Exhibit A - Contract Data Requirements List (CDRL) C-130 Wheel Well Blast and Paint .pdf

PDF 584 KB Posted

Attached to
C-130 Blast and Paint Booth System Federal contract opportunity
Solicitation number
N6852025Q1004
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document is a Contract Data Requirements List (CDRL) for a C-130 Wheel Well Blast and Paint Booths system. The CDRL outlines 12 distinct data items that the contractor must submit during the contract lifecycle, including an Operation and Maintenance Manual, Lockout and Tagout Procedure, Calibration Procedure, Product Drawings, Software Media and Documentation, Plan of Action and Milestones, Site Preparation and Installation Plan, Acceptance Test Plan, Conference Agenda and Minutes, and a Training Plan. Each data item has specific submission requirements, such as draft and final submission timelines, distribution instructions, and detailed content expectations.

The data items are to be submitted to Fleet Readiness Center East (FRCE) at Cherry Point, NC, with most documents requiring electronic submission (typically as PDF or Microsoft Word files) and some requiring printed copies. Submission timelines vary but generally involve initial drafts prior to Preliminary Design Review, working drafts incorporating government comments, and final versions after system installation or final acceptance testing. The documents cover technical, operational, safety, and training aspects of the C-130 Wheel Well Blast and Paint Booths system, ensuring comprehensive documentation and government oversight throughout the project lifecycle.

View the file

Other files for this federal contract opportunity

Other files attached to C-130 Blast and Paint Booth System, newest first.
File Type Posted
Attachment 1 - SOW C-130 Blast and Paint Booth_8_1_2025.pdf PDF
Attachment 2_ Questions_Answers.pdf PDF
Attachment 1 - SOW C-130 Blast and Paint Booth.pdf PDF
SF 1449 - N6852025Q1004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

C-130 Wheel Well Blast and Paint Booths TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

3. SUBTITLES

A001

Operation and Maintenance Manual N/A

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-TMSS-81675A

SOW PARAGRAPH 3.6.1; 3.8; 3.8.1; 3.8.2;

3.8.3

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250

REQ 9. DIST

STATEMENT

REQUIRED

C (SEE BLK 16)

10.

FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD

3 TIMES (SEE

BLK 16)

SEE BLK 16

a.

ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION Draft Final

A N/A SEE BLK 16 Reg Repro

16. REMARKS

FRCE ACQ 2 6

BLOCK 9: DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER

EAST, CHERRY POINT, NC 28533

BLOCK 10, 12, 13:

• Submit first draft NLT 60 calendar days prior to start of Installation. Government shall review and provide comments within 30 calendar days after receipt.

• Working draft shall incorporate previous Government comments and shall be submitted 10 calendar days prior to start of installation. Contractor shall mark-up working draft with changes discovered during installation.

• Final shall incorporate marked-up changes from installation and shall be submitted no later than 10 calendar days after completion of system installation.

• List of Operational Manuals o Programmable Logic Controller o Blast Booth Operational Manual o Paint Booth Operational Manual

• List of Maintenance Manuals o Mechanical, pneumatic, wiring schematics and drawings o Component location and function o Trouble shooting procedures o Repair Procedures o Electrical and electronic equipment servicing o Adjustment Procedures o Preventative Maintenance Procedures o Controller programming o Haz Waste Ops

BLOCK 14a:

FRCE ACQ: lanivea.m.davis.civ@us.navy.mil

FRCE TPOC: james.a.larsen42.civ@us.navy.mil

FRCE PM: grace.a.lyons4.civ@us.navy.mil

Block 14 b:

● Drafts - Submit one (1) copy as Microsoft Word .doc file

● Final – Submit one (1) copy of manual as Microsoft Word .doc file and five (5) printed copies

FRCE TPOC 2 6

FRCE PM 2 6

2 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Grace Lyons

Project Manager

Fleet Readiness Center East mailto:lanivea.m.davis.civ@us.navy.mil mailto:james.a.larsen42.civ@us.navy.mil mailto:grace.a.lyons4.civ@us.navy.mil

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

C-130 Wheel Well Blast and Paint Booths TBD TBD

A002

Lockout and Tagout Procedure N/A

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-82131 SOW PARAGRAPH 3.6.3

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250

REQ 9. DIST

FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD

3 TIMES (SEE

BLK 16)

SEE BLK 16

a.

ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION Draft Final

16. REMARKS FRCE ACQ 2 6

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

● Submit first draft NLT 60 calendar days prior to start of equipment installation. Government shall review and provide comments within 30 calendar days after receipt.

● Working draft shall incorporate previous Government comments and shall be submitted NLT at start of installation. Contractor shall mark-up working draft with changes discovered during installation.

● Final procedure shall incorporate marked-up changes from installation and shall be submitted no later than 10 calendar days after completion of system installation.

● Final – Submit one (1) copy of manual as Microsoft Word .doc file and five (5) printed copies

FRCE TPOC 2 6

FRCE PM 2 6

2 6 0

Grace Lyons

Form Approved

OMB No. 0704-0188 mailto:lanivea.m.davis.civ@us.navy.mil

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-

0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

C-130 Wheel Well Blast and Paint Booths TBD TBD

A003

Calibration Procedure N/A

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-80906 SOW PARAGRAPH 3.6.4

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250

REQ

9. DIST

FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD

4 TIMES (SEE

BLOCK 16)

SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final

A N/A SEE BLK 16 Reg Repr o

16. REMARKS FRCE ACQ 3 4

● Submit first draft NLT 15 calendar days prior to start of Preliminary Design Review (PDR)

Government shall review and provide comments within 15 calendar days after receipt.

● Submit second draft NLT 15 calendar days prior to start of Final Design Review (FDR). Draft shall incorporate PDR Government comments. Government shall review and provide comments within 15 calendar days after receipt.

● Working draft shall incorporate FDR Government comments and shall be submitted NLT 15 calendar days before start of installation. Contractor shall mark-up working draft with changes discovered during on-site calibration.

● Final procedure shall incorporate marked-up changes from on-site calibration and shall be submitted within seven (7) calendar days after Final Acceptance Test completion.

● Final – Submit one (1) copy of manual as Microsoft Word .doc file and three (3) printed copies

FRCE TPOC 3 4

FRCE PM 3 4

3 4 0

Grace Lyons

Form Approved

OMB No. 0704-0188 mailto:lanivea.m.davis.civ@us.navy.mil

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-

0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

C-130 Wheel Well Blast and Paint Booths TBD TBD

3. SUBTITLE

A004

Product Drawings and Associated Lists N/A

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81002F SOW PARAGRAPH 3.6 & 3.6.7

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ

9. DIST

FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD

4 TIMES (SEE

BLK 16)

SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

A N/A SEE BLK 16 Reg Repr

16. REMARKS FRCE ACQ 3 3

• Submit first draft Technical Data Package (TDP) NLT 15 calendar days prior to

Preliminary Design Review (PDR). Government shall review and provide comments within

15 calendar days after receipt.

• Second draft TDP shall incorporate PDR comments and shall be submitted 15 calendar days prior to Final Design Review (FDR). Government shall review and provide comments within 15 calendar days after each receipt.

• Submit working draft TDP 15 calendar days prior to start of installation. Working draft

TDP shall incorporate FDR comments. Contractor shall mark-up (red-line) working draft with changes made during installation.

• Final record TDP shall incorporate marked-up changes from installation and shall be submitted no later than 10 calendar days after completion of system installation.

• Spare parts lists delivered 30 calendar days post contract award via email to TPOC in .doc format

• Lubrication Chart delivered 30 calendar days post contract award via email to TPOC in .doc format

• Standard tooling and equipment list delivered 30 calendar days post contract award via email to TPOC in .doc format

FRCE TPOC 3 3

FRCE PM 3 3

• Technical Data Package includes, but is not limited to the following: mechanical drawings, electrical drawings, one-line drawings, structural drawings, vendor literature

• The vendor shall submit all layout documents as .DWG files compatible with AutoCAD

2015 via email 15 calendar days post contract award. Each sheet of the layout shall have its own respective .DWG file [If there are 5 sheets in a layout, the GOVT should receive 5

.DWG files.]. The government is not responsible for scaling the equipment in the layout sheets; equipment must be located in the "Model" space of the .DWG file, scaled 1:1, with the base unit as inches. All .DWG files with external references shall be bound before submittal to the GOVT. Reference US Army Corps of Engineers "A/E/C Computer-Aided Design (CAD) Standard" Release 6.1 or newer for further guidance.

● Drafts - Submit one copy of TDP product drawing as or AutoCad .dwg files and two “D” size printed copies.

● Final Record TDP - Submit one copy of TDP product drawing as or AutoCad .dwg files and two “E” size signed, printed copies.

3 3 0

Grace Lyons

Form Approved OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-

0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

C-130 Wheel Well Blast and Paint Booths TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005

Software Media

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-IPSC-81441 SOW PARAGRAPH 3.6.1

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ

9. DIST

C

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD 1 TIME SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

N/A N/A N/A Reg Repr

16. REMARKS FRCE ACQ 1

SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

BLOCK 12:

Submit NLT at completion of Final Acceptance Test.

• All of the following shall be delivered via flash drive o Programmable Logic Controller

FRCE TPOC 1

FRCE PM 1

1 1 0

Grace Lyons

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO

NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

C-130 Wheel Well Blast and Paint Booths TBD TBD

A006

Software Documentation

DI-IPSC-81756 SOW PARAGRAPH 3.6.1

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ

9. DIST

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD 1 TIME SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dra ft

Final

N/A N/A N/A Reg Repr

FRCE ACQ 1

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

BLOCK 12:

Submit NLT at completion of Final Acceptance Test.

1 0

PREPARED BY H. DATE I. APPROVED BY J. DATE

Grace Lyons

Form Approved OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-

0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A007

Plan of Action and Milestones (POA&M)

DI-IPSC-82297 SOW PARAGRAPH 3.6.2

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ 9. DIST

C (SEE BLK

16)

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO ONE/R SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

A N/A SEE BLK 16 Reg Repr

FRCE ACQ 1 1

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

BLOCK 12 & 13:

Submit initial Plan of Action and Milestones (POA&M) with proposal. Submit final POA&M at Post Award Conference for review and final approval. The Government and the contractor shall review the POA&M monthly to determine project status. Any changes to the schedule must be approved in advance by the Government.

Block 14b:

Electronic delivery of POA&M as .pdf file to ACQ, TPOC, and PM is acceptable.

FRCE TPOC 1 1

FRCE PM 1 1

Grace Lyons

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A008

Site Preparation and Installation Plan

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80033A SOW PARAGRAPH 3.7.3

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ 9. DIST

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO ONE/R SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

A N/A N/A Reg Repr

FRCE ACQ 1 1

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

Submit initial Site Preparation and Installation Plan 15 calendar days prior to Preliminary Design

Review. Government shall review and provide comments at Preliminary Design Review. Submit final Plan at Final Design Review for review and final approval.

BLOCK 14b:

Electronic delivery of Site Preparation and Installation Plan as .pdf file to ACQ, TPOC, and PM is acceptable.

Grace Lyons

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A009

Acceptance Test Plan

DI-NUSU-82339 SOW PARAGRAPH 3.6.5 & 4.5

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ 9. DIST

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

N/A ONE/R SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

16. REMARKS FRCE ACQ 1 1

Submit initial Acceptance Test Plan 15 calendar days prior to Preliminary Design Review.

Government shall review and provide comments at Preliminary Design Review. Submit final plan at Final Design Review for review and final approval.

The Acceptance Test Plan shall incorporate, but is not limited to the following:

• Contract Quality Assurance Inspection (Origin)

• Final Inspection/Acceptance Test Plan (Destination)

• Operational Test

• Abrasive Blast Test

• Paint Test

• Performance Test

• Audible Noise Level Test

Electronic delivery of Acceptance Test Plan as .pdf file to ACQ, TPOC, and PM is acceptable.

Grace Lyons

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A010

Conference Agenda

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81249 SOW PARAGRAPH 3.6.6

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ 9. DIST

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

N/A SEE BLK 16 SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

A N/A N/A Reg Repr

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

BLOCK 10:

Frequency is determined based on occurrences of conferences and scheduled meetings

Minutes required NLT 7 calendar days prior to conferences and scheduled meetings.

Electronic delivery of Conference Agenda as .pdf file to ACQ, TPOC, and PM is acceptable.

Grace Lyons

Form Approved

OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A011

Conference Minutes

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81250 SOW PARAGRAPH 3.6.6

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ 9. DIST

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

N/A SEE BLK 16 SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dr aft

Final

A N/A N/A Reg Repr

AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT

BLOCK 10:

Frequency is determined based on occurrences of conferences and scheduled meetings

Minutes required NLT 7 calendar days after conferences and scheduled meetings. Minutes to include action item status.

Electronic delivery of Conference Minutes as .pdf file to ACQ, TPOC, and PM is acceptable.

Grace Lyons

Form Approved OMB No. 0704-0188

The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis

Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0000 A TDP TM OTHER R&D

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A012

Training Plan

DI-PSSS-82210 SOW PARAGRAPH 3.8

FLEET READINESS CENTER EAST,

CHERRY POINT, NC 28533

7. DD 250 REQ

9. DIST

C

FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

N/A ONE/R SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION Dra ft

Final

A N/A SEE BLK 16 Reg Repr

Contractor’s format is acceptable.

Submit initial Training Plan 15 calendar days prior to Preliminary Design Review. Government shall review and provide comments at Preliminary Design Review. Submit final plan at Final Design

Review for review and final approval.

• 3.8 Training for Government Personnel.

o Sign off sheets - pdf

• 3.8.1 Operator Training o Syllabus - pdf o Sign off sheets - pdf

• 3.8.2 Maintenance Training o Syllabus - pdf o Sign off sheets - pdf

• 3.8.3 Hazmat Training o Syllabus - pdf o Sign off sheets - pdf

Block 14b:

Electronic delivery of Training Plan, Syllabus and Sign Off Sheets as .pdf file to ACQ, TPOC, and

PM is acceptable.

0 3 0

PREPARED BY H. DATE I. APPROVED BY J. DATE

Grace Lyons

File details come from the government source that posted it. Updated .