This is a Request for Order Proposal (RFOP) under the Basic Ordering Agreement Sustainment Track (BOAST) program issued by Army Contracting Command – Detroit Arsenal on August 6, 2026, with responses due by September 8, 2026, at 3:00 PM Eastern. The solicitation is a Total Small Business Set-Aside for the supply of Ammunition Holders (NSN 1398-01-330-9529, Part Number 12916856) with a required quantity of three units. Award will be made on a firm-fixed-price basis to the lowest-priced responsible BOA holder; all proposals must be submitted electronically with the subject line "Proposal for RFOP-PANDTA-24-P-0000 004297 - [Your Company Name]." To be eligible, vendors must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time—proposals from vendors without an executed BOA will be deemed ineligible and will not be evaluated. The Government's evaluation criteria is price only, with price evaluated for reasonableness.

The delivery schedule includes a First Article Test (FAT) unit to be delivered within 210 calendar days After Receipt of Order (ARO), with the Government requiring up to 30 days for FAT evaluation and written approval/disapproval. The Government's objective is to receive the production quantity of three units within 150 calendar days from the date of written FAT approval. There is one unexercised option period representing 12 months with an estimated quantity of three units, to be delivered within 150 calendar days ARO or from the date of FAT approval, whichever is later. The supplies are classified as non-commercial under NAICS 332993 with a size standard of 1,500 employees. Delivery is FOB Destination to DLA Distribution Anniston (36201-4199). The contract includes mandatory compliance with Buy American requirements (DFARS 252.225-7001), light phosphate coating per Federal Specification TT-C-490, ISO 9001:2015 quality management standards, military preservation and packaging per MIL-STD-2073-1 and Special Packaging Instruction 12916856, acceptance inspection at origin, and multiple Defense Federal Acquisition Regulation (DFARS) clauses addressing controlled unclassified information, cybersecurity, export control, and technical data rights. Payment terms are Net 30 days from receipt of invoice and acceptance of goods. The technical data package is export-controlled and requires vendors to have current DD Form 2345 certification in the Joint Certification Program (JCP) to access the TDP via SAM.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFOP

BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)

NOTICE ID: PANDTA-24-P-0000 004297 DATE ISSUED: 6-Aug-2026 RESPONSE DUE: 08-Sep-2026, 3:00 PM Eastern

ISSUE BY:U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA)CONTRACTOR:
ATTN:BOAST@army.milUIE / CAGE:
Haley Bruns, Contract Specialist, haley.r.bruns.civ@army.milADDRESS:
Scott L. Follen, Contracting Officer, scott.l.follen2.civ@army.milPOC NAME:
POC EMAIL:
POC PHONE:
BOA NUMBER:

GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program.

II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.

III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 28 August 2026, 3:00 PM Eastern

REQUIREMENT DETAILSSupply / Service:Holder, Ammunition
NSN / Description:1398-01-330-9529
TDP / DWG No .TDPL 12916856, Dated 21 February 2024
Commerciality:Non-Commercial
NAICS:332993
Size Standard:1,500
Set-Aside Status:Small Business Set-Aside
Small Business Subcontracting Plan:Not Required
Order Rating:DO
Packaging Level:Military B - Special Packaging Instructions (SPI) 12916856 - Dated 03 Apr 2019 - Rev A
Ship-To Location:SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

Inspect / Accept:Origin
FOB:Destination
Delivery Schedule:Schedule with First Article Test (FAT) Requirement:

The First Article Test (FAT) unit(s) specified in CLIN 0001AB shall be delivered within 210 calendar days ARO. Alternative schedules for the FAT unit(s) will not be considered. The Government requires up to 30 days for FAT evaluation and written approval/disapproval.

Alternate delivery schedules for the production units will be considered for this order. See Evaluation for Award Below.

The Government's objective is to receive a quantity of 3ea on CLIN 0001AA within 150 calendar days from the date of written FAT approval. There is one option period, representing a 12 month time period with a estimated quantity of 3ea on CLIN 0002AA. If the option is exercised, the Government's requirement is to receive the option quantity within 150 calendar days After Receipt of Order (ARO), or from the date of written FAT approval, whichever is later. Options may be exercised incrementally. Offerors may propose an accelerated delivery schedule that is earlier than the Government's requirement. The proposed schedule, stated in days ARO, must be clearly identified in your proposal.

Any acceleration in First Article Test Approval will be subtracted from the delivery schedule of the production units.

All Production and Option deliveries MUST be scheduled by the contracor with the depot at least 10 days prior to the delivery date.

PRICING SHEET
Line ItemDescriptionNounNSNPart No.PRON / 1095QuantityUnit of MeasureDel Sch / RateUnit PriceTotal PriceNotes
0001AAProduction QuantityHolder, Ammunition1398-01-330-952912916856EH4C0343EH3EA0
0001ABFirst Article Test (FAT) ReportFirst Article Test (FAT)1398-01-330-952912916856TBD1LO0
0002AAUnexercised Option QuantityHolder, Ammunition1398-01-330-952912916856TBD3EA0
A001Data RequirementEngineering Change Proposal (ECP)See Technical & Quality Requirement - Configuration Management and Exhibit A Contract Data Requirements List (CDRL) A001-A0050Not Separately Priced
A002Data RequirementRequests For Variance (RFV)See Technical & Quality Requirement - Configuration Management and Exhibit A Contract Data Requirements List (CDRL) A001-A0050Not Separately Priced
A003Data RequirementNotice Of Revision (NOR)See Technical & Quality Requirement - Configuration Management and Exhibit A Contract Data Requirements List (CDRL) A001-A0050Not Separately Priced
A004Data RequirementTest Procedure - Light Phosphate CoatingSee Technical & Quality Requirement - Light Phosphate Coating and Exhibit A Contract Data Requirements List (CDRL) A001-A0050Not Separately Priced
A005Data RequirementFirst Article Test Report (FATR)See Technical & Quality Requirement - Configuration Management and Exhibit A Contract Data Requirements List (CDRL) A001-A0050
0
Order Total$ - 0
PROPOSAL SUBMISSION INSTRUCTIONSProposal Content:Submission shall consist of a completed and signed Pricing Sheet contained in this RFOP. No separate technical proposal is required. The Government intends to evaluate proposals and award an order without discussions.
Submission Method:Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-PANDTA-24-P-0000 004297 - [Your Company Name]". Late proposals will not be evaluated.
Period of AcceptanceProposals shall remain firm for at least 60 calendar days from the closing date of this RFOP.
Mandatory Eligibility Requirement For Award:To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated.

EVALUATION FOR AWARD Price Only The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder who submits the lowest-priced proposal. Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.

Evaluation: Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.

In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.

REGULATORY COMPLIANCEBOA Attachment Reference:FAR Part 13_Simplified Procedures for Non-Commercial Acquisitions
Applicable Clauses:See 'Applicable Clauses-Provisions' sheet.
Payment Terms:Net 30 days from receipt of invoice and acceptance of goods.
Buy American / Trade Agreements:
(Select One)Buy American and Balance of Payments Program
(DFARS 252.225-7001)XBuy American --Free Trade Agreements--Balance of Payments Program (DFARS 252.225-7036)N/ATrade Agreements (DFARS 252.225-7021)N/A

NAME: DATE:

mailto:BOAST@army.mil Applicable Clauses-Provisions

Applicable Clauses/Provisions
ReferenceDateTitleBOA ReferenceRemarks
52.246-208-01-1996INSPECTION OF SUPPLIES--FIXED-PRICEBOA Attachment 0002 - FAR 13
52.246-1604-01-1984RESPONSIBILITY FOR SUPPLIESBOA Attachment 0002 - FAR 13
252.211-700809-01-2010USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS
252.211-700301-01-2023ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)BOA Attachment 0002 - FAR 13(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government's unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number :__N/A____ Number Item Description: __N/A____

(ii) Items for which the Government's unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number: __N/A____ Item Description: ___N/A____

52.242-1704-01-1984GOVERNMENT DELAY OF WORKBOA Attachment 0002 - FAR 13
52.247-3402-01-2006F.O.B. DESTINATION (JAN 1991)
52.247-4802-01-1999F.O.B. DESTINATION--EVIDENCE OF SHIPMENT
252.232-700601-01-2023WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)BOA Attachment 0002 - FAR 13
252.225-700102-01-2024BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024)BOA Attachment 0002 - FAR 13
252.227-701308-01-2025RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025)
252.227-701501-01-2025TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)
252.227-701601-01-2023RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023)
252.227-702501-01-2025LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025)
252.227-702704-01-1988DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE
252.227-703003-01-2000TECHNICAL DATA--WITHHOLDING OF PAYMENT
252.227-703701-01-2025VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025)
252.232-700312-01-2018ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTSBOA Attachment 0002 - FAR 13
252.243-700112-01-1991PRICING OF CONTRACT MODIFICATIONSBOA Attachment 0002 - FAR 13
252.244-700011-01-2023SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023)
252.247-702310-01-2024TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024)BOA Attachment 0002 - FAR 13
252.204-700010-01-2016DISCLOSURE OF INFORMATIONBOA Attachment 0002 - FAR 13
252.204-700304-01-1992CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCTBOA Attachment 0002 - FAR 13
252.231-700012-01-1991SUPPLEMENTAL COST PRINCIPLESBOA Attachment 0002 - FAR 13
252.232-701012-01-2006LEVIES ON CONTRACT PAYMENTSBOA Attachment 0002 - FAR 13
252.203-700009-01-2011REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALSBOA Attachment 0002 - FAR 13
252.203-700212-01-2022REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022)BOA Attachment 0002 - FAR 13
252.225-704806-01-2013EXPORT-CONTROLLED ITEMSBOA Attachment 0002 - FAR 13
252.204-701501-01-2023NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023)BOA Attachment 0002 - FAR 13
252.204-701205-01-2024SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1)BOA Attachment 0002 - FAR 13
252.204-701801-01-2023PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)BOA Attachment 0002 - FAR 13
252.204-702011-01-2023NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)BOA Attachment 0002 - FAR 13
252.225-705601-01-2023PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023)BOA Attachment 0002 - FAR 13
252.240-799702-01-2026NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026)BOA Attachment 0002 - FAR 13
252.227-798902-01-2026RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026)
252.227-799102-01-2026RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036)

(FEB 2026)

252.227-799502-01-2026DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026)
252.227-799602-01-2026TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026)
252.240-7997 CD02-01-2026NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026)

(DEVIATION 2026-O0025)(FEB 2026)

52.211-502-01-2026MATERIAL REQUIREMENTS (FEB 2026)BOA Attachment 0002 - FAR 13
52.211-1504-01-2008DEFENSE PRIORITY AND ALLOCATION REQUIREMENTSBOA Attachment 0002 - FAR 13
52.222-102-01-1997NOTICE TO THE GOVERNMENT OF LABOR DISPUTESBOA Attachment 0002 - FAR 13
52.232-23 ALT 104-01-1984ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984)
52.243-102-01-2026CHANGES--FIXED PRICEBOA Attachment 0002 - FAR 13
52.247-6802-01-2006REPORT OF SHIPMENT (REPSHIP)BOA Attachment 0002 - FAR 13
52.249-804-01-1984DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)BOA Attachment 0002 - FAR 13
52.226-805-01-2024ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)BOA Attachment 0002 - FAR 13
52.204-1302-01-2026SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026)BOA Attachment 0002 - FAR 13
52.232-4003-01-2023PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023)BOA Attachment 0002 - FAR 13
52.203-1901-01-2017PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTSBOA Attachment 0002 - FAR 13
52.219-3302-01-2026NONMANUFACTURER RULE (FEB 2026)BOA Attachment 0002 - FAR 13
52.219-602-01-2026NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (FEB 2026)
52.240-9102-01-2026SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026)BOA Attachment 0002 - FAR 13
52.204-9102-01-2026CONTRACTOR IDENTIFICATION (FEB 2026)BOA Attachment 0002 - FAR 13
52.222-9004-01-2026ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
52.252-202-01-1998CLAUSES INCORPORATED BY REFERENCE (Feb 1998)
52.252-611-01-2020AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020)BOA Attachment 0002 - FAR 13
52.213-402-01-2026SIMPLIFIED ACQUISITIONS (NON COMMERICIAL) (DEVIATION FEB 2026)BOA Attachment 0002 - FAR 13
52.219-2802-01-2026POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026)BOA Attachment 0002 - FAR 13(1) The Contractor represents that it __ is, __ is not a small business concern under NAICS Code _____ assigned to contract number _____.

(2) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it __ is, __ is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.

(3) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that it __ is, __ is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it __ is, __ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it __ is, __ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __ .]

(6) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that it __ is, __ is not a veteran-owned small business concern.

(7) [ Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it __ is, __ is not a service-disabled veteran-owned small business concern.

(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it __ is, __ is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]

(9) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that (i) It __ is, __ is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It __ is, __ is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [ The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _____.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[ Contractor to sign and date and insert authorized signer's name and title.____________________________ ]

52.204-1912-01-2014INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONSBOA Attachment 0002 - FAR 13
52.240-9302-01-2026BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026)BOA Attachment 0002 - FAR 13
252.227-702806-01-1995TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT
252.203-700509-01-2022REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022)BOA Attachment 0002 - FAR 13
252.204-700810-01-2016COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLSBOA Attachment 0002 - FAR 13
252.225-705308-01-2021REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION
252.204-700710-01-2025ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)BOA Attachment 0002 - FAR 13
252.204-701705-01-2021PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION
252.225-797308-01-2024PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014)
252.239-709804-01-2021PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003)
52.240-9002-01-2026SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS
52.225-1808-01-2018PLACE OF MANUFACTUREBOA Attachment 0002 - FAR 13
252.215-701301-01-2023SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023)BOA Attachment 0002 - FAR 13
252.204-701911-01-2023NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTSBOA Attachment 0002 - FAR 13
252.270-700011-01-2024Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024)BOA Attachment 0002 - FAR 13
252.270-700111-01-2024Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024)BOA Attachment 0002 - FAR 13
52.214-3404-01-1991SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGEBOA Attachment 0002 - FAR 13
52.214-3504-01-1991SUBMISSIONS OF OFFERS IN U.S. CURRENCYBOA Attachment 0002 - FAR 13
52.215-102-01-2026INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026)BOA Attachment 0002 - FAR 13
52.204-702-01-2026SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026)BOA Attachment 0002 - FAR 13
52.211-1404-01-2008NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USEBOA Attachment 0002 - FAR 13
52.252-102-01-1998SOLICITATION PROVISIONS INCORPORATED BY REFERENCEBOA Attachment 0002 - FAR 13
52.252-511-01-2020AUTHORIZED DEVIATIONS IN PROVISIONSBOA Attachment 0002 - FAR 13
52.217-703-01-1989OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEMThe Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.217-502-01-2026EVALUATION OF OPTIONS (FEB 2026)
252.225-700712-01-2018PROHIBITION ON ACQUISITION OF CERTAIN ITEMS FROM COMMUNIST CHINESE MILITARY COMPANIES
52.227-106-01-2020AUTHORIZATION AND CONSENTBOA Attachment 0002 - FAR 13
52.227-206-01-2020NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENTBOA Attachment 0002 - FAR 13
52.227-304-01-1984PATENT INDEMNITY
252.227-701701-01-2025IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE RESTRICTIONS (JAN 2025)
52.227-604-01-1984ROYALTY INFORMATION
52.246-1112-01-2014HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT(a) The contractor shall comply with the higher-level quality standard(s) listed below.

QMS Requirements: ISO 9001:2015 (21 Oct 2015) or equivalent. Tailored by excluding paragraph 8.3

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

252.227-701308-01-2025RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025)
52.246-2608-01-2024REPORTING NONCONFORMING ITEMS (AUG 2024)
52.209-309-01-1989FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING(a) The Contractor shall test __2___ unit(s) of Lot/Item _PN: 12916856 NSN: 1398013309529____ as specified in this contract. At least __15 ___ calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within __210__ calendar days from the date of this contract to __the Contracting Officer and to FDCC ORG EMAIL as follows: usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil___ marked “FIRST ARTICLE TEST REPORT: Contract No. _TBD__, Lot/Item No. __P/N 12916856___." Within __30___ calendar days after the Government receives the test report, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government will take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer will, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

252.227-79902/1/26TECHNICAL DATA-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026)
252.227-79942/1/26LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS

(DEVIATION 2026-O0036) (FEB 2026)

252.227-79972/1/26VALIDATION OF ASSERTED RESTRICTIONS (DEVIATION 2026-O0036) (FEB 2026)
252.227-79922/1/26IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE RESTRICTIONS (DEVIATION 2026-O0036) (FEB 2026)
252.225-70083/1/13RESTRICTION ON ACQUISITION OF SPECIALTY METALS
252.225-70091/1/23RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES CONTAINING SPECIALTY METALS (JAN 2023)
252.225-70107/1/09COMMERCIAL DERIVATIVE MILITARY ARTICLE--SPECIALTY METALS COMPLIANCE CERTIFICATE
52.223-32/1/26HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2026)BOA Attachment 0002 - FAR 13(a) Hazardous material, as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Safety Data Sheet submitted under this contract.

Material (If none, insert None): Identification No.:

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government’s rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to—

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

52.223-11 2/1/26 OZONE-DEPLETING SUBSTANCES (FEB 2026) BOA Attachment 0002 - FAR 13 Warning: Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

* The Contractor shall insert the name of the substance(s).

252.223-7001 12/1/91 HAZARD WARNING LABELS BOA Attachment 0002 - FAR 13 (a) Hazardous material, as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.

(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labeling requirements of one of the following statutes:

(1) Federal Insecticide, Fungicide and Rodenticide Act;

(2) Federal Food, Drug and Cosmetics Act;

(3) Consumer Product Safety Act;

(4) Federal Hazardous Substances Act; or

(5) Federal Alcohol Administration Act.

(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labeled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.

MATERIAL (If None, Insert None.) ACT

(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph (c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.

(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).

52.209-1 2/1/26 QUALIFICATION REQUIREMENTS (a) Definition. As used in this clause—

Qualification requirement means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

(Name) usarmy.detroit.tacom.list.lcmc-competition-management-office@army.mil

(Address) 6501 E. 11 Mile Rd., ATTN: AMSTA-CSC-M, Detroit Arsenal, MI 48397-5000

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror’s Name _____________________________________

Manufacturer’s Name________________________________

Source’s Name _____________________________________

Item Name ________________________________________

Service Identification ________________________________

Test Number _______________________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract will not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

Technical & Quality Requirement

TECHNICAL & QUALITY REQUIREMENTS
NOTES FOR THE CONTRACTING PROFESSIONAL *Delete this section prior to release of RFOP*

Insert only the required Local Narratives or Special Item Requirements dictated by your specific Requirements Package or Technical Data Package (TDP).

TitleInstructions/Narrative
DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx

Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the Technical Data Package instructions. Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

TECHNICAL DATA PACKAGE INFORMATION a. The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X] 2. The TDP for this solicitation (Attachment 0001) resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

PANDTA-24-P-0000 004297

To access the data through SAM:

i. Log on to the SAM web site: https://SAM.gov.

ii. Search for the solicitation number.

iii. Click on the attachment you would like to view.

iv. If the attachment is restricted, request access to the document.

b. TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

c. Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

d. To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

e. Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

f. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

g. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

DRAWING LIMITATIONS a. The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:

i. depict the completed (item(s), and

ii. serve as the basis for inspection of the completed item(s).

b. These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

c. The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

d. The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

e. Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.

REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN (a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan (Attachment 0003), or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan (Attachment 0003) specifies the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the Plan (Attachment 0003) at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.

OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officers Representative (COR) or Procuring Contracting Officer (PCO) upon request.
CONFIGURATION MANAGEMENT DOCUMENTATION

The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP) a. Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete “Counterintelligence Awareness and Reporting for DoD Employees” – CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.

In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:

b. DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381–12 • 13 June 2025 11

c. DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.

d. DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.

e. DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.

f. Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.

g. Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.

h. Personnel with access to Sensitive Compartmented Information and Special Access Programs.

i. Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.

j. Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.

k. Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.

l. Professional and educational exchange programs with foreign governments.

m. These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.

ADDITIONAL GUIDELINES FOR CONTROLLED UNCLASSIFIED INFORMATION a. General: There are types of information that are not classified but that require application of access and distribution controls and protective measures for a variety of reasons. This information is known as controlled unclassified information (CUI). The types of information considered CUI are U.S. Government technical information and information listed at the CUI registry (https://www.archives.gov/cui/registry/category-list ) . When handling CUI material, all personnel are to comply with these requirements and follow their company policy and/or applicable Non-Disclosure Agreement (NDA) concerning the protection of proprietary information in situations not clearly stated herein.

b. Technical Information Description: Any recorded information related to experimental, developmental, or engineering works that can be used to define an engineering or manufacturing process, or can be used to design, procure, produce, support, maintain, operate, repair, or overhaul program material. The data may be graphic or pictorial delineations in media (e.g., computer software, drawings, or photographs), text in specifications, related performance or design documents, or computer printouts.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .