This is a DD Form 1423 (Contract Data Requirement List) for an Army contract involving the manufacture of ammunition holders (NSN: 1398-01-330-9529). The document establishes data deliverables and submission requirements for an open contract that is not yet awarded (Contract/PR No. and Contractor both listed as TBD).
The contract requires six key data items: (A001) Engineering Change Proposals; (A002) Requests for Variance; (A003) Notices of Revision; (A004) Test Procedure for pre-production light phosphate coating processes, due 60 days after contract award; (A005) First Article Test Report, due as required; and (A006) Acceptance Inspection Equipment Report, due prior to production or first article testing. All data must be submitted in government-compatible software (Microsoft Office or PDF format) electronically to Procuring Contracting Officer Scott L. Follen (scott.l.follen2.civ@army.mil) and Contract Specialist Haley R. Bruns (haley.r.bruns.civ@army.mil), with copies to the Administrative Contracting Office and engineering points of contact. Documentation must comply with SAE-EIA-649-1 standards and utilize specified DD Forms (1692, 1694, 1695). The requiring office is FCDD-ACE-QPA, with technical and quality requirements referenced in Row 9 for change-related items and Rows 12-18 for testing and inspection items. Distribution statements are based on the most restrictive classification of affected items. All delivery dates are either as required (ASREQ) or tied to specific contract milestones such as contract award or production initiation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOAST RFOP PANDTA-24-P-0000 004297 REV 08 SEPTEMBER 2026.xlsx | XLSX spreadsheet | |
| BOAST RFOP PANDTA-24-P-0000 004297 REV 20 AUGUST 2026.xlsx | XLSX spreadsheet | |
| Operations Security (OPSEC) Plan Dated 01 July 2023.pdf | ||
| Exhibit A Contract Data Requirements List (CDRL) A001-A005.pdf | ||
| BOAST RFOP PANDTA-24-P-0000 004297.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB
No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY:
TDP _X_ TM OTHER
D. SYSTEM/ITEM: HOLDER, AMMUNITION, NSN: 1398-01-330-9529
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO: A001
2. TITLE: ENGINEERING CHANGE PROPOSAL (ECP)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80639E
5. CONTRACT REFERENCE: TECHNICAL & QUALITY REQUIREMENT ROW 9
6. REQUIRING OFFICE: FCDD-ACE-QPA
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT
OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE
DISTRIBUTION STATEMENT ASSIGNED TO THE ECP SHALL BE THE MOST RESTRICTIVE
DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE ECP. **SUBMIT
ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT
scott.l.follen2.civ@army.mil AND CONTRACT SPECIALIST AT haley.r.bruns.civ@army.mil ; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING
OFFICE AT (TBD) AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil. DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.1 OF
SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1692 (CURRENT REVISION) LOCATED
AT http://www.dtic.mil/whs/directives/infomgt/forms/.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
mailto:scott.l.follen2.civ@army.mil mailto:haley.r.bruns.civ@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil http://www.dtic.mil/whs/directives/infomgt/forms/
G. PREPARED BY: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil
H: DATE: 11 JULY 2024
I: APPROVED BY: JACOB COPLEY
J: DATE: 11 JULY 2024
1. DATA ITEM NO: A002
2. TITLE: REQUEST FOR VARIANCE (RFV)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80640E
5. CONTRACT REFERENCE: TECHNICAL & QUALITY REQUIREMENT ROW 9
6. REQUIRING OFFICE: FCDD-ACE-QPA
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE
DISTRIBUTION STATEMENT ASSIGNED TO THE RFV SHALL BE THE MOST RESTRICTIVE
DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE RFV. **SUBMIT
ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT
scott.l.follen2.civ@army.mil AND CONTRACT SPECIALIST AT haley.r.bruns.civ@army.mil; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING
OFFICE AT (TBD) AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil. DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.2 OF
SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1694 (CURRENT REVISION) LOCATED
AT http://www.dtic.mil/whs/directives/infomgt/forms/.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil
H: DATE: 11 JULY 2024
I: APPROVED BY: JACOB COPLEY
J: DATE: 11 JULY 2024
1. DATA ITEM NO: A003
2. TITLE: NOTICE OF REVISION (NOR)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80642E
5. CONTRACT REFERENCE: TECHNICAL & QUALITY REQUIREMENT ROW 9
6. REQUIRING OFFICE: FCDD-ACE-QPA
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:scott.l.follen2.civ@army.mil mailto:haley.r.bruns.civ@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil http://www.dtic.mil/whs/directives/infomgt/forms/ mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE
DISTRIBUTION STATEMENT ASSIGNED TO THE NOR SHALL BE THE MOST RESTRICTIVE
DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE NOR. **SUBMIT
ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT
scott.l.follen2.civ@army.mil AND CONTRACT SPECIALIST AT haley.r.bruns.civ@army.mil; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING
OFFICE AT (TBD) AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil. DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.4 OF
SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1695 (CURRENT REVISION) LOCATED
AT http://www.dtic.mil/whs/directives/infomgt/forms/.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil
H: DATE: 11 JULY 2024
I: APPROVED BY: JACOB COPLEY
J: DATE: 11 JULY 2024
1. DATA ITEM NO.: A004
2. TITLE OF DATA ITEM: TEST PROCEDURE
3. SUBTITLE: PRE-PRODUCTION PROCEDURE, LIGHT PHOSPHATE COATING
4. AUTHORITY: DI-NDTI-80603A
5. CONTRACT REFERENCE: TECHNICAL & QUALITY REQUIREMENT ROW 12 and Paragraphs
3.2.1 and 3.2.2 of the Federal Specification TT-C-490F, TYPE 1
6. REQUIRING OFFICE: RDAR-MEE-W(R)
7. DD250 REQ: Not required
8. APP CODE: A (SEE BLOCK 16)
9. DIST. STATEMENT: D
10. FREQUENCY: ONE/R
11. AS OF DATE: Date of Contract Award
12. DATE OF FIRST SUB: 60DAC
13. DATE OF SUBS: N/A
14. DISTRIBUTION:
A. ADDRESSEES: Scott L. Follen, Contracting Officer, scott.l.follen2.civ@army.mil and Haley R. Bruns, Contract Specialist, haley.r.bruns.civ@army.mil, and mark.a.godlewski.civ@army.mil
B. COPIES: 2
DRAFT:
FINAL: 2
15. TOTAL: 2
16. REMARKS: BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THROUGH THE
CONTRACTING OFFICER IS REQUIRED WIHTIN 60 CALENDAR DAYS AFTER CONTRACT AWARD.
CONTRACTING OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (RDAR-MEE-
mailto:scott.l.follen2.civ@army.mil mailto:haley.r.bruns.civ@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil http://www.dtic.mil/whs/directives/infomgt/forms/ mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:scott.l.follen2.civ@army.mil mailto:haley.r.bruns.civ@army.mil mailto:mark.a.godlewski.civ@army.mil
W(R)). CONTRACTING OFFICER SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO
CONTRACTOR. COATED PANELS PER PARA 3.2.2 of TT-C-490F SHALL INCLUDE THREE WITH
PHOSPHATE ONLY, THREE WITH PHOSPHATE AND PRIMER, AND THREE WITH PHOSPHATE,
PRIMER AND TOP COAT. CONTRACTOR FORMAT ACCEPTABLE.
G.
H:
I:
J:
PREPARED BY: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil
DATE: 11 JULY 2024
APPROVED BY: JACOB COPLEY
DATE: 11 JULY 2024
1. DATA ITEM NO.: A005
2. TITLE OF DATA ITEM: FIRST ARTICLE TEST REPORT (FATR)
3. SUBTITLE: TEST/INSPECTION REPORT
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: TECHNICAL & QUALITY REQUIREMENT ROW 14, 15 AND 18
6. REQUIRING OFFICE: RDAR-EIQ-P
7. DD250 REQ: Not required
8. APP CODE: A (SEE BLOCK 16)
9. DIST. STATEMENT: D
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUB: SEE ITEM 16
13. DATE OF SUBS: SEE ITEM 16
14. DISTRIBUTION:
A. ADDRESSEES: Scott L. Follen, Contracting Officer, scott.l.follen2.civ@army.mil and Haley R. Bruns, Contract Specialist, haley.r.bruns.civ@army.mil, and mark.a.godlewski.civ@army.mil
B. COPIES: 3
DRAFT:
FINAL: 3
15. TOTAL: 3
16. REMARKS: REQUIRED BY THE AUTHORITY IN ITEM 4, PARA 10.2 AND ITS
SUBPARAGRAPHS.
H: DATE: 05 AUGUST 2026
I: APPROVED BY: MICHELLE LERRO
J: DATE: 05 AUGUST 2026
1. DATA ITEM NO.: A006
2. TITLE OF DATA ITEM: ACCEPTANCE INSPECTION EQUIPMENT (AIE) REPORT
3. SUBTITLE: SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE DOCUMENTATION
4. AUTHORITY: DI-MGMT-81979
5. CONTRACT REFERENCE: TECHNICAL & QUALITY REQUIREMENT ROW 13
6. REQUIRING OFFICE: RDAR-EIQ-P
7. DD250 REQ: Not required
8. APP CODE: A (SEE BLOCK 16)
9. DIST. STATEMENT: D
10. FREQUENCY: ASREQ
11. AS OF DATE: DATE OF CONTRACT AWARD
12. DATE OF FIRST SUB: SEE ITEM 16
13. DATE OF SUBS: SEE ITEM 16
14. DISTRIBUTION:
mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:scott.l.follen2.civ@army.mil mailto:haley.r.bruns.civ@army.mil mailto:mark.a.godlewski.civ@army.mil
A. ADDRESSEES: Scott L. Follen, Contracting Officer, scott.l.follen2.civ@army.mil and Haley R. Bruns, Contract Specialist, haley.r.bruns.civ@army.mil, usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil, and usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil
B. COPIES: 3
DRAFT:
FINAL: 3
15. TOTAL: 3
16. REMARKS: ITEM 12: PRIOR TO INITIATION OF PRODUCTION OR FIRST
ARTICLE TEST, IF CONTRACTUALLY REQUIRED.
H: DATE: 12 AUGUST 2026
I: APPROVED BY: MICHELLE LERRO
J: DATE: 12 AUGUST 2026
mailto:scott.l.follen2.civ@army.mil mailto:haley.r.bruns.civ@army.mil mailto:usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil mailto:usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil
File details come from the government source that posted it. Updated .