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
SOW Paragraph 3.1.2.3
5. CONTRACT REFERENCE
DI-ADMN-81250A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Conference Minutes
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
NO
7. DD 250 REQ
SEE BLOCK 16
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
1. Block 9: Distribution Statement D - Distribution authorized to DoD and U.S. DoD contractors only. Administrative or Operational, 28 May 2014.
Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
2, Block 12: Meeting slides shall provided to the Government NLT 10 working days prior to the initial PMR
3. Block 13: Meeting slides shall be provided to the Government NLT 10 working days prior to each subsequent PMR
4. Block 14: DELIVERABLES SHALL BE DELIVERED VIA WIDE AREA
WORKFLOW (WAWF) IN ACCORDANCE WITH CONTRACT CLAUSES SET FORTH IN
SECTION G, CONTRACT ADMINISTRATION DATA. IN THE EVENT THAT
DOCUMENTATION CANNOT BE PROVIDED VIA WAWF (DUE TO FILE SIZE OR
CONTENT TYPE), THEN THE DOCUMENT SHALL BE SENT VIA ELECTRONIC
MAIL (EMAIL) OR OPTICAL DISK (CD OR DVD). ALL DOCUMENTS SHALL BE
DELIVERED IN BOTH SEARCHABLE PDF AND NATIVE EDITABLE FORMAT.
NATIVE EDITABLE FORMAT IS DEFINED AS A DIGITAL FILE PRODUCED BY
COTS SOFTWARE (I.E. MICROSOFT OFFICE, OPENOFFICE, AUTOCAD,
VECTORWORKS, OR OTHERS). EMAIL OR OPTICAL DISK TRANSMISSIONS
SHALL BE DELIVERED TO THE ATTENTION OF THE PROJECT LEADER AND
THE PROJECT ENGINEER. OPTICAL DISK DELIVERIES SHALL BE MADE TO
THE FOLLOWING ADDRESS: PEO STRI, ATTN: SFAE-STRI-IPO, ATTN: APM,
PC, AND ENGINEER FOR THE PROJECT IDENTIFIED IN CDRL BLOCK D,
12211 SCIENCE DRIVE, ORLANDO, FL 32826-3276.
16. REMARKS See Block 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.1
5. CONTRACT REFERENCE
DI-MGMT-81651
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Invoicing and Payment Report
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
QRTLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 8: Government approval is required.
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
Block 12: The CIPT shall be simultaneously due no later than five calendar days after each quarterly reporting period. The first reporting period shall begin at contract award.
Block 13: The CIPT shall be due through the end of the contract or until all balances are zero, and no more actions are pending.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, AutoCAD, Vector Works, or others). Optical Disk deliveries shall be made to PEO STRI, ATTN: SFAE-STRI-IPO / ATTN:TOW-ITAS-LIFTS APM and Project Contract Specialist, 12211 Science Drive, Orlando, FL 32826-3224.
The Government shall have 15 working days for review and acceptance or rejection of each Contract Invoicing and Payment Report (CIPR).
The Contractor shall have five working days to incorporate Government comments.
Contractor format is acceptable.
16. REMARKS See Block 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.1
5. CONTRACT REFERENCE
DI-MGMT-81904
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block 2: CONTRACTORS PROGRESS, STATUS AND MANAGEMENT REPORT
Block D: Colombia Combined Training Center
Block 4: Each submission shall portray the total project schedule, as well as the project critical path and all critical path dependencies.
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: Shall be due on or before 10 working days After Contract Award.
Block 13: Shall be due on a monthly basis.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.
The Government will have 30 working days for review and acceptance or rejection of each submission.
The Contractor shall have 10 working days to incorporate Government comments.
Contractor format is acceptable.
16. REMARKS See Block 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.10
5. CONTRACT REFERENCE
DI-SAFT-81563
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Accident/Incident Report
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: a. Minor Incidents: The Contractor shall report pertinent facts regarding the incidents involving personnel misconduct, minor equipment/property damage and/or injury within forty-eight (48) hours of the initial discovery.
b. Moderate Incidents: The Contractor shall report pertinent facts regarding incidents involving moderate equipment/property damage or injury within Twenty-four (24) hours of the initial discovery.
c. Major Incidents: The Contractor shall report pertinent facts regarding incidents involving major equipment/property damage, major injury or fatality, and/or escalation of force incidents IMMEDIATELY upon initial discovery in person or telephonically, to the appropriate Government POCs (i.e. cognizant PCO, Program Director, local authorities).
Block 13: a. Minor Incidents: The Contractor shall report pertinent facts regarding the incidents involving personnel misconduct, minor equipment/property damage and/or injury within forty-eight (48) hours of the initial discovery.
b. Moderate Incidents: The Contractor shall report pertinent facts regarding incidents involving moderate equipment/property damage or injury within twenty-four (24) hours of the initial discovery.
c. Major Incidents: The Contractor shall report pertinent facts regarding incidents involving major equipment/property damage, major injury or fatality, and/or escalation of force incidents IMMEDIATELY upon initial discovery in person or telephonically, to the appropriate Government POCs (i.e. cognizant PCO, Program Director, local authorities).
Block 14: a. Minor Incidents: The Contractor shall notify the appropriate Government Point(s) of Contact (POCs) (i.e. COR) via telephonic or electronic (email) means.
16. REMARKS See Block 16
000 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
16. REMARKS (Continued)
b. Major Incidents: The Contractor shall notify the appropriate Government Point(s) of Contact (POCs) (i.e. cognizant PCO, local authorities and COR, where applicable, telephonically). A voice mail message left telephonically is not acceptable to meet this requirement. Within 40 hours of the initial verbal report, the Contractor shall submit an Accident/Incident Report IAW the CDRL to the PCO and the COR.
c. Major Incidents: The Contractor shall report pertinent facts regarding incidents involving major equipment/property damage, major injury or fatality, and/or escalation of force incidents IMMEDIATELY upon initial discovery in person or telephonically, to the appropriate Government POCs (i.e. cognizant PCO, Program Director, local authorities). A voice mail message left telephonically is not acceptable to meet this requirement. Within 24 hours of the initial verbal report, the Contractor shall submit an Accident/Incident Report IAW the CDRL to the PCO and COR.
Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e.
Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN:
SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
Colombia Combined Training Center
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Page 2 of 2 PagesDD FORM 1423-1, FEB 2001
SOW Paragraph 3.2.3
5. CONTRACT REFERENCE
DI-SAFT-80102C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SAFETY ASSESSMENT REPORT
2. TITLE OF THE DATA ITEM
B001
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Contractor shall utilize existing products or standard contractor approved Safety Assessment Reports whenever possible and provide any change pages if required.
Block 8: Government approval will be required prior to the start of any testing.
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: Shall be due 90 calendar days prior to the In-Plant Inspection, Inventory, and Functional Test.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.
The Government will have 30 working days for review and acceptance or rejection of each submission.
The Contractor shall have 10 working days to incorporate Government comments.
Contractor format is acceptable.
16. REMARKS 1SFAE-STRI-IPO
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.2.4
5. CONTRACT REFERENCE
DI-MISC-81381
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Form Fit ReportSite Survey Report
2. TITLE OF THE DATA ITEM
B002
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: First Submission shall be due 30 Calendar days after completion of each Form Fit/Site Survey.
BLOCK 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office, or others). Optical disks shall be delivered to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.
The Government will have 30 working days for review and acceptance or rejection of each submission.
The Contractor shall have 10 working days to incorporate Government comments.
Contractor format is acceptable.
16. REMARKS 1SFAE-STRI-IPO
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
See Block 16
5. CONTRACT REFERENCE
DI-NDTI-80603A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Test Procedure
2. TITLE OF THE DATA ITEM
B003
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTI
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Gomez, Robert
I. APPROVED BY
14-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 5: SOW Paragraph 3.2.5 SOW Paragraph 3.2.6
Block 8: . Government approval will be required prior to the start of any testing.
Block 9: Distribution Statement D - Distribution authorized to DoD and U.S.
DoD contractors only. Administrative or Operational, 28 May 2014. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: Shall be due 60 calendar days prior to start of the In-Plant Inspection, Inventory, and Functional Test.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in section G, contract administration data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via optical disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft office, open office or others). Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276.
The Government will have 30 working days for review and acceptance or rejection of each submission.
The Contractor shall have 10 working days to incorporate Government comments.
Contractor format is acceptable.
16. REMARKS 1SFAE-STRI-IPO
010 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraphs 3.4.1 and 3.4.2
5. CONTRACT REFERENCE
DI-ILSS-80872
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Training MaterialsTraining Materials
2. TITLE OF THE DATA ITEM
C001
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ILSS
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
SEE BLOCK 16
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
2TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Dunson, Keith
I. APPROVED BY
13-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 9: In lieu of a Distribution Statement and in accordance with DoDI 5230.24, the following Disclosure Statement will be applied to this effort:
DISCLOSURE: The enclosed U.S. training materials are approved for release to the Government of Colombia. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING: All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 12: Initial submission shall be due 90 calendar days prior to the In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 20 calendar days to incorporate Government comments and re-submit.
Block 13: Final submission shall be due 60 calendar days after the In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 15 calendar days to incorporate Government comments.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, or others). Optical disk deliveries shall be made to the following address:
PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276. One hard copy of the New Equipment Training course materials shall be delivered per student during the NET event and one hard copy of the Maintenance Training course materials shall be delivered per student during the Maintenance Training event. One soft copy of the NET course materials and one soft copy of the Maintenance Training course materials shall be delivered with the system upon delivery to country.
16. REMARKS See Block 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.5.1
5. CONTRACT REFERENCE
MIL-STD-40051-2C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Operator User's ManualPage-Based Technical Manuals
2. TITLE OF THE DATA ITEM
C002
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM X OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
SEE BLOCK 16
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Dunson, Keith
I. APPROVED BY
13-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 4: The contractor shall use MIL-STD-40051-2C as a guide for the technical publication format.
Block 9: In lieu of a Distribution Statement and in accordance with DoDI 5230.24, the following Disclosure Statement will be applied to this effort:
DISCLOSURE: The enclosed U.S. technical publication is approved for release to the Government of Colombia. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
The contractor shall validate the technical publications prior to official submittal and Government review.
Block 12: Submittal shall be due 90 calendar days prior to In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 20 calendar days to incorporate Government comments.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, or others). The gaining country shall have unlimited reproduction rights for the soft copies within the gaining country, for gaining country use only.
Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276. In addition, a minimum of three soft copies and three hard copies of each approved Operator User's Manual shall be shipped with the system to the gaining country.
16. REMARKS See Block 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.5.2
5. CONTRACT REFERENCE
MIL-STD-40051-2C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
System Maintenance ManualPage-Based Technical Manuals
2. TITLE OF THE DATA ITEM
C003
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM X OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
NO
7. DD 250 REQ
SEE BLOCK 16
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
14-APR-2021
J. DATE
Dunson, Keith
I. APPROVED BY
13-APR-2021
H. DATEG. PREPARED BY
Brooks, Demetrius
Block D: Colombia Combined Training Center
Block 4: The contractor shall use MIL-STD-40051-2C as a guide for the technical publication format.
Block 9: In lieu of a Distribution Statement and in accordance with DoDI 5230.24, the following Disclosure Statement will be applied to this effort:
DISCLOSURE: The enclosed U.S. technical publication is approved for release to the Government of Colombia. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.
EXPORT CONTROL WARNING. All printed and electronic technical data, including digital technical documents that are determined to contain export-controlled technical data shall be marked as shown below.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App.
2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
The contractor shall validate the technical publications prior to official submittal and Government review.
Block 12: Submittal shall be due 90 calendar days prior to In-Plant Inspection, Inventory, and Functional Test. The Government will have 20 calendar days to accept/reject and provide comments. The contractor shall have 20 calendar days to incorporate Government comments.
Block 14: Deliverables shall be delivered via Wide Area Workflow (WAWF) in accordance with contract clauses set forth in Section G, Contract Administration Data. In the event that documentation cannot be provided via WAWF (due to file size or content type), then the document shall be sent via Optical Disk (CD or DVD). All documents shall be delivered in both searchable PDF and native editable format. Native editable format is defined as a digital file produced by COTS software (i.e. Microsoft Office, or others). The gaining country shall have unlimited reproduction rights for the soft copies within the gaining country, for gaining country use only.
Optical disk deliveries shall be made to the following address: PEO STRI, ATTN: SFAE-STRI-IPO, for the project identified in CDRL BLOCK D, 12211 Science Drive, Orlando, FL 32826-3276. In addition, a minimum of one hard copy, and two soft copies of each approved System Maintenance Manual shall be shipped with the system to the gaining country.
16. REMARKS See Block 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW Paragraph 3.5.3
5. CONTRACT REFERENCE
DI-TMSS-80527C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
COTS ManualsSee Block 16
2. TITLE OF THE DATA ITEM
C004
1. DATA ITEM NO.
F. CONTRACTOR
SOW-2020-031
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM X OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188).