EXHIBIT A - CONSTRUCTION DOCUMENTS.pdf

PDF 2 MB Posted

Attached to
Conner Complex Exterior Site Lighting Improvements FDACS Project No. 1159
Solicitation number
ITB-15341
Issued by
Leon County, Florida

About this file

EXHIBIT A - CONSTRUCTION DOCUMENTS SUMMARY

These are 100% Construction Documents for the Admin Parking Lot Lighting project at the Florida Department of Agriculture and Consumer Services (FDACS) Conner Laboratory Complex Administration Building located at 3125 Conner Blvd., Tallahassee, Florida 32399 (FDACS Project No. 1159). The project involves electrical work for parking lot and site lighting improvements, including the installation of a complete electrical system consisting of new LED lighting fixtures, 25-foot steel poles, underground conduit systems, pull boxes, and associated branch circuits and raceways. The work encompasses demolition of existing lighting infrastructure, installation of new LP2 and LP3 series LED area luminaires mounted on poles, and the creation of underground electrical distribution networks using directional boring and trenching methods. The specifications require compliance with the 2020 National Electrical Code, 2023 Florida Building Code (8th Edition), and applicable NFPA standards. All circuit wiring shall utilize #10 conductors in 3/4-inch conduit, with total lighting load calculated at 2,232 watts (8 amperes at 277 volts) after new lights are installed, controlled through an existing mechanical timeclock to remain in service.

The construction documents establish comprehensive electrical installation standards requiring all materials to be new, UL-listed, and of current manufacture. The contractor must furnish all labor, materials, equipment, and incidentals necessary for complete system installation and provide a one-year guarantee on equipment, materials, and labor from final acceptance. Conduit installation must follow rigid specifications with metal conduit for interior and above-grade exterior work and PVC conduit for embedded or below-grade applications. The documents contain detailed specifications for lighting fixture schedules (including Lithonia Lighting D-Series fixtures and HAPCO pole products), grounding requirements with 5/8-inch by 10-foot ground rods installed in each pullbox with maximum 25-ohm resistance, and comprehensive demolition procedures for removing existing post-top lights and associated wiring while maintaining reusable conduit sections. The contractor must comply with all applicable codes, obtain all required permits and inspections, maintain documentation for exterior envelope product approvals per Florida Statutes 533.842, and submit detailed submittals including manufacturers' data sheets, lighting fixture specifications, pole details, and pullbox requirements before procurement or installation.

View the file

Other files

File Type Posted
EXHIBIT A - CONSTRUCTION DOCUMENTS.pdf PDF
Addenda I - Timeline Revision.pdf PDF
ITB DOA 25 26 74_Final.pdf PDF
Addenda I - Timeline Revision.pdf PDF
ITB DOA 25 26 74_Final.pdf PDF
EXHIBIT B.pdf PDF
EXHIBIT B.pdf PDF
Addenda II - QA Responses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID

RE

VI

SI

ON

DR

AW

N:

RE

VI

EW

ED

DA

TE

TH

ES

E

DR

AW

IN

GS

A

ND

R

EN

DE

RI

NG

S

AR

E

IN

ST

RU

ME

NT

S

OF

S

ER

VI

CE

. T

HE

D

RA

W

IN

GS

A

ND

A

SS

OC

IA

TE

D

CO

PI

ES

T

HE

RE

OF

, I

NC

LU

DI

NG

E

LE

CT

RO

NI

C

ME

DI

A

AN

D

CA

DD

F

ILE

S, A

RE

T

HE

P

RO

PE

RT

Y

OF

A

RC

HI

TE

CT

S:

LE

W

IS

W

HI

TL

OC

K, P A.

A.

T

HE

IR

U

SE

, R

EP

RE

SE

NT

AT

IO

N

OR

R

EP

RO

DU

CT

IO

N

FO

R

AN

Y

PU

RP

OS

E

EX

CE

PT

B

Y W

RI

TT

EN

A

GR

EE

ME

NT

W

IT

H

TH

E

AR

CH

IT

EC

T

IS

P

RO

HI

BI

TE

D.

T

HI

S

CO

PY

RI

GH

T

NO

TI

FI

CA

TI

ON

S

HA

LL

B E

TR

UE

A S

IF

D

IR

EC

TL

Y

PL

AC

ED

O

N

EA

CH

D

RA

W

IN

G

EX

HI

BI

T

OR

R

EN

DE

RI

NG

O N

TH

IS

D

OC

UM

EN

T

AN

D

SH

AL

L N

OT

B

E

RE

MO

VE

D

FR

OM

T

HE

SE

D

OC

UM

EN

TS

Sheet No.:

G1.0

PH

AS

E:

CO

NC

EP

T

SC

HE

M.

D

ES

IG

N

AD

VA

NC

ED

S

CH

EM

. D

ES

IG

N

C

ON

ST

RU

CT

IO

N

DO

CS

0% C

ON

ST

RU

CT

IO

N

DO

CS

DR

AW

N:

DA

TE

C on su lta nt

Description:

Index of Drawings, Standard Abbreviations and General Notes

Jo b

Ti tle

Ad m in

P ar ki ng

L ot

L ig ht in g

FD

AC

S

N o.

: 1

Pr oj ec t #

Ph as e:

5.

0%

C on st ru ct io n D oc um en ts

C lie nt

Fl or id a

D ep ar tm en t O f A gr ic ul tu re

An d C on su m er

S er vi ce s Ta lla ha ss ee

, F lo rid a

Se al

Z :\2

F D

A C

S

- C on t'i ng C on tr ac t '

-'3

1\

5.

B

IM

A dm in P ar ki ng L ot L ig ht in g\

M od el \2

.2

B

IM

A dm in P ar ki ng L ot L ig ht in g.

pl n

Architects Lewis + Whitlock 206 West Virginia St.

Tallahassee, Florida 32301 850,942.1718 www.think3d.net

RE

VI

EW

ED

/25

/25 R.

LE

W

IS

B.

B.

/05 /26

R.

LE

W

IS

B.

B.

SHEET INDEX

Architecture

Electrical

ID

G1.0

E1.0

E1.2

E1.1

E2.0

E3.0

Name

Index of Drawings, Standard Abbreviations and General Notes

General Notes, Legend, and Details

Specifications

Specifications

Demolition Plan

New Work Plan

Current Issue

100% Construction Documents

100% Construction Documents

100% Construction Documents

100% Construction Documents

100% Construction Documents

100% Construction Documents

N

N

N

PROJECT AREA

PROJECT LOCATION

NUMBER INDICATES

SECTION, ELEVATION OR DETAIL

SHEET NUMBER WHERE

ELEVATION, SECTION

OR DETAIL IS DRAWN

A

Architectural General Notes: Index of Drawings:Legend of Architectural Symbols: Standard Abbreviations:

2) ALL DIMENSIONS ARE TO THE FACE OF STUD OR STUD TRACK, CENTER LINE OF STUD OR STUD TRACK, FACE OF MASONRY

AND TO THE CENTER LINE OF STRUCTURAL STEEL COLUMNS, UNLESS OTHERWISE INDICATED.

3) WHERE STRUCTURAL DESIGN LOADS ARE NOT PROVIDED FOR ANY COMPONENTS REQUIRING MANUFACTURER

OR FABRICATOR ENGINEERING, AND MINIMUM LOADING CONDITIONS ARE NOT PROVIDED IN APPLICABLE CODES

AND STANDARDS, CONSULT ARCHITECT PRIOR TO PROCEEDING.

13) THE CONTRACTOR SHALL ERECT AND MAINTAIN ALL REASONABLE SAFEGUARDS FOR SAFETY AND HEALTH, INCLUDING

POSTING DANGER SIGNS AND OTHER WARNING AGAINST HAZARDS, AS WELL AS PROMULGATING SAFETY STANDARDS.

4) DIMENSIONS FOR PATHS OF EGREES INCLUDING CORRIDORS AND STAIRS SHALL MEAN CLEAR WIDTH BETWEEN CORRIDOR

WALLS, AND AT STAIRS CLEAR WIDTH BETWEEN WALLS OR CURBS.

6) IF AN ORDER OF PRECEDENT FOR THE INTERPRETATION OF DOCUMENTS IS NOT PROVIDED IN THE PROJECT MANUAL (IF

PROVIDED), AND A CONFLICT OCCURS IN THE SPECIFICATIONS, ON THE DRAWINGS, OR BETWEEN THE DRAWINGS AND

SPECIFICATIONS, CONTACT THE ARCHITECT. ALL REQUEST FOR CLARIFICATION TO THE ARCHITECT SHALL BE MADE IN WRITING.

THE ARCHITECT'S RESPONSE SHALL BE MADE IN WRITING AND NO FORMAL INSTRUCTIONS SHALL BE GIVEN VERBALLY.

8) ALL FIRE RATED PARTITION OR WALL ASSEMBLIES SHALL EXTEND FROM THE FLOOR SLAB TO THE UNDERSIDE OF THE

BUILDING STRUCTURE AND/OR DECK ABOVE. ALL PENETRATIONS IN RATED CONSTRUCTION SHALL BE PROPERLY SEALED TO

INSURE THE RATING IS MAINTAINED.

15) THE CONTRACTOR SHALL MAINTAIN A CLEAN WORK PREMISE AT ALL TIMES AND SHALL CLEAN CONSTRUCTION SITE OF

ALL DEBRIS DAILY. THE WORK PREMISE SHALL BE CLEAN AT COMPLETION OF JOB AND BEFORE FINAL PAYMENT IS MADE.

9) ALL FIRE RATED FLOOR/CEILING OR ROOF/CEILING ASSEMBLIES SHALL BE CONTINUOUS BETWEEN PARTITIONS AND/OR WALLS

FOR THE SPACE OR HORIZONTAL AREA INDICATED. ALL PENETRATIONS IN RATED CONSTRUCTION SHALL BE PROPERLY SEALED

TO INSURE THE RATING IS MAINTAINED.

16) THE CONTRACTOR SHALL TAKE CARE NOT DAMAGE EXISTING SURFACES AND SHALL BE RESPONSIBLE FOR RESTORING

AREAS DAMAGED BY THE CONTRACTOR (MATERIALS, FINISHES, ETC.) TO THEIR ORIGINAL CONDITIONS. SURFACES SHALL BE

REPAINTED TO MATCH EXISTING ADJACENT FINISHES.

10) TYPICAL AND STANDARD DETAILS MAY BE PROVIDED IN THE DRAWINGS. IF A SPECIFIC DETAIL IS NOT PROVIDED

FOR CONDITION OF FABRICATION AND/OR INSTALLATION, CONTACT THE ARCHITECT PRIOR TO PROCEEDING.

11) THE INSTALLATION OF MECHANICAL, PLUMBING AND ELECTRICAL ITEMS (INCLUDING UTILITIES, ROUGH-INS, SYSTEM

COMPONENTS AND FINISHED FIXTURES) IN EXPOSED TO VIEW AREAS OR SPACES SHALL BE UNDERTAKEN WITH SKILL AND

CRAFTMANSHIP TO PROVIDE A FINISHED CONDITION ACCEPTABLE TO THE ARCHITECT. ALL EXPOSED TO VIEW ITEMS SHALL

BE FINISHED WITH PAINT UNLESS OTHERWISE SPECIFIED TO BE PREFINISHED OR NOT TO BE PAINTED.

12) THESE GENERAL NOTES HAVE THE SAME AUTHORITY AS OTHER NOTES AND REFERENCES IN THE DRAWINGS OR

SPECIFICATIONS AND SHALL NOT BE EXCLUDED IN THE EXECUTION OF THE WORK. THEY MAY REQUIRE COORDINATION

BETWEEN VARIOUS TRADE CONTRACTORS. IN ADDITION TO THESE GENERAL NOTES, REFER TO DEMOLITION AND

CONSTRUCTION NOTES SPECIFIC TO EACH DRAWING.

1) THESE DRAWINGS AND RENDERINGS ARE INSTRUMENTS OF SERVICE. THE DRAWINGS AND COPIES THEREOF, INCLUDING ELECTRONIC MEDIA AND CAD FILES, ARE THE PROPERTY OF ARCHITECTS: LEWIS + WHITLOCK, P.A. THEIR

USE, REPRESENTATION OR REPRODUCTION IN ACTUAL FORM OR CONTENT BY ANY ENTITY THAT POSSESSES THEM FOR

ANY PURPOSE EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT IS PROHIBITED. THE COPYRIGHT NOTIFICATION

SHALL BE TRUE AS IF DIRECTLY PLACED ON EACH DRAWING, DETAIL, EXHIBIT OR RENDERING ON THIS DOCUMENT AND

SHALL NOT BE REMOVED FROM THESE DOCUMENTS.

14) THE CONTRACTOR SHALL BE RESTRICTED TO AREAS SPECIFIED BY THE OWNER FOR ON-SITE STORAGE OF MATERIALS

5) DO NOT SCALE DRAWINGS, IF THERE IS A CONFLICT IN DIMENSIONS OR IF THERE IS INSUFFICIENT DIMENSIONING, CONTACT THE

ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING.

7) WHERE CLEAR DIMENSIONS ARE INDICATED, THIS SHALL MEAN CLEAR WIDTH FROM FINISHED WALL TO FINISHED

WALL OR CLEAR FLOOR AREA BETWEEN BUILDING COMPONENTS.

Area Map

-AIR CONDITIONING

-AMERICAN CONCRETE INSTITUTE

-ACOUSTICAL CEILING TILE

-ADJACENT

-ABOVE FINISH FLOOR

-ALTERNATE

-ALUMINUM

-AMERICAN SOCIETY OF TSTG. & MTLS.

-BOARD

-BUILDING

-BOLT

-BEAM

-BOTTOM

-BEARING

-CENTER TO CENTER

-CEMENT

-CUBIC FEET

-CUBIC FEET PER MINUTE

-CORNER GUARD

-CIRCLE, CIRCULAR

-CAST-IN-PLACE

-CONTROL JOINT

-CEILING

-CLOSET

-CLEARANCE, CLEAR

-CONCRETE MASONRY UNIT

-COLUMN

-COMPRESSOR, COMPOSITE

-CONCRETE

-CONSTRUCTION

-CONTINUOUS

-CORRUGATED

-COUNTERSINK

-CENTER

-DOUBLE

-DIRECT APPLIED EXT FINISH SYSTEM

-DEGREES

-DETAIL

-DRINKING FOUNTAIN

-DIAMETER

-DIMENSION

-DOWN

-DOWNSPOUT

-DETAIL

-DRAWING

-EACH

-EXPANSION JOINT

-ELECTRICAL

-ELEVATOR, ELEVATION

-ENCLOSURE

-EQUAL

-EQUIPMENT

-ELECTRICAL WATERCOOLER

-EXHAUST

-EXISTING

-EXTERIOR

A/C

ACI

ACT

ADJ

AFF

ALT

ALUM

ASTM

BD

BLDG

BLT

BM

BOT

BRG

C/C

CEM

CF

CFM

CG

CIR

CIP

CJ

CLG

CLO

CLR

CMU

COL

COMP

CONC

CONSTR

CONT

CORR

CS

CTR

DBL

DEFS

DEG

DTL

DF

DIA

DIM

DN

DS

DTL

DWG

EA

EJ

ELEC

ELEV

ENCL

EQ

EQUIP

EWC

EXH

EX

EXT

FD

FEB

FEC

FF

FHC

FIN

FL

FLG

FT

FTG

GA

GALV

GEN

GND

GWB

GYP

HC

HDR

HDRL

HM

HORZ

HGT

ID

IN

INSUL

INT

JAN

JB

JT

K

KD

L

LAM

LAV

LBS

LH

LL

LLH

LLV

LTL

LTWT

LVR

-FLOOR DRAIN

-FIRE EXTINGUISHER W/ BRACKET

-FIRE EXTINGUISHER IN CABINET

-FINISH FLOOR

-FIRE HOSE CABINET

-FINISH

-FLOOR

-FLASHING

-FOOT OR FEET

-FOOTING

-GAUGE

-GALVANIZED

-GENERAL

-GROUND

-GYPSUM WALLBOARD

-GYPSUM

-HANDICAPPED ACCESSIBLE

-HEADER

-HANDRAIL

-HOLLOW METAL

-HORIZONTAL

-HEIGHT

-INSIDE DIAMETER (DIM.)

-INCHES

-INSULATION

-INTERIOR

-JANITOR

-JAMB

-JOINT

-KIPS (KILO POUND OR 1000LBS.)

-KILN DRIED

-STEEL ANGLE, LENGTH

-LAMINATED

-LAVATORY

-POUNDS

-LEFT HAND

-LIVE LOAD

-LONG LEG HORIZONTAL

-LONG LEG VERTICAL

-LINTEL

-LIGHTWEIGHT

-LOUVER

M

MATL

MAX

MC

MECH

MTL

MEZZ

MFR

MIN

MISC

MK

MO

MTD

MULL

N

NA

NIC

NOM

NS

NTS

OA

OC

OD

OH

OPP

OPPH

PCF

PKG

PL

PLAM

PLYWD

PNL

PR

PREFAB

PREP

PSF

PSI

PT

PVC

PVMT

QC

QT

REF

REINF

REQD

REV

RH

RM

RO

-METER

-MATERIAL

-MAXIMUM

-MEDICINE CABINET

-MECHANICAL

-METAL

-MEZZANINE

-MANUFACTURER

-MINIMUM

-MISCELLANEOUS

-MARK

-MASONRY OPENING

-MOUNTED

-MULLION

-NORTH

-NOT APPLICABLE

-NOT IN CONTRACT

-NOMINAL

-NON SHRINK

-NOT TO SCALE

-OVERALL

-ON CENTER

-OUTSIDE DIAMETER

-OVERHEAD

-OPPOSITE

-OPPOSITE HAND

-POUNDS PER CUBIC FOOT

-PARKING

-PLATE

-PLASTIC LAMINATE

-PLYWOOD

-PANEL

-PAIR

-PREFABRICATED

-PREPARATION

-POUNDS PER SQUARE FOOT

-POUNDS PER SQUARE INCH

-PRESSURE TREATED, PAINT, POINT

-POLYVINYL CHLORIDE

-PAVEMENT

-QUALITY CONTROL

-QUARRY TILE

-REFERENCE

-REINFORCED, REINFORCEMENT

-REQUIRED

-REVISION

-RIGHT HAND

-ROOM

-ROUGH OPENING

SAN

SC

SECT

SEW

SF

SGL

SIM

SJ

SPKLR

SQ

SST

STD

STL

STOR

STRUCT

SUSP

TBD

TEL

TEMP

T&G

THK

TOB

TOC

TOF

TOS

TS

TV

TYP

UNF

UON

UR

VCT

VB

VERT

VEST

VFY

VOL

VT

W/ W/C

WD

W/O

WP

WWF

-SANITARY

-SOLID CORE

-SECTION

-SEWER

-SQUARE FEET

-SINGLE

-SIMILAR

-SAWED JOINT

-SPRINKLER

-SQUARE

-STAINLESS STEEL

-STANDARD

-STEEL

-STORAGE

-STRUCTURAL

-SUSPENDED

-TO BE DETERMINED

-TELEPHONE

-TEMPORARY, TEMPERATURE

-TONGUE & GROOVE

-THICK

-TOP OF BEAM

-TOP OF CONCRETE

-TOP OF FOOTING

-TOP OF STEEL

-STRUCTURAL TUBE STEEL

-TELEVISION

-TYPICAL

-UNFINISHED

-UNLESS OTHERWISE NOTED

-URINAL

-VINYL COMPOSITION TILE

-VAPOR BARRIER

-VERTICAL

-VESTIBULE

-VERIFY

-VOLUME

-VINYL TILE

-WITH

-WATER CLOSET

-WOOD

-WITHOUT

-WATERPROOF, WORKING POINT

-WELDED WIRE FABRIC

Location Map

Applicable Codes:

3125 Conner Blvd

A1.1

A1.1

TO BREAK OFF PARTS OF DRAWING

FINISH COLOR

DEMOLITION NOTES

ALPHABETICAL

CONSTRUCTION NOTES

NUMERICAL

REVISION

DOUBLE DASHED LINE

PROPERTY LINES, BOUNDRY LINES

DASHED LINES

HIDDEN, FUTURE, OR EXIST. CONST. TO BE REMOVED

BREAK LINE

SINGLE DASH LINE

PROJECT NORTH

BUILDING SECTION REFERENCE

WALL SECTION REFERENCE

DETAIL REFERENCE

INTERIOR ELEVATION

ELEVATION REFERENCE

C1

COLUMN LINES

ELEVATION

REFERENCE POINT

DASH AND DOT

FIRE RATED WALLS

A1.1

A1.1

A1.1

A1.1

A1.1D###

DOOR NUMBER

Florida Building Code, Building (FBC-B)

Florida Building Code, Plumbing

Florida Fire Prevention Code (FFPC) National Electrical Code (NEC)

Florida Building Code, Mechanical Florida Building Code, Fuel Gas

8th Edition

8th Edition

Florida Building Code, Existing Building (FBC-EB) 8th Edition

2020 Edition

8th Edition 8th Edition 8th Edition

8th EditionFlorida Building Code, Accessibility (FBC-A)

NOTE: CONTRACTOR SHAL MAKE AVALIABLE TO THE BUILDING INSPECTOR, DOCUMENTATION

NECESSARY TO VERIFY THAT ALL EXTERIOR ENVELOPE COMPONENTS REQUIRING PRODUCT

APPROVAL PER FS 533.842 ARE IN COMPLIANCE WITH PRODUCT APPROVAL INSTALLATION

REQUIREMENTS.

Florida Building Code, Energy Conservation 8th Edition

Tallahassee, FL 32399

100% Construction Documents

Admin Parking Lot Lighting for

Florida Department of Agriculture and Consumer Services

FDACS No.:1159

January 5th, 2026 ALW Project No. 25525.2

1. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS REQUIRED TO COMPLETE ALL

ELECTRICAL WORK AS SHOWN ON THE CONTRACT DRAWINGS.

2. THIS SHALL INCLUDE THE INSTALLATION OF A COMPLETE AND PROPERLY OPERATING ELECTRICAL

SYSTEM. THIS SYSTEM REQUIRED CONSISTS BASICALLY OF, AND IS NOT LIMITED TO, THE

FOLLOWING:

· EXTEND THE DISTRIBUTION SYSTEM FOR POWER INCLUDING THE NECESSARY FEEDERS,

BRANCH CIRCUITS, INSTALLATION OF AND CONNECTION TO DEVICES, PANELBOARDS, LIGHTS,

AND ALL OTHER EQUIPMENT SHOWN.

· PERFORM LIGHTING AND POLE SCOPE OF WORK, INCLUDING FIXTURES, POLES, BASES,

CIRCUITS, RACEWAY, BOXES, AND SITE WORK REQUIRED FOR INSTALL.

· PERFORM THE DEMOLITION WORK INDICATED.

3. THE BIDDER SHALL INSPECT THE PRESENT JOBSITE CONDITIONS BEFORE PREPARING HIS BID. THE SUBMISSION OF A BID WILL BE CONSIDERED EVIDENCE THAT SUCH A VISIT AND INSPECTION WAS

PERFORMED BY THE BIDDER AND THAT HE TAKES FULL RESPONSIBILITY FOR ALL FACTORS

GOVERNING HIS WORK.

4. THE ELECTRICAL WORK SHALL BE COMPLETE, FULLY OPERATIONAL, AND SUITABLE IN EVERY WAY

FOR THE SERVICE REQUIRED. DRAWINGS ARE GENERALLY DIAGRAMMATIC IN NATURE AND DO

NOT SHOW ALL DETAILS, DEVICES AND INCIDENTAL MATERIALS NECESSARY TO ACCOMPLISH

THEIR INTENT. THEREFORE, IT SHALL BE UNDERSTOOD THAT SUCH DEVICES AND INCIDENTAL

MATERIALS REQUIRED SHALL BE FURNISHED AT NO COST TO THE OWNER.

1. ALL CONDUCTORS SHALL BE INSTALLED IN METAL CONDUIT OR TUBING, UNLESS NOTED

OTHERWISE IN SPECIFICATIONS. FLEXIBLE CONDUIT INSTALLED OUT-OF-DOORS, IN ANY

MECHANICAL EQUIPMENT ROOM, OR IN NORMALLY WET AREAS, SHALL BE LIQUID TIGHT FLEX

WITH SUITABLE FITTINGS.

2. CONDUIT SHALL BE INSTALLED TIGHT TO DECK WHERE INSTALLED ABOVE CEILING. RELOCATE

INCIDENTAL HANGERS, BRACKETS, ETC. WHERE IN CONFLICT. MAXIMIZE USE OF SPACE.

3. CONDUIT SHALL PASS THROUGH WALLS AT 90 DEGREES AND SHALL BE RUN PARALLEL AND

PERPENDICULAR TO WALLS.

4. BRANCH CIRCUITS AND HOMERUNS SHALL BE #12 WIRE AND 3/4" CONDUIT MINIMUM. EVERY

CONDUIT SHALL HAVE A GREEN GROUND WIRE (#12 MINIMUM).

5. ALL CONDUCTORS SHALL BE COPPER WITH THHN/THWN INSULATION. CONDUCTORS SIZE # 8

AWG AND LARGER SHALL BE STRANDED.

6. NO MORE THAN 3 PHASE CONDUCTORS SHALL BE INSTALLED IN ONE CONDUIT UNLESS

NOTED OTHERWISE. SHARED NEUTRALS ARE NOT PERMITTED.

7. EXISTING PANELS TO REMAIN SHALL HAVE THEIR PANEL SCHEDULES UPDATED AND RETYPED

AFTER COMPLETION OF NEW WORK. NEW PANEL LOAD DESCRIPTIONS SHALL CLEARLY

DEFINE LOAD TYPE AND LOCATION. PANEL SCHEDULES SHALL INCLUDE CONTRACTOR

COMPANY NAME, PHONE NUMBER, AND DATE SCHEDULE WAS MADE AND APPLIED.

8. ALL WALL PENETRATIONS SHALL BE SEALED USING AN APPROPRIATE UL ASSEMBLY TO

MAINTAIN THE RATING OF THE WALL.

9. ALL SINGLE POLE CIRCUITS SHALL TERMINATE ON A SINGLE POLE CIRCUIT BREAKER

ASSEMBLY. DO NOT USE MULTI-POLE CIRCUIT BREAKER OVERCURRENT PROVISIONS FOR 120

VOLT OR 277 VOLT CIRCUITS. PROVIDE INDIVIDUAL GROUNDED CONDUCTORS FOR ALL

SINGLE POLE CIRCUITS.

10. WHERE CORE DRILLING OCCURS, CONTRACTOR SHALL USE CAUTION TO AVOID DAMAGING

SURROUNDING SURFACES. CONTRACTOR RESPONSIBLE FOR CLEANING UP ALL SLURRY AND

ENSURING A CLEAN AND PROFESSIONAL FINISH. CONTRACTOR SHALL REPLACE OR REPAIR

BUILDING SURFACES OR EQUIPMENT DAMAGED BY SLURRY OR CORE DRILLING MATERIALS.

11. WHERE INSTALLING ELECTRICAL CONDUIT, MAINTAIN CONDUIT STRAPPING AND FASTENING

PER NEC.

12. WHERE INSTALLING ELECTRICAL CONDUIT, MAINTAIN PULL POINTS PER NEC AND DO NOT

EXCEED 360 DEGREES IN BENDS IN ANY CONDUIT RUN WITHOUT APPROPRIATE PULL POINTS.

13. ALL JUNCTION BOXES, PULLBOXES, AND DEVICES SHALL BE LABELED WITH CIRCUIT NUMBER

AND CIRCUIT VOLTAGE.

CIRCUITING AND BRANCH CIRCUITSABBREVIATIONS

J

10's

LPA-2,4

JUNCTION BOXES AND OUTLETS

A AMPERE

AC ALTERNATING CURRENT

ER EXISTING DEVICE SHOWN IN RELOCATED POSITION

EX EXISTING - RECONNECT AS REQUIRED AT EXISTING LOCATION. REMOVE

AND REINSTALL IF REQUIRED

ETR EXISTING TO REMAIN

J JUNCTION

RELO DEVICE TO BE RELOCATED

V VOLT

VA VOLT-AMPS

W WATT

WP WEATHERPROOF (NEMA 3R)

PANELBOARD 208/240 VOLT - SURFACE MOUNTED - SEE PANELBOARD SCHEDULE

POWER DISTRIBUTION PANEL OR 480 VOLT - SEE PANELBOARD SCHEDULE

ARROW INDICATES CIRCUIT HOMERUNS IN CONDUIT

INDICATES HOMERUN TO CIRCUIT NUMBERS 2 & 4 IN PANEL "LPA"

NOTE:

NUMBER OF HOMERUNS SHOWN ON THE PLANS ARE THE NUMBER OF

HOMERUNS REQUIRED. DO NOT RUN MORE THAN THREE HOMERUNS IN

ONE CONDUIT. DO NOT RUN 2 CIRCUITS ON THE SAME PHASE IN ONE

CONDUIT.

INDICATES CONTINUATION OF RUN SHOWN ON ANOTHER PLAN VIEW

INDICATES 1 #12 PHASE CONDUCTOR, 1 #12 NEUTRAL & 1 #12 GND - 3/4" C. TO 1-POLE

BREAKER, SIZED AS SHOWN IN PANEL SCHEDULES, ON CIRCUIT No. 3, IN PANEL 'L2A'.

INDICATES ALL CONDUCTORS ARE TO BE MINIMUM #10 GAUGE, CONDUIT PER NEC

OR AS INDICATED.

NEUTRALS SHALL NOT BE SMALLER SIZE THAN PHASE CONDUCTORS UNLESS

SPECIFICALLY INDICATED OTHERWISE. PROVIDE THE APPROPRIATE NUMBER

OF NEUTRALS IN ACCORDANCE WITH NEC.

INSULATED GROUNDING CONDUCTORS SHALL BE USED IN ALL CIRCUITS, SIZED

IN ACCORDANCE WITH NEC ARTICLE 250.

2-#12, 1-#12 GROUND SHALL BE RUN IN 3/4" CONDUIT. 4 OR MORE #12

CONDUCTORS SHALL BE RUN IN 3/4" C. OR AS REQUIRED BY NEC. LARGER

THAN #12 CONDUCTORS SHALL BE RUN IN CONDUIT SIZED IN ACCORDANCE

WITH NEC.

CONCEALED OVERHEAD OR IN WALLS.

CONCEALED IN OR BELOW FLOORS OR GRADE.

JUNCTION BOX IN OR ABOVE CEILING

JUNCTION BOX IN WALL - MOUNT 1'-6" UNLESS NOTED OTHERWISE.

L2A-3

1. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT INDICATED (FIXTURES AND DEVICES) MAY VARY

FROM DRAWINGS. CONDITIONS AND DEMOLITION WORK WAS DETERMINED BY SITE OBSERVATION

AND REVIEW OF EXISTING DOCUMENTS WITHOUT THE BENEFIT OF DESTRUCTIVE INVESTIGATION.

VERIFY ACTUAL LOCATIONS, TYPES, CIRCUITING, AND QUANTITIES OF EQUIPMENT AND APPLY

DEMOLITION NOTES AS APPROPRIATE FOR THE EQUIPMENT AND ROOM OR AREA.

2. ALL ELECTRICAL ITEMS SHOWN ON DEMOLITION PLANS ARE TO BE REMOVED UNLESS NOTED

OTHERWISE. REMOVE ALL ELECTRICAL TRADE MATERIALS ASSOCIATED WITH ITEMS SHOWN TO BE REMOVED. THIS SHALL INCLUDE BUT NOT BE LIMITED TO CONDUIT AND RACEWAYS (BOTH SURFACE

MOUNTED AND CONCEALED ACCESSIBLE), WIRE, DEVICES AND CONDUIT SUPPORTS, BACK TO

SERVING PANEL. THE CONTRACTOR IS DIRECTED TO OTHER DEMOLITION INSTRUCTION (MECHANICAL, PARTITIONS, ETC.) TO REVIEW AND DETERMINE WHERE ADDITIONAL DEMOLITION WORK MAY BE

REQUIRED.

3. REMOVE ALL CONDUIT STUB-UPS IN FLOOR. CUT OR GRIND CONDUITS BELOW FLOOR LEVEL AND

GROUT OPENING. GROUT FINISH SHALL BE ABSOLUTELY FLAT AND READY FOR FLOOR FINISH.

4. ALL REMOVED ELECTRICAL EQUIPMENT, INCLUDING FIXTURES, POLES, CONDUIT, WIRE, DEVICES, AND ALL OTHER MATERIALS SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR AT NO ADDITIONAL COST. ALL FLUORESCENT BALLASTS CONTAINING PCB'S SHALL BE DISPOSED OF IN ACCORDANCE

WITH STATE AND FEDERAL GUIDELINES AT A DESIGNATED RECEIVING FACILITY.

5. BLANKING PLATES SHALL MATCH NEW PLATES INSTALLED.

6. WHERE EXISTING CIRCUITS ARE REWORKED BY THE ADDITION OR REMOVAL OF CONDUCTORS, THE

OLD WIRE SHALL BE REMOVED, THE CONDUIT SWABBED OUT, AND NEW THWN WIRES REPULLED

UNLESS INDICATED OTHERWISE.

7. WHILE REMOVING ALL ELECTRICAL ITEMS INSIDE THE INDICATED ALTERATION AREA, RECONNECT CIRCUITS TO MAINTAIN INTEGRITY OF EXISTING CIRCUITS AND CONTINUED OPERATION OF LIGHTING, EQUIPMENT AND DEVICES TO REMAIN.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING OR PATCHING OF WALLS, SIDEWALKS, PAVING, AND CONCRETE AS REQUIRED. CUTTING AND PATCHING WORK SHALL BE PERFORMED BY

SKILLED CRAFTSMEN. RETURN ALL WALLS AND THEIR FINISHES TO ORIGINAL CONDITION.

9. ABANDONED CONDUIT SHALL BE REMOVED WHERE POSSIBLE. ABANDONED CONDUIT IN SLAB OR CONCRETE WALLS WHICH CANNOT BE REMOVED SHALL HAVE WIRES PULLED FROM THEM. CUT OFF CONDUIT FLUSH WITH CONCRETE. PATCH OPENINGS AND PENETRATIONS WITH GROUT AND GRIND

OR TROWEL SMOOTH, READY FOR NEW FINISH.

10. EXISTING CONDUITS WHICH PENETRATE EXTERIOR WALLS SHALL BE REMOVED AND EXTERIOR WALL

PATCHED WITH LIKE MATERIALS.

11. ANY AND ALL HOLES OR DAMAGED SURFACES DUE TO DEMOLITION WORK SHALL BE PATCHED BY A

SKILLED CRAFTSMAN.

12. WHERE ITEMS ARE DESIGNATED EXISTING TO REMAIN, THEY SHALL BE PROTECTED DURING

DEMOLITION. RELOCATE AS REQUIRED WHERE ITEMS ARE INSTALLED IN CEILING.

13. ANY HAZARDOUS MATERIAL OR MATERIAL POSING A THREAT TO HEALTH OR THE ENVIRONMENT SHALL BE CAREFULLY DISPOSED OF IN AN APPROVED MANNER. THIS INCLUDES, BUT IS NOT LIMITED TO, FUEL OIL AND CONTAINERS, BATTERIES, BATTERY ACID, OILS, GREASE OR OTHER PETROLEUM

PRODUCTS, OR ANTIFREEZE COOLANT.

J

J

SHORTER TICKMARKS INDICATE 2 OR MORE PHASE CONDUCTORS, OR SWITCH LEGS

LONGER TICKMARKS INDICATE GROUNDED CONDUCTOR(S), QUANTITY AS SHOWN.

THE INSTALLATION SHALL COMPLY WITH THE INDICATED EDITION OF THE FOLLOWING CODES AND

ORDINANCES. WHERE SPECIFIC EDITION IS NOT INDICATED, COMPLY WITH THE LATEST

PUBLISHED EDITION.

NATIONAL FIRE PROTECTION ASSOCIATION - NFPA

NFPA 70 - 2020; NATIONAL ELECTRICAL CODE

FLORIDA BUILDING CODE

FBC-B 2023; THE FLORIDA BUILDING CODE (8th EDITION) FPC 2023; THE FLORIDA FIRE PREVENTION CODE (8th EDITION)

INCLUDING NFPA 101 - 2021; THE LIFE SAFETY CODE

FBC-A 2023; THE FLORIDA BUILDING CODE, ACCESSIBILITY (8th EDITION) FBC-EC 2023; THE FLORIDA BUILDING CODE, ENERGY CONSERVATION (8th EDITION) FBC-EB 2023; THE FLORIDA BUILDING CODE, EXISTING BUILDING (8th EDITION)

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NATIONAL ELECTRICAL SAFETY CODE

SERVING UTILITY COMPANY POLICIES

DEMOLITION NOTES - GENERAL

CODES AND REQUIREMENTS

GENERAL NOTES

DESCRIPTION OF WORK

SYMBOL LEGEND

POWER EQUIPMENT AND PANELS

POST-TOP LIGHT - EXISTING TO REMAIN

LIGHTING OUTLETS

ARM MOUNTED EXTERIOR LIGHT FIXTURE WITH POLE - SEE LIGHTING

FIXTURE SCHEDULE

DOUBLE ARM MOUNTED EXTERIOR LIGHT FIXTURE WITH POLE - SEE

LIGHTING FIXTURE SCHEDULE

NOTES:

1. VERTICAL REINFORCING BARS

SHALL BE SET IN A RADIAL FASHION

EQUIDISTANT FROM THE CENTER

AND EACH OTHER.

2. MAINTAIN 3" CLEARANCE BETWEEN

ALL REINFORCING STEEL AND

FORM SURFACE.

SECTION VIEW

PLAN VIEW

24" DIA.

#6 VERT.

3DO1

ANCHOR BOLTS BY

LIGHTING PROVIDER

1/2" CHAMFER

FINISHED GRADE

5x6 #6 x 5'-10" VERT.

5x5 3DO1 @ 4" TIES

PVC CONDUIT STUBBED UP 3"

ABOVE CONCRETE FOUNDATION.

NUMBER AND SIZE AS REQUIRED.

CONCRETE: 3000 PSI @ 28 DAYS

6'-4"

3" CLR.

1'-5"

1'-0" 1'-0"

5x2 5DO1

5x5 3DO1 @ 12" TIES

5x5 3DO1 WITH

1'-0" LAP

1'-0" 1'-6"

2'-0"

3'-0" 4'-0"

BUILDING SIDEWALK YARD DRIVEWAY AND PARKING LOT

1" MIN

DETECTABLE WARNING TAPE

AT LEAST 12" ABOVE CONDUIT

PER NEC 300.5

SECONDARY CONDUITS PER

UTILITY REQUIREMENTS

PRIMARY CONDUITS PER

UTILITY REQUIREMENTS

UNDERGROUND CONDUIT BURIAL DEPTHS NOT TO SCALE

DETAILS

STAINLESS STEEL

HEX HEAD BOLT

WITH WASHER

PULL SLOT

PROVIDE 6"-8"

OF GRAVEL

NOTES:

1. EFFECTIVELY SEAL TOPS OF

CONDUIT WITH UL LISTED

RE-ENTERABLE WATER SEAL

AFTER CABLES HAVE BEEN

PULLED.

2. SEE NOTE ON SITE PLAN FOR

BOX DIMENSIONS.

3. BASIS OF DESIGN: QUAZITE PC

STYLE TIER 15 POLYMER

CONCRETE ASSEMBLY WITH

OPEN BOTTOM.

4. BOX LID SHALL BE IDENTIFIED

AS "ELECTRICAL" AND SHALL

BE TIER 15 TRAFFIC RATED.

5. SEE DETAIL AT RIGHT FOR

GROUND ROD REQUIRED IN

EACH PULLBOX WHERE

INSTALLED ADJACENT TO

LIGHT POLE.

XXXXXXX

HANDHOLE / PULLBOX DETAIL NOT TO SCALE POLE BASE DETAIL NOT TO SCALE

LIGHTING FIXTURE SCHEDULE

FIXTURE

MARK WATTS

MOUNTING

NO. TYPE

LAMPS

LUMENS

DESCRIPTION

FIXTURE:

LED AREA LUMINAIRE, DIE CAST ALUMINUM HOUSING WITH INTEGRAL HEAT SINK, IP66 RATING, TYPE 3 MEDIUM DISTRIBUTION, ROUND POLE MOUNTING, DARK BRONZE THERMOSET POWDER COAT FINISH. 277 VOLT. SUPPLIER TO

VERIFY BOLT HOLES MATCH POLE.

(LITHONIA LIGHTING D-SERIES SIZE 1: DSX1-P2-35K-80-T3M-277-RPA-DDBXD)

POLE:

25' MOUNTING HEIGHT ROUND STRAIGHT STEEL POLE. COLD-ROLLED, COMMERCIAL QUALITY CARBON STEEL TUBING. 5" BUTT DIAMETER. NO TAPER. 4-BOLT STEEL BASE PLATE WITH BASE COVER. ANCHOR KIT. REINFORCED 3"X5" HANDHOLE WITH COVER AND STAINLESS STEEL HARDWARE. DARK BRONZE POWDER COAT FINISH. REFER TO PLANS FOR POLES WITH ONE AND TWO FIXTURES. WHERE TWO FIXTURES ARE SHOWN, THEY SHALL BE MOUNTED 180 DEGREES APART.

(HAPCO POLE PRODUCTS: RSS-25-D-5-4-BM)

9,300LP2 POLE 68- 3500K LED

FIXTURE:

LED AREA LUMINAIRE, DIE CAST ALUMINUM HOUSING WITH INTEGRAL HEAT SINK, IP66 RATING, TYPE 3 MEDIUM DISTRIBUTION, ROUND POLE MOUNTING, DARK BRONZE THERMOSET POWDER COAT FINISH. 277 VOLT. SUPPLIER TO

VERIFY BOLT HOLES MATCH POLE.

(LITHONIA LIGHTING D-SERIES SIZE 1: DSX1-P3-35K-80-T3M-277-RPA-DDBXD)

POLE:

25' MOUNTING HEIGHT ROUND STRAIGHT STEEL POLE. COLD-ROLLED, COMMERCIAL QUALITY CARBON STEEL TUBING. 5" BUTT DIAMETER. NO TAPER. 4-BOLT STEEL BASE PLATE WITH BASE COVER. ANCHOR KIT. REINFORCED 3"X5" HANDHOLE WITH COVER AND STAINLESS STEEL HARDWARE. DARK BRONZE POWDER COAT FINISH.REFER TO PLANS FOR POLES WITH ONE AND TWO FIXTURES. WHERE TWO FIXTURES ARE SHOWN, THEY SHALL BE MOUNTED 180 DEGREES APART.

(HAPCO POLE PRODUCTS: RSS-25-D-5-4-BM)

13,200LP3 POLE 102- 3500K LED

24" MAX.

QUAZITE PULLBOX AT

EACH LIGHT POLE - SEE

DETAIL

5/8"Ø X 10'L DRIVEN GROUND

ROD IN EACH PULLBOX FOR

BONDING TO LIGHT POLE

AND CIRCUIT EQUIPMENT

GROUNDING CONDUCTOR

TO NEXT LIGHT(S)

** FIXTURE AND POLE TYPES SPECIFIED SHALL BE PROVIDED TO MATCH MATERIALS FROM SEPARATE PROJECT ONSITE **

ID

R

EV

IS

IO

N

D R

A W

N :R

EV

IE

W

ED

:D A

TE

JO

N

BA

RB

ER

, P

E

BR

IA

N

W

AL

LA

CE

, P E

EA

ST

P

AR

K

AV

E, I-

0, TA

LL

AH

AS

SE

E, F

L

M

FE

-IN

C.

CO

M

0.

1.

TH

ES

E

DR

AW

IN

GS

A

ND

R

EN

DE

RI

NG

S

AR

E

IN

ST

RU

ME

NT

S

OF

S

ER

VI

CE

. T

HE

D

RA

W

IN

GS

A

ND

A

SS

OC

IA

TE

D

CO

PI

ES

T

HE

RE

OF

, I

NC

LU

DI

NG

E

LE

CT

RO

NI

C

ME

DI

A

AN

D

CA

DD

F

ILE

S, A

RE

T

HE

P

RO

PE

RT

Y

OF

A

RC

HI

TE

CT

S:

LE

W

IS

W

HI

TL

OC

K, P A.

A.

T

HE

IR

U

SE

, R

EP

RE

SE

NT

AT

IO

N

OR

R

EP

RO

DU

CT

IO

N

FO

R

AN

Y

PU

RP

OS

E

EX

CE

PT

B

Y W

RI

TT

EN

A

GR

EE

ME

NT

W

IT

H

TH

E

AR

CH

IT

EC

T

IS

P

RO

HI

BI

TE

D.

T

HI

S

CO

PY

RI

GH

T

NO

TI

FI

CA

TI

ON

S

HA

LL

B E

TR

UE

A S

IF

D

IR

EC

TL

Y

PL

AC

ED

O

N

EA

CH

D

RA

W

IN

G

EX

HI

BI

T

OR

R

EN

DE

RI

NG

O N

TH

IS

D

OC

UM

EN

T

AN

D

SH

AL

L N

OT

B

E

RE

MO

VE

D

FR

OM

T

HE

SE

D

OC

UM

EN

TS

Sheet No.:

PH

AS

E:

CO

NC

EP

T

SC

HE

M.

D

ES

IG

N

AD

VA

NC

ED

S

CH

EM

. D

ES

IG

N

C

ON

ST

RU

CT

IO

N

DO

CS

0% C

ON

ST

RU

CT

IO

N

DO

CS

DR

AW

N:

DA

TE

C on su lta nt

Description:

Jo b

Ti tle

Ad m in

P ar ki ng

L ot

L ig ht in g

FD

AC

S

N o.

: 3

Pr oj ec t #

Ph as e:

5.

0%

C on st ru ct io n D oc um en ts

C lie nt

Fl or id a

D ep ar tm en t O f A gr ic ul tu re

An d

C on su m er S er vi ce s

Ta lla ha ss ee , F lo rid a

Se al

Architects Lewis + Whitlock 206 West Virginia St.

Tallahassee, Florida 32301 850,942.1718 www.think3d.net

RE

VI

EW

ED

/25

/25

BW

BW

1/0

5/2

BW

BW

E1.0

General Notes, Legend, and Details

PART 1 - GENERAL

APPLICATION

The work described hereunder shall be installed subject to the Contractual Conditions for the entire Specifications.

These provisions apply to all sections of Division 26 of this project except as specified otherwise in each individual section.

Codes, standards, policies and requirements contained in this Section are applicable to all contract documentation.

CORRELATION

This Section of the Specifications and its accompanying Drawings are made separate for the convenience of the General Contractor / Construction Manager in preparing his bid and in no way relieves the General Contractor / Construction Manager of his responsibility to correlate the work under this Section with that of all other trades as regards the items to be furnished by various Subcontractors, the exact location of all equipment and materials and the necessity of planning the work of all trades to avoid interference.

DESCRIPTION OF WORK

Furnish all labor, materials, equipment and incidentals required to complete all electrical work as specified in this Division and as shown on the Contract Drawings. Division 26 work shall include the installation of a complete and properly operating electrical system.

Refer to other Divisions of this specification for electrical requirements of factory installed motors, controllers, power supplies, etc. Electrical connections to equipment furnished as specified in other sections of these Specifications or shown on other than the Electrical Drawings shall be governed by this Division of the Specifications.

The bidder shall inspect the present jobsite conditions before preparing his bid. The submission of a bid will be considered evidence that such a visit and inspection was performed by the bidder and that he takes full responsibility for all factors governing his work.

The electrical work shall be complete, fully operational, and suitable in every way for the service required. Drawings are generally diagrammatic in nature and do not show all details, devices and incidental materials necessary to accomplish their intent. Therefore, it shall be understood that such devices and incidental materials required shall be furnished at no cost to the Owner.

RELATED WORK

Drawings and general provisions of Contract, including General Conditions, Supplementary General Conditions, and Special Conditions sections apply to work specified in Division 26.

The Contractor shall be aware that other divisions of these Specifications may apply to related work required to perform Division 26 requirements. All related work shall be performed in accordance with those divisions.

CONFORMANCE

If the Contractor takes no exceptions to these Specifications in the Submitted Bid, the Contractor will be held totally responsible for failure to comply.

Any exception to the Specification shall reference the affected paragraph(s), subject(s), and list benefit to the Owner.

The Owner reserves the right to have the Contractor replace installed material or equipment which does not comply with these Specifications at the Contractor's expense.

SUBMITTALS

Obtain approval before procurement, fabrication, or delivery of items to the job site. Submit manufacturers' data on the equipment listed below and as directed in other Sections of Division 26. Follow the procedures required in Division 1 of this specification. Data shall be in the form of manufacturer’s descriptive data sheets and engineering drawings and will be reviewed by the Architect/Engineer before materials and equipment are delivered to the work site. Review of the submittal by the Architect/Engineer is to check for general conformance to the design intent and will not relieve the Contractor of the responsibility for the correctness of all dimensions, conformance and the proper fitting of all parts of the work.

Lighting Fixtures Light Poles Quazite Pullboxes

Submit manufacturers' names and catalog numbers for the following materials:

Conduit, Fittings, and Couplings Boxes and Fittings 600 Volt Wire and Cables Grounding Equipment

The Contractor shall thoroughly check the submittal for accuracy and compliance with the contract requirements. Shop drawings and data sheets shall bear the date checked and shall be accompanied by the Contractor’s statement that they have been checked for conformity to the Specifications and Drawings.

Submittals not so checked and noted will be returned without review.

Deliver the entire electrical submittal to the Architect/Engineer complete and in one package. An incomplete submittal will be returned to the Contractor without review.

CODES, INSPECTION AND FEES

Comply with the indicated edition of the following codes and ordinances. Where specific edition is not indicated, comply with the latest published edition.

American National Standards Institute - ANSI C2 – The National Electrical Safety Code National Fire Protection Association - NFPA NFPA 70; The National Electrical Code NFPA 101; The Life Safety Code Florida Building Code FBC-B 2023; The Florida Building Code 8th Edition FPC 2023; The Florida Fire Prevention Code 8th Edition Serving Utility Company Policies City of Tallahassee Municipal Codes and Requirements

Obtain all permits required. Contractor shall pay all fees for permits and inspections.

RECORD DOCUMENTS

Prepare record documents in accordance with Division 1 requirements. Record documents shall be complete and accurate and clearly show deviations to the Contract Drawings.

Additionally, indicate major raceway sizes and routings, locations of all control devices, all equipment and locations to scale, and fuse and circuit breaker ratings and arrangements.

Record documents shall reflect the complete contract record, including all changes, supplements and addenda as issued. All drawings, sketches and notations describing the work and as issued by the Architect/Engineer shall be incorporated.

Prepare bound sets of equipment Operation and Maintenance Instructions. These instructions shall include the name and location of the system, the name and telephone number of the Contractor, and all subcontractors installing the system or equipment, and the name and telephone number of each local manufacturer’s representative for the system or equipment.

Routine maintenance actions shall be clearly identified and include a listing of approved disposable materials necessary.

Furnish bound copies of all test results required in other sections of this division.

GUARANTEES

Equipment: one (1) year from final acceptance by the Owner.

Materials and labor: one (1) year from final acceptance by the Owner.

All equipment shall be warranted to be free from defects in workmanship, design and materials. If any part of the equipment should fail during the warranty period, it shall be replaced and the unit(s) restored to service at no expense to the Owner.

In addition to the guarantee of equipment by the manufacturer the Contractor shall also guarantee such equipment for a period of one (1) year from final acceptance by the Owner. The Contractor's one (1) year guarantee shall be for equipment, materials, and labor.

The manufacturer's warranty period shall run concurrently with the Contractor's warranty period. No exception to this provision will be allowed.

Additional guarantee requirements specific to certain parts or assemblies or installations may be in the General and Special Conditions, or other Sections of these Specifications.

PART 2 - PRODUCTS

EQUIPMENT AND MATERIALS

Furnish materials or equipment specified by manufacturers named.

Materials furnished shall be new, undamaged and packed in the original manufacturer's packing.

All equipment and apparatus shall bear the seal of approval of the Underwriter’s Laboratory where testing and listing performance criteria has been established for like items.

Protect equipment and materials from mechanical and water damage during construction. Suitable storage facilities shall be provided. Equipment shall not be stored out-of-doors except as follows:

Concrete items, plastic conduit if protected from sunlight, rigid metal conduit if protected from water and debris, padmounted equipment for outdoor installation if maintained in a normal weathertight condition, ground rods, and large spools of cables with ends properly sealed. In no case will materials be stored directly on the ground. Provide suitable timbers or billets on which items will be stored out of direct contact with the earth.

All items to be installed shall be free of rust and dirt. Damaged materials and equipment shall be replaced by the Contractor at no cost to the Owner.

All electrical panels, enclosures, raceways, conduit, and boxes shall be fabricated of metal unless indicated otherwise.

EQUIPMENT AND MATERIALS STANDARDS

Design and fabrication of electrical equipment and materials:

The American National Standards Institute (ANSI) The American Society of Mechanical Engineers (ASME) The American Society for Testing and Materials (ASTM) The Institute of Electrical and Electronic Engineers (IEEE) The National Electrical Manufacturers Association (NEMA) The Occupational Safety and Health Administration (OSHA) The Underwriters Laboratories (UL) The National Fire Protection Association (NFPA)

Comply with the latest edition and revisions of these codes and standards.

PART 3 - EXECUTION

QUALITY ASSURANCE

Installer’s Qualifications: At least three years of successful installation experience on projects with electrical work similar to that required for this project.

Manufacturer’s Qualifications: Manufacturers regularly engaged in the manufacture of electrical components and equipment of the types and sizes required, whose products have been in satisfactory use in similar service for not less than five years.

Electrical work shall be performed by experienced persons skilled in the trade.

Work shall be done neatly and in keeping with good practice and conventions of the trade. The electrical installation shall be of high quality, and of the performance level associated with top level commercial electrical installations as determined by the Architect/Engineer and the National Electrical Code.

CLEANING AND PAINTING

Clean all equipment and boxes thoroughly inside and outside at the completion of installation. Do not leave dirt and debris inside panelboard and equipment cabinets, device and junction boxes, etc.

All painting shall be done according to the Finishes Section of these specifications.

Paint all exposed conduit and wiremold installed on painted surfaces to match surrounding surface. Paint exposed threads on conduits and touch up all scratches in galvanized pipe and fittings with a high quality cold galvanizing compound.

Touchup scratched or marred surfaces of lighting fixtures, panelboards, motor control centers, switchboards, etc. with paint furnished by the equipment manufacturer specifically for the purpose.

EXCAVATION, TRENCHING AND BACKFILLING

Perform all excavation and trenching to install raceways indicated on the drawings.

No tunneling shall be allowed unless written permission is received by the Architect/Engineer.

Excavated material not suitable for backfill shall be removed from the job site.

Insure that the bottom of trenches are uniform, without large rocks or lumps of dirt which could damage the raceway or conductors.

Backfill with material that will compact readily. Compact backfill material from bottom of excavation up, to within 2” of surrounding undisturbed material.

Cover shall not be less than surrounding grade and no greater than 2" above surrounding grade.

All trenching in and around rooted areas shall be by hand.

Contractor shall take all steps necessary to protect existing root growth from damage by trenching or digging. Trenching in proximity to trees and other growth shall be directed radially away from the main trunk so as not to cut across major roots.

All trenching routing shall be coordinated with and approved by the Architect/Engineer before digging. Contractor shall contact the Architect/Engineer twenty four hours before work is scheduled to begin. Conduit routing shall be clearly laid out with paint or staking before inspection takes place. The Architect/Engineer reserves the right to specify final routing before digging begins, or at any point during the operation.

TESTS

Contractor shall test all wiring for shorts and all equipment for proper grounding before energizing. Equipment shall be thoroughly checked and adjusted for proper operation. Check motors for proper rotation before energizing and adjust if necessary.

END OF SECTION

26 00 00 ELECTRICAL GENERAL REQUIREMENTS

PART 1 - GENERAL

SCOPE OF WORK

Furnish all labor, materials and equipment and incidentals required to construct and install the complete electrical systems as indicated on the Drawings and as specified in this Section.

STANDARD OF MATERIALS

All materials, equipment and apparatus covered by this specification shall be new, of current manufacture and shall bear the seal of approval of the Underwriters' Laboratories.

All equipment and materials shall have ratings established by a recognized independent agency or laboratory. The Contractor shall apply the items used on this project within the ratings and subject to any stipulations or exceptions established by the independent agency or laboratory.

All conduits and raceways, wire, devices, panelboards, switches, etc. of a given type shall be the product of one manufacturer.

PART 2 - PRODUCTS

CONDUCTORS

Compliance: Provide wires, cables and connectors that comply with the following standards as applicable:

UL Standard 83 Thermoplastic Insulated Wires and Cables UL Standard 486A Wire Connectors and Soldering Lugs for Use with Copper Conductors UL Standard 854 Service Entrance Cable NEMA/ICEA WC-5 Thermoplastic Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy NEMA/ICEA WC-8 Ethylene Propylene Rubber Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy IEEE Standard 82 Test procedures for Impulse Voltage Tests on Insulated Conductors

Wire and cable manufactured more than twelve months before delivery to the jobsite shall not be used.

All conductors shall be soft-drawn copper of not less than ninety-eight percent (98%) conductivity, with NEC Type THW, THHN, or THWN for No. 4 and smaller, and Type RHW, THW, or THWN for No. 2 and larger, 600 volt insulation.

Jackets: Factory applied nylon or PVC external jacketed wires and cables for installation in raceways and where indicated.

Color coding of all ungrounded service, feeder, and branch circuits conductors shall be required according to the following convention:

277/480 Volt, 3 phase: brown, orange, and yellow

Ground wires shall be green and neutrals shall be white or gray or other combination per NEC. Isolated grounding conductors shall be green with yellow stripe or green with applied yellow tape to indicate isolated ground. Ground and grounded wire colors shall be used for these purposes only. Where grounded conductors of different systems are installed in the same raceway, box, auxiliary gutter, or other type of enclosure, each grounded conductor shall be individually identified by system.

Additional grounded conductors shall be white with a readily distinguishable colored stripe, other than green, running along the insulation.

Conductors No. 12 AWG through No. 10 AWG shall be solid and No. 8 AWG and larger shall be stranded. No conductors smaller than No. 12 AWG shall be used except as otherwise noted.

Acceptable manufacturers: Anaconda Wire and Cable Co., General Electric Co., Okonite Co., Southwire Co., or Rome Cable Co.

GROUNDING AND BONDING

Conductors: type THW, THHN/THWN, or RHW to match power supply wiring.

Bonding Jumper Braid: copper braided tape, constructed of 30 gage bare copper wires and properly sized for application.

Flexible Jumper Strap: flexible flat conductor, 48,250 circular mils, with copper bolt hole ends sized for 3/8” diameter bolts.

Grounding Electrodes: solid steel core with a heavy uniform covering of electrolytic copper, 5/8" X 10'. Provide sectional rods if required. Threads, on sectional rods, shall be rolled (not cut) into the composite metal after the copper covering has been applied. Sectional rod couplings shall be of a corrosion resistant alloy.

PART 3 - EXECUTION

WIRING

All conductors shall be carefully handled to avoid kinks or damage to insulation.

All wires, cables and each conductor of multi-conductor cables shall be uniquely identified at each end by color or with wire and cable markers. Lighting and receptacle wiring shall be distinctly differentiated and junction boxes marked.

Lubrications shall be used, if required, to facilitate wire pulling.

Lubricants shall be UL approved for use with the insulation specified.

Tighten electrical connectors and terminals, including screws and bolts, in accordance with manufacturer’s published torque tightening values. Where manufacturer’s torqueing requirements are not indicated, tighten connectors and terminals to comply with tightening torques specified in UL 486A.

All 600 Volt wire insulation shall be tested with a "megger" after installation. Tests shall be made at not less than 500 Volts.

GROUNDING

Ground all non-current carrying metal parts of the electrical system to provide a low impedance path for ground fault current. Route ground connections and conductors to ground and protective devices in shortest and straightest paths as possible.

Insulated grounding bushings shall be required for all raceways, service entrance panels, distribution panels, all raceways one inch and larger and any raceway entering a concentric knock-out.

In general a ground wire shall be installed in every conduit. The conduit installation itself shall serve as an additional grounding means.

Where there are parallel feeders installed in more than one raceway, each raceway shall have a ground conductor.

Where conduits terminate without mechanical connection (i.e., locknuts and bushings) to panelboards, and for all terminations of conduit sizes one inch and larger; and for all sizes of metallic conduit (rigid or flexible) terminating in concentric knockouts, the following procedure shall be followed: Each conduit shall be provided with an insulated grounding bushing and each bushing connected with a bare copper conductor to the ground bus in the electrical equipment. The ground conductor shall be in accordance with Article 250 of the NEC.

Install ground rods as necessary to provide an earth ground having a test resistance of no more than 25 ohms.

Test ground rods for ground resistance value before any wire is connected. A portable ground testing megger shall be used to test each ground rod or group of rods. The instrument shall be equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the electrode tested.

Where tests show resistance to ground is over 25 ohms, reduce resistance to 25 ohms, or less, by driving additional ground rods; then retest.

Grounding connections shall be made by exothermal weld or by using a compatible mechanical connector and brazing completely over. Exothermal welds shall be made strictly in accordance with the weld manufacturer's written recommendations. Welds that have puffed up or which show convex surfaces, indicating improper cleaning, are not acceptable. No mechanical connector is required at exothermal welds.

Grounding conductors shall be attached to equipment with a bolt-on lug or approved tapered screw used for no other purpose. Use crimp-on spade lugs for stranded conductors.

IDENTIFICATION

Equipment

All enclosures containing energized components shall be marked with mylar labels identifying hazards. Such warning messages as "WARNING-HAZARDOUS VOLTAGE", “480 VOLTS", "240 VOLTS", etc. are acceptable. Labels shall be EZ-Code by Thomas & Betts or similar product.

Junction Box Identification: Each junction box cover shall be labeled with a permanent "magic" marker or other means to identify the circuits within. For example, a junction box containing lighting circuits 21, 23, 25 from Panel L2A would be labeled "L2A-21,23,25". Telephone junction boxes shall be labeled "T". Fire alarm system junction boxes shall be labeled “FA”. Public address, nurse call, and other system junction boxes shall be labeled accordingly.

Conductor Identification: All cables and wires shall be color coded as to phase per convention. See color coding above.

FIREPROOFING

All conduit and boxes passing through or installed within fire walls and smoke walls shall be installed so as to maintain the integrity and rating of the wall through which it passes. Boxes shall be installed within 1/8" of wall surface. Conduits penetrating rated floors shall be installed to maintain the fire rating of the floor using UL approved sealing materials.

END OF SECTION

26 05 00 - BASIC ELECTRICAL MATERIALS AND METHODS

ID

R

EV

IS

IO

N

D R

A W

N :R

EV

IE

W

ED

:D A

TE

JO

N

BA

RB

ER

, P

E

BR

IA

N

W

AL

LA

CE

, P E

EA

ST

P

AR

K

AV

E, I-

0, TA

LL

AH

AS

SE

E, F

L

M

FE

-IN

C.

CO

M

0.

1.

TH

ES

E

DR

AW

IN

GS

A

ND

R

EN

DE

RI

NG

S

AR

E

IN

ST

RU

ME

NT

S

OF

S

ER

VI

CE

. T

HE

D

RA

W

IN

GS

A

ND

A

SS

OC

IA

TE

D

CO

PI

ES

T

HE

RE

OF

, I

NC

LU

DI

NG

E

LE

CT

RO

NI

C

ME

DI

A

AN

D

CA

DD

F

ILE

S, A

RE

T

HE

P

RO

PE

RT

Y

OF

A

RC

HI

TE

CT

S:

LE

W

IS

W

HI

TL

OC

K, P A.

A.

T

HE

IR

U

SE

, R

EP

RE

SE

NT

AT

IO

N

OR

R

EP

RO

DU

CT

IO

N

FO

R

AN

Y

PU

RP

OS

E

EX

CE

PT

B

Y W

RI

TT

EN

A

GR

EE

ME

NT

W

IT

H

TH

E

AR

CH

IT

EC

T

IS

P

RO

HI

BI

TE

D.

T

HI

S

CO

PY

RI

GH

T

NO

TI

FI

CA

TI

ON

S

HA

LL

B E

TR

UE

A S

IF

D

IR

EC

TL

Y

PL

AC

ED

O

N

EA

CH

D

RA

W

IN

G

EX

HI

BI

T

OR

R

EN

DE

RI

NG

O N

TH

IS

D

OC

UM

EN

T

AN

D

SH

AL

L N

OT

B

E

RE

MO

VE

D

FR

OM

T

HE

SE

D

OC

UM

EN

TS

Sheet No.:

PH

AS

E:

CO

NC

EP

T

SC

HE

M.

D

ES

IG

N

AD

VA

NC

ED

S

CH

EM

. D

ES

IG

N

C

ON

ST

RU

CT

IO

N

DO

CS

0% C

ON

ST

RU

CT

IO

N

DO

CS

DR

AW

N:

DA

TE

C on su lta nt

Description:

Jo b

Ti tle

Ad m in

P ar ki ng

L ot

L ig ht in g

FD

AC

S

N o.

: 3

Pr oj ec t #

Ph as e:

5.

0%

C on st ru ct io n D oc um en ts

C lie nt

Fl or id a

D ep ar tm en t O f A gr ic ul tu re

An d

C on su m er S er vi ce s

Ta lla ha ss ee , F lo rid a

Se al

Architects Lewis + Whitlock 206 West Virginia St.

Tallahassee, Florida 32301 850,942.1718 www.think3d.net

RE

VI

EW

ED

/25

/25

BW

BW

1/0

5/2

BW

BW

E1.1

Specifications

PART 1 - GENERAL

RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

SUMMARY

This Section includes all labor, material, equipment and services necessary and incidental to complete all the demolition and removal of electrical work as shown on the Drawings or as required.

The demolition drawings do not necessarily indicate all the conditions, details, or work required. The Contractor shall examine the building to determine the actual conditions and extent of the work. Any details not clear to this Contractor shall be referred to the Engineer for clarification prior to bidding.

The Contractor shall be responsible for demolition and removal of all existing electrical systems where shown for demolition. No portion of electrical systems shown for demolition may be abandoned in place.

SUBMITTALS

Shop Drawings: Indicate demolition and removal sequence and location of salvageable items.

Schedules: Submit schedule showing time and detailed sequence of demolition, removal of materials and arranged coordination of anticipated electrical interruptions.

1. Schedule demolition and removal work to ensure uninterrupted progress of Owner's on-site operations.

Project Record Documents: Submit in accordance with Section 260000.

1. Accurately record actual locations of abandoned or dead ended utilities.

QUALITY ASSURANCE

Contractor shall verify the extent of the demolition work. Any questions as to which systems are to be removed versus which systems are to remain shall be referred to the Engineer for clarification prior to commencing demolition work.

The demolition work shall be a phased operation and shall comply with the construction sequence schedule.

Do not close or obstruct egress width of fire exits or access.

Do not disable or disrupt building fire or life safety systems without written permission from the Owner. In all cases, permission shall have been granted not less than ten (10) working days prior to the intended interruption.

PROJECT CONDITIONS

Owner will vacate demolition area prior to start of demolition work.

Owner will continuously occupy areas of building immediately adjacent to selective demolition areas.

Conduct selective demolition work in manner that will minimize need for disruption of Owner's normal operations.

Provide minimum of ten (10) working days advanced notice to Owner of demolition activities which will severely impact Owner's normal operations.

Maintain free and safe passage to and from Owner occupied areas.

Condition of Structures: Owner assumes no responsibility for actual condition of areas to be demolished.

Traffic and Passageways: Maintain accessibility for fire fighting apparatus.

1. Conduct demolition operations and debris removal to avoid interference with adjacent occupied facilities.

2. Obtain written permission from authorities having jurisdiction prior to closing or obstructing adjacent occupied facilities.

3. Provide alternate routes when closing or obstructing traffic ways when required by governing authorities.

4. Ensure safe passage of persons around area of demolition. Provide and maintain temporary covered passageways; comply with requirements of governing authorities.

Protection: Perform work in manner to eliminate hazards to persons or property and avoid interference with adjacent areas.

1. Maintain existing utilities that are to remain in service and protect from damage during demolition operations.

2. Do not interrupt existing utilities serving occupied facilities, except when authorized by Owner in writing. Provide temporary services during interruptions.

3. Coordinate in advance with Owner electrical interruptions.

4. Protect existing floors with suitable coverings when necessary.

COORDINATION

The Contractor shall be responsible for coordinating demolition of all affected electrical systems to prevent disruption to the Owner and minimize downtime.

The Contractor shall be responsible for coordinating demolition by other Divisions of the Specifications to prevent disruption to the Owner and minimize downtime.

PART 2 - PRODUCTS

Not used.

PART 3 - EXECUTION

EXAMINATION

Beginning alterations to existing building systems means the installer accepts existing conditions.

PREPARATION

Provide, erect, and maintain temporary barriers, warning notifications…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .