EXHIBIT A - CONSTRUCTION DOCUMENTS.pdf
PDF 2 MB Posted
- Solicitation number
- ITB-15341
- Issued by
- Leon County, Florida
About this file
EXHIBIT A - CONSTRUCTION DOCUMENTS SUMMARY
These are 100% Construction Documents for the Admin Parking Lot Lighting project at the Florida Department of Agriculture and Consumer Services (FDACS) Conner Laboratory Complex Administration Building located at 3125 Conner Blvd., Tallahassee, Florida 32399 (FDACS Project No. 1159). The project involves electrical work for parking lot and site lighting improvements, including the installation of a complete electrical system consisting of new LED lighting fixtures, 25-foot steel poles, underground conduit systems, pull boxes, and associated branch circuits and raceways. The work encompasses demolition of existing lighting infrastructure, installation of new LP2 and LP3 series LED area luminaires mounted on poles, and the creation of underground electrical distribution networks using directional boring and trenching methods. The specifications require compliance with the 2020 National Electrical Code, 2023 Florida Building Code (8th Edition), and applicable NFPA standards. All circuit wiring shall utilize #10 conductors in 3/4-inch conduit, with total lighting load calculated at 2,232 watts (8 amperes at 277 volts) after new lights are installed, controlled through an existing mechanical timeclock to remain in service.
The construction documents establish comprehensive electrical installation standards requiring all materials to be new, UL-listed, and of current manufacture. The contractor must furnish all labor, materials, equipment, and incidentals necessary for complete system installation and provide a one-year guarantee on equipment, materials, and labor from final acceptance. Conduit installation must follow rigid specifications with metal conduit for interior and above-grade exterior work and PVC conduit for embedded or below-grade applications. The documents contain detailed specifications for lighting fixture schedules (including Lithonia Lighting D-Series fixtures and HAPCO pole products), grounding requirements with 5/8-inch by 10-foot ground rods installed in each pullbox with maximum 25-ohm resistance, and comprehensive demolition procedures for removing existing post-top lights and associated wiring while maintaining reusable conduit sections. The contractor must comply with all applicable codes, obtain all required permits and inspections, maintain documentation for exterior envelope product approvals per Florida Statutes 533.842, and submit detailed submittals including manufacturers' data sheets, lighting fixture specifications, pole details, and pullbox requirements before procurement or installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXHIBIT A - CONSTRUCTION DOCUMENTS.pdf | ||
| Addenda I - Timeline Revision.pdf | ||
| ITB DOA 25 26 74_Final.pdf | ||
| Addenda I - Timeline Revision.pdf | ||
| ITB DOA 25 26 74_Final.pdf | ||
| EXHIBIT B.pdf | ||
| EXHIBIT B.pdf | ||
| Addenda II - QA Responses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
G1.0
PH
AS
E:
CO
NC
EP
T
SC
HE
M.
D
ES
IG
N
AD
VA
NC
ED
S
CH
EM
. D
ES
IG
N
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
DR
AW
N:
DA
TE
C on su lta nt
Description:
Index of Drawings, Standard Abbreviations and General Notes
Jo b
Ti tle
Ad m in
P ar ki ng
L ot
L ig ht in g
FD
AC
S
N o.
: 1
Pr oj ec t #
Ph as e:
5.
0%
C on st ru ct io n D oc um en ts
C lie nt
Fl or id a
D ep ar tm en t O f A gr ic ul tu re
An d C on su m er
S er vi ce s Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
F D
A C
S
- C on t'i ng C on tr ac t '
-'3
1\
5.
B
IM
A dm in P ar ki ng L ot L ig ht in g\
M od el \2
.2
B
IM
A dm in P ar ki ng L ot L ig ht in g.
pl n
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
/25
/25 R.
LE
W
IS
B.
B.
/05 /26
R.
LE
W
IS
B.
B.
SHEET INDEX
Architecture
Electrical
ID
G1.0
E1.0
E1.2
E1.1
E2.0
E3.0
Name
Index of Drawings, Standard Abbreviations and General Notes
General Notes, Legend, and Details
Specifications
Specifications
Demolition Plan
New Work Plan
Current Issue
100% Construction Documents
100% Construction Documents
100% Construction Documents
100% Construction Documents
100% Construction Documents
100% Construction Documents
N
N
N
PROJECT AREA
PROJECT LOCATION
NUMBER INDICATES
SECTION, ELEVATION OR DETAIL
SHEET NUMBER WHERE
ELEVATION, SECTION
OR DETAIL IS DRAWN
A
Architectural General Notes: Index of Drawings:Legend of Architectural Symbols: Standard Abbreviations:
2) ALL DIMENSIONS ARE TO THE FACE OF STUD OR STUD TRACK, CENTER LINE OF STUD OR STUD TRACK, FACE OF MASONRY
AND TO THE CENTER LINE OF STRUCTURAL STEEL COLUMNS, UNLESS OTHERWISE INDICATED.
3) WHERE STRUCTURAL DESIGN LOADS ARE NOT PROVIDED FOR ANY COMPONENTS REQUIRING MANUFACTURER
OR FABRICATOR ENGINEERING, AND MINIMUM LOADING CONDITIONS ARE NOT PROVIDED IN APPLICABLE CODES
AND STANDARDS, CONSULT ARCHITECT PRIOR TO PROCEEDING.
13) THE CONTRACTOR SHALL ERECT AND MAINTAIN ALL REASONABLE SAFEGUARDS FOR SAFETY AND HEALTH, INCLUDING
POSTING DANGER SIGNS AND OTHER WARNING AGAINST HAZARDS, AS WELL AS PROMULGATING SAFETY STANDARDS.
4) DIMENSIONS FOR PATHS OF EGREES INCLUDING CORRIDORS AND STAIRS SHALL MEAN CLEAR WIDTH BETWEEN CORRIDOR
WALLS, AND AT STAIRS CLEAR WIDTH BETWEEN WALLS OR CURBS.
6) IF AN ORDER OF PRECEDENT FOR THE INTERPRETATION OF DOCUMENTS IS NOT PROVIDED IN THE PROJECT MANUAL (IF
PROVIDED), AND A CONFLICT OCCURS IN THE SPECIFICATIONS, ON THE DRAWINGS, OR BETWEEN THE DRAWINGS AND
SPECIFICATIONS, CONTACT THE ARCHITECT. ALL REQUEST FOR CLARIFICATION TO THE ARCHITECT SHALL BE MADE IN WRITING.
THE ARCHITECT'S RESPONSE SHALL BE MADE IN WRITING AND NO FORMAL INSTRUCTIONS SHALL BE GIVEN VERBALLY.
8) ALL FIRE RATED PARTITION OR WALL ASSEMBLIES SHALL EXTEND FROM THE FLOOR SLAB TO THE UNDERSIDE OF THE
BUILDING STRUCTURE AND/OR DECK ABOVE. ALL PENETRATIONS IN RATED CONSTRUCTION SHALL BE PROPERLY SEALED TO
INSURE THE RATING IS MAINTAINED.
15) THE CONTRACTOR SHALL MAINTAIN A CLEAN WORK PREMISE AT ALL TIMES AND SHALL CLEAN CONSTRUCTION SITE OF
ALL DEBRIS DAILY. THE WORK PREMISE SHALL BE CLEAN AT COMPLETION OF JOB AND BEFORE FINAL PAYMENT IS MADE.
9) ALL FIRE RATED FLOOR/CEILING OR ROOF/CEILING ASSEMBLIES SHALL BE CONTINUOUS BETWEEN PARTITIONS AND/OR WALLS
FOR THE SPACE OR HORIZONTAL AREA INDICATED. ALL PENETRATIONS IN RATED CONSTRUCTION SHALL BE PROPERLY SEALED
TO INSURE THE RATING IS MAINTAINED.
16) THE CONTRACTOR SHALL TAKE CARE NOT DAMAGE EXISTING SURFACES AND SHALL BE RESPONSIBLE FOR RESTORING
AREAS DAMAGED BY THE CONTRACTOR (MATERIALS, FINISHES, ETC.) TO THEIR ORIGINAL CONDITIONS. SURFACES SHALL BE
REPAINTED TO MATCH EXISTING ADJACENT FINISHES.
10) TYPICAL AND STANDARD DETAILS MAY BE PROVIDED IN THE DRAWINGS. IF A SPECIFIC DETAIL IS NOT PROVIDED
FOR CONDITION OF FABRICATION AND/OR INSTALLATION, CONTACT THE ARCHITECT PRIOR TO PROCEEDING.
11) THE INSTALLATION OF MECHANICAL, PLUMBING AND ELECTRICAL ITEMS (INCLUDING UTILITIES, ROUGH-INS, SYSTEM
COMPONENTS AND FINISHED FIXTURES) IN EXPOSED TO VIEW AREAS OR SPACES SHALL BE UNDERTAKEN WITH SKILL AND
CRAFTMANSHIP TO PROVIDE A FINISHED CONDITION ACCEPTABLE TO THE ARCHITECT. ALL EXPOSED TO VIEW ITEMS SHALL
BE FINISHED WITH PAINT UNLESS OTHERWISE SPECIFIED TO BE PREFINISHED OR NOT TO BE PAINTED.
12) THESE GENERAL NOTES HAVE THE SAME AUTHORITY AS OTHER NOTES AND REFERENCES IN THE DRAWINGS OR
SPECIFICATIONS AND SHALL NOT BE EXCLUDED IN THE EXECUTION OF THE WORK. THEY MAY REQUIRE COORDINATION
BETWEEN VARIOUS TRADE CONTRACTORS. IN ADDITION TO THESE GENERAL NOTES, REFER TO DEMOLITION AND
CONSTRUCTION NOTES SPECIFIC TO EACH DRAWING.
1) THESE DRAWINGS AND RENDERINGS ARE INSTRUMENTS OF SERVICE. THE DRAWINGS AND COPIES THEREOF, INCLUDING ELECTRONIC MEDIA AND CAD FILES, ARE THE PROPERTY OF ARCHITECTS: LEWIS + WHITLOCK, P.A. THEIR
USE, REPRESENTATION OR REPRODUCTION IN ACTUAL FORM OR CONTENT BY ANY ENTITY THAT POSSESSES THEM FOR
ANY PURPOSE EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT IS PROHIBITED. THE COPYRIGHT NOTIFICATION
SHALL BE TRUE AS IF DIRECTLY PLACED ON EACH DRAWING, DETAIL, EXHIBIT OR RENDERING ON THIS DOCUMENT AND
SHALL NOT BE REMOVED FROM THESE DOCUMENTS.
14) THE CONTRACTOR SHALL BE RESTRICTED TO AREAS SPECIFIED BY THE OWNER FOR ON-SITE STORAGE OF MATERIALS
5) DO NOT SCALE DRAWINGS, IF THERE IS A CONFLICT IN DIMENSIONS OR IF THERE IS INSUFFICIENT DIMENSIONING, CONTACT THE
ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING.
7) WHERE CLEAR DIMENSIONS ARE INDICATED, THIS SHALL MEAN CLEAR WIDTH FROM FINISHED WALL TO FINISHED
WALL OR CLEAR FLOOR AREA BETWEEN BUILDING COMPONENTS.
Area Map
-AIR CONDITIONING
-AMERICAN CONCRETE INSTITUTE
-ACOUSTICAL CEILING TILE
-ADJACENT
-ABOVE FINISH FLOOR
-ALTERNATE
-ALUMINUM
-AMERICAN SOCIETY OF TSTG. & MTLS.
-BOARD
-BUILDING
-BOLT
-BEAM
-BOTTOM
-BEARING
-CENTER TO CENTER
-CEMENT
-CUBIC FEET
-CUBIC FEET PER MINUTE
-CORNER GUARD
-CIRCLE, CIRCULAR
-CAST-IN-PLACE
-CONTROL JOINT
-CEILING
-CLOSET
-CLEARANCE, CLEAR
-CONCRETE MASONRY UNIT
-COLUMN
-COMPRESSOR, COMPOSITE
-CONCRETE
-CONSTRUCTION
-CONTINUOUS
-CORRUGATED
-COUNTERSINK
-CENTER
-DOUBLE
-DIRECT APPLIED EXT FINISH SYSTEM
-DEGREES
-DETAIL
-DRINKING FOUNTAIN
-DIAMETER
-DIMENSION
-DOWN
-DOWNSPOUT
-DETAIL
-DRAWING
-EACH
-EXPANSION JOINT
-ELECTRICAL
-ELEVATOR, ELEVATION
-ENCLOSURE
-EQUAL
-EQUIPMENT
-ELECTRICAL WATERCOOLER
-EXHAUST
-EXISTING
-EXTERIOR
A/C
ACI
ACT
ADJ
AFF
ALT
ALUM
ASTM
BD
BLDG
BLT
BM
BOT
BRG
C/C
CEM
CF
CFM
CG
CIR
CIP
CJ
CLG
CLO
CLR
CMU
COL
COMP
CONC
CONSTR
CONT
CORR
CS
CTR
DBL
DEFS
DEG
DTL
DF
DIA
DIM
DN
DS
DTL
DWG
EA
EJ
ELEC
ELEV
ENCL
EQ
EQUIP
EWC
EXH
EX
EXT
FD
FEB
FEC
FF
FHC
FIN
FL
FLG
FT
FTG
GA
GALV
GEN
GND
GWB
GYP
HC
HDR
HDRL
HM
HORZ
HGT
ID
IN
INSUL
INT
JAN
JB
JT
K
KD
L
LAM
LAV
LBS
LH
LL
LLH
LLV
LTL
LTWT
LVR
-FLOOR DRAIN
-FIRE EXTINGUISHER W/ BRACKET
-FIRE EXTINGUISHER IN CABINET
-FINISH FLOOR
-FIRE HOSE CABINET
-FINISH
-FLOOR
-FLASHING
-FOOT OR FEET
-FOOTING
-GAUGE
-GALVANIZED
-GENERAL
-GROUND
-GYPSUM WALLBOARD
-GYPSUM
-HANDICAPPED ACCESSIBLE
-HEADER
-HANDRAIL
-HOLLOW METAL
-HORIZONTAL
-HEIGHT
-INSIDE DIAMETER (DIM.)
-INCHES
-INSULATION
-INTERIOR
-JANITOR
-JAMB
-JOINT
-KIPS (KILO POUND OR 1000LBS.)
-KILN DRIED
-STEEL ANGLE, LENGTH
-LAMINATED
-LAVATORY
-POUNDS
-LEFT HAND
-LIVE LOAD
-LONG LEG HORIZONTAL
-LONG LEG VERTICAL
-LINTEL
-LIGHTWEIGHT
-LOUVER
M
MATL
MAX
MC
MECH
MTL
MEZZ
MFR
MIN
MISC
MK
MO
MTD
MULL
N
NA
NIC
NOM
NS
NTS
OA
OC
OD
OH
OPP
OPPH
PCF
PKG
PL
PLAM
PLYWD
PNL
PR
PREFAB
PREP
PSF
PSI
PT
PVC
PVMT
QC
QT
REF
REINF
REQD
REV
RH
RM
RO
-METER
-MATERIAL
-MAXIMUM
-MEDICINE CABINET
-MECHANICAL
-METAL
-MEZZANINE
-MANUFACTURER
-MINIMUM
-MISCELLANEOUS
-MARK
-MASONRY OPENING
-MOUNTED
-MULLION
-NORTH
-NOT APPLICABLE
-NOT IN CONTRACT
-NOMINAL
-NON SHRINK
-NOT TO SCALE
-OVERALL
-ON CENTER
-OUTSIDE DIAMETER
-OVERHEAD
-OPPOSITE
-OPPOSITE HAND
-POUNDS PER CUBIC FOOT
-PARKING
-PLATE
-PLASTIC LAMINATE
-PLYWOOD
-PANEL
-PAIR
-PREFABRICATED
-PREPARATION
-POUNDS PER SQUARE FOOT
-POUNDS PER SQUARE INCH
-PRESSURE TREATED, PAINT, POINT
-POLYVINYL CHLORIDE
-PAVEMENT
-QUALITY CONTROL
-QUARRY TILE
-REFERENCE
-REINFORCED, REINFORCEMENT
-REQUIRED
-REVISION
-RIGHT HAND
-ROOM
-ROUGH OPENING
SAN
SC
SECT
SEW
SF
SGL
SIM
SJ
SPKLR
SQ
SST
STD
STL
STOR
STRUCT
SUSP
TBD
TEL
TEMP
T&G
THK
TOB
TOC
TOF
TOS
TS
TV
TYP
UNF
UON
UR
VCT
VB
VERT
VEST
VFY
VOL
VT
W/ W/C
WD
W/O
WP
WWF
-SANITARY
-SOLID CORE
-SECTION
-SEWER
-SQUARE FEET
-SINGLE
-SIMILAR
-SAWED JOINT
-SPRINKLER
-SQUARE
-STAINLESS STEEL
-STANDARD
-STEEL
-STORAGE
-STRUCTURAL
-SUSPENDED
-TO BE DETERMINED
-TELEPHONE
-TEMPORARY, TEMPERATURE
-TONGUE & GROOVE
-THICK
-TOP OF BEAM
-TOP OF CONCRETE
-TOP OF FOOTING
-TOP OF STEEL
-STRUCTURAL TUBE STEEL
-TELEVISION
-TYPICAL
-UNFINISHED
-UNLESS OTHERWISE NOTED
-URINAL
-VINYL COMPOSITION TILE
-VAPOR BARRIER
-VERTICAL
-VESTIBULE
-VERIFY
-VOLUME
-VINYL TILE
-WITH
-WATER CLOSET
-WOOD
-WITHOUT
-WATERPROOF, WORKING POINT
-WELDED WIRE FABRIC
Location Map
Applicable Codes:
3125 Conner Blvd
A1.1
A1.1
TO BREAK OFF PARTS OF DRAWING
FINISH COLOR
DEMOLITION NOTES
ALPHABETICAL
CONSTRUCTION NOTES
NUMERICAL
REVISION
DOUBLE DASHED LINE
PROPERTY LINES, BOUNDRY LINES
DASHED LINES
HIDDEN, FUTURE, OR EXIST. CONST. TO BE REMOVED
BREAK LINE
SINGLE DASH LINE
PROJECT NORTH
BUILDING SECTION REFERENCE
WALL SECTION REFERENCE
DETAIL REFERENCE
INTERIOR ELEVATION
ELEVATION REFERENCE
C1
COLUMN LINES
ELEVATION
REFERENCE POINT
DASH AND DOT
FIRE RATED WALLS
A1.1
A1.1
A1.1
A1.1
A1.1D###
DOOR NUMBER
Florida Building Code, Building (FBC-B)
Florida Building Code, Plumbing
Florida Fire Prevention Code (FFPC) National Electrical Code (NEC)
Florida Building Code, Mechanical Florida Building Code, Fuel Gas
8th Edition
8th Edition
Florida Building Code, Existing Building (FBC-EB) 8th Edition
2020 Edition
8th Edition 8th Edition 8th Edition
8th EditionFlorida Building Code, Accessibility (FBC-A)
NOTE: CONTRACTOR SHAL MAKE AVALIABLE TO THE BUILDING INSPECTOR, DOCUMENTATION
NECESSARY TO VERIFY THAT ALL EXTERIOR ENVELOPE COMPONENTS REQUIRING PRODUCT
APPROVAL PER FS 533.842 ARE IN COMPLIANCE WITH PRODUCT APPROVAL INSTALLATION
REQUIREMENTS.
Florida Building Code, Energy Conservation 8th Edition
Tallahassee, FL 32399
100% Construction Documents
Admin Parking Lot Lighting for
Florida Department of Agriculture and Consumer Services
FDACS No.:1159
January 5th, 2026 ALW Project No. 25525.2
1. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS REQUIRED TO COMPLETE ALL
ELECTRICAL WORK AS SHOWN ON THE CONTRACT DRAWINGS.
2. THIS SHALL INCLUDE THE INSTALLATION OF A COMPLETE AND PROPERLY OPERATING ELECTRICAL
SYSTEM. THIS SYSTEM REQUIRED CONSISTS BASICALLY OF, AND IS NOT LIMITED TO, THE
FOLLOWING:
· EXTEND THE DISTRIBUTION SYSTEM FOR POWER INCLUDING THE NECESSARY FEEDERS,
BRANCH CIRCUITS, INSTALLATION OF AND CONNECTION TO DEVICES, PANELBOARDS, LIGHTS,
AND ALL OTHER EQUIPMENT SHOWN.
· PERFORM LIGHTING AND POLE SCOPE OF WORK, INCLUDING FIXTURES, POLES, BASES,
CIRCUITS, RACEWAY, BOXES, AND SITE WORK REQUIRED FOR INSTALL.
· PERFORM THE DEMOLITION WORK INDICATED.
3. THE BIDDER SHALL INSPECT THE PRESENT JOBSITE CONDITIONS BEFORE PREPARING HIS BID. THE SUBMISSION OF A BID WILL BE CONSIDERED EVIDENCE THAT SUCH A VISIT AND INSPECTION WAS
PERFORMED BY THE BIDDER AND THAT HE TAKES FULL RESPONSIBILITY FOR ALL FACTORS
GOVERNING HIS WORK.
4. THE ELECTRICAL WORK SHALL BE COMPLETE, FULLY OPERATIONAL, AND SUITABLE IN EVERY WAY
FOR THE SERVICE REQUIRED. DRAWINGS ARE GENERALLY DIAGRAMMATIC IN NATURE AND DO
NOT SHOW ALL DETAILS, DEVICES AND INCIDENTAL MATERIALS NECESSARY TO ACCOMPLISH
THEIR INTENT. THEREFORE, IT SHALL BE UNDERSTOOD THAT SUCH DEVICES AND INCIDENTAL
MATERIALS REQUIRED SHALL BE FURNISHED AT NO COST TO THE OWNER.
1. ALL CONDUCTORS SHALL BE INSTALLED IN METAL CONDUIT OR TUBING, UNLESS NOTED
OTHERWISE IN SPECIFICATIONS. FLEXIBLE CONDUIT INSTALLED OUT-OF-DOORS, IN ANY
MECHANICAL EQUIPMENT ROOM, OR IN NORMALLY WET AREAS, SHALL BE LIQUID TIGHT FLEX
WITH SUITABLE FITTINGS.
2. CONDUIT SHALL BE INSTALLED TIGHT TO DECK WHERE INSTALLED ABOVE CEILING. RELOCATE
INCIDENTAL HANGERS, BRACKETS, ETC. WHERE IN CONFLICT. MAXIMIZE USE OF SPACE.
3. CONDUIT SHALL PASS THROUGH WALLS AT 90 DEGREES AND SHALL BE RUN PARALLEL AND
PERPENDICULAR TO WALLS.
4. BRANCH CIRCUITS AND HOMERUNS SHALL BE #12 WIRE AND 3/4" CONDUIT MINIMUM. EVERY
CONDUIT SHALL HAVE A GREEN GROUND WIRE (#12 MINIMUM).
5. ALL CONDUCTORS SHALL BE COPPER WITH THHN/THWN INSULATION. CONDUCTORS SIZE # 8
AWG AND LARGER SHALL BE STRANDED.
6. NO MORE THAN 3 PHASE CONDUCTORS SHALL BE INSTALLED IN ONE CONDUIT UNLESS
NOTED OTHERWISE. SHARED NEUTRALS ARE NOT PERMITTED.
7. EXISTING PANELS TO REMAIN SHALL HAVE THEIR PANEL SCHEDULES UPDATED AND RETYPED
AFTER COMPLETION OF NEW WORK. NEW PANEL LOAD DESCRIPTIONS SHALL CLEARLY
DEFINE LOAD TYPE AND LOCATION. PANEL SCHEDULES SHALL INCLUDE CONTRACTOR
COMPANY NAME, PHONE NUMBER, AND DATE SCHEDULE WAS MADE AND APPLIED.
8. ALL WALL PENETRATIONS SHALL BE SEALED USING AN APPROPRIATE UL ASSEMBLY TO
MAINTAIN THE RATING OF THE WALL.
9. ALL SINGLE POLE CIRCUITS SHALL TERMINATE ON A SINGLE POLE CIRCUIT BREAKER
ASSEMBLY. DO NOT USE MULTI-POLE CIRCUIT BREAKER OVERCURRENT PROVISIONS FOR 120
VOLT OR 277 VOLT CIRCUITS. PROVIDE INDIVIDUAL GROUNDED CONDUCTORS FOR ALL
SINGLE POLE CIRCUITS.
10. WHERE CORE DRILLING OCCURS, CONTRACTOR SHALL USE CAUTION TO AVOID DAMAGING
SURROUNDING SURFACES. CONTRACTOR RESPONSIBLE FOR CLEANING UP ALL SLURRY AND
ENSURING A CLEAN AND PROFESSIONAL FINISH. CONTRACTOR SHALL REPLACE OR REPAIR
BUILDING SURFACES OR EQUIPMENT DAMAGED BY SLURRY OR CORE DRILLING MATERIALS.
11. WHERE INSTALLING ELECTRICAL CONDUIT, MAINTAIN CONDUIT STRAPPING AND FASTENING
PER NEC.
12. WHERE INSTALLING ELECTRICAL CONDUIT, MAINTAIN PULL POINTS PER NEC AND DO NOT
EXCEED 360 DEGREES IN BENDS IN ANY CONDUIT RUN WITHOUT APPROPRIATE PULL POINTS.
13. ALL JUNCTION BOXES, PULLBOXES, AND DEVICES SHALL BE LABELED WITH CIRCUIT NUMBER
AND CIRCUIT VOLTAGE.
CIRCUITING AND BRANCH CIRCUITSABBREVIATIONS
J
10's
LPA-2,4
JUNCTION BOXES AND OUTLETS
A AMPERE
AC ALTERNATING CURRENT
ER EXISTING DEVICE SHOWN IN RELOCATED POSITION
EX EXISTING - RECONNECT AS REQUIRED AT EXISTING LOCATION. REMOVE
AND REINSTALL IF REQUIRED
ETR EXISTING TO REMAIN
J JUNCTION
RELO DEVICE TO BE RELOCATED
V VOLT
VA VOLT-AMPS
W WATT
WP WEATHERPROOF (NEMA 3R)
PANELBOARD 208/240 VOLT - SURFACE MOUNTED - SEE PANELBOARD SCHEDULE
POWER DISTRIBUTION PANEL OR 480 VOLT - SEE PANELBOARD SCHEDULE
ARROW INDICATES CIRCUIT HOMERUNS IN CONDUIT
INDICATES HOMERUN TO CIRCUIT NUMBERS 2 & 4 IN PANEL "LPA"
NOTE:
NUMBER OF HOMERUNS SHOWN ON THE PLANS ARE THE NUMBER OF
HOMERUNS REQUIRED. DO NOT RUN MORE THAN THREE HOMERUNS IN
ONE CONDUIT. DO NOT RUN 2 CIRCUITS ON THE SAME PHASE IN ONE
CONDUIT.
INDICATES CONTINUATION OF RUN SHOWN ON ANOTHER PLAN VIEW
INDICATES 1 #12 PHASE CONDUCTOR, 1 #12 NEUTRAL & 1 #12 GND - 3/4" C. TO 1-POLE
BREAKER, SIZED AS SHOWN IN PANEL SCHEDULES, ON CIRCUIT No. 3, IN PANEL 'L2A'.
INDICATES ALL CONDUCTORS ARE TO BE MINIMUM #10 GAUGE, CONDUIT PER NEC
OR AS INDICATED.
NEUTRALS SHALL NOT BE SMALLER SIZE THAN PHASE CONDUCTORS UNLESS
SPECIFICALLY INDICATED OTHERWISE. PROVIDE THE APPROPRIATE NUMBER
OF NEUTRALS IN ACCORDANCE WITH NEC.
INSULATED GROUNDING CONDUCTORS SHALL BE USED IN ALL CIRCUITS, SIZED
IN ACCORDANCE WITH NEC ARTICLE 250.
2-#12, 1-#12 GROUND SHALL BE RUN IN 3/4" CONDUIT. 4 OR MORE #12
CONDUCTORS SHALL BE RUN IN 3/4" C. OR AS REQUIRED BY NEC. LARGER
THAN #12 CONDUCTORS SHALL BE RUN IN CONDUIT SIZED IN ACCORDANCE
WITH NEC.
CONCEALED OVERHEAD OR IN WALLS.
CONCEALED IN OR BELOW FLOORS OR GRADE.
JUNCTION BOX IN OR ABOVE CEILING
JUNCTION BOX IN WALL - MOUNT 1'-6" UNLESS NOTED OTHERWISE.
L2A-3
1. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT INDICATED (FIXTURES AND DEVICES) MAY VARY
FROM DRAWINGS. CONDITIONS AND DEMOLITION WORK WAS DETERMINED BY SITE OBSERVATION
AND REVIEW OF EXISTING DOCUMENTS WITHOUT THE BENEFIT OF DESTRUCTIVE INVESTIGATION.
VERIFY ACTUAL LOCATIONS, TYPES, CIRCUITING, AND QUANTITIES OF EQUIPMENT AND APPLY
DEMOLITION NOTES AS APPROPRIATE FOR THE EQUIPMENT AND ROOM OR AREA.
2. ALL ELECTRICAL ITEMS SHOWN ON DEMOLITION PLANS ARE TO BE REMOVED UNLESS NOTED
OTHERWISE. REMOVE ALL ELECTRICAL TRADE MATERIALS ASSOCIATED WITH ITEMS SHOWN TO BE REMOVED. THIS SHALL INCLUDE BUT NOT BE LIMITED TO CONDUIT AND RACEWAYS (BOTH SURFACE
MOUNTED AND CONCEALED ACCESSIBLE), WIRE, DEVICES AND CONDUIT SUPPORTS, BACK TO
SERVING PANEL. THE CONTRACTOR IS DIRECTED TO OTHER DEMOLITION INSTRUCTION (MECHANICAL, PARTITIONS, ETC.) TO REVIEW AND DETERMINE WHERE ADDITIONAL DEMOLITION WORK MAY BE
REQUIRED.
3. REMOVE ALL CONDUIT STUB-UPS IN FLOOR. CUT OR GRIND CONDUITS BELOW FLOOR LEVEL AND
GROUT OPENING. GROUT FINISH SHALL BE ABSOLUTELY FLAT AND READY FOR FLOOR FINISH.
4. ALL REMOVED ELECTRICAL EQUIPMENT, INCLUDING FIXTURES, POLES, CONDUIT, WIRE, DEVICES, AND ALL OTHER MATERIALS SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR AT NO ADDITIONAL COST. ALL FLUORESCENT BALLASTS CONTAINING PCB'S SHALL BE DISPOSED OF IN ACCORDANCE
WITH STATE AND FEDERAL GUIDELINES AT A DESIGNATED RECEIVING FACILITY.
5. BLANKING PLATES SHALL MATCH NEW PLATES INSTALLED.
6. WHERE EXISTING CIRCUITS ARE REWORKED BY THE ADDITION OR REMOVAL OF CONDUCTORS, THE
OLD WIRE SHALL BE REMOVED, THE CONDUIT SWABBED OUT, AND NEW THWN WIRES REPULLED
UNLESS INDICATED OTHERWISE.
7. WHILE REMOVING ALL ELECTRICAL ITEMS INSIDE THE INDICATED ALTERATION AREA, RECONNECT CIRCUITS TO MAINTAIN INTEGRITY OF EXISTING CIRCUITS AND CONTINUED OPERATION OF LIGHTING, EQUIPMENT AND DEVICES TO REMAIN.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING OR PATCHING OF WALLS, SIDEWALKS, PAVING, AND CONCRETE AS REQUIRED. CUTTING AND PATCHING WORK SHALL BE PERFORMED BY
SKILLED CRAFTSMEN. RETURN ALL WALLS AND THEIR FINISHES TO ORIGINAL CONDITION.
9. ABANDONED CONDUIT SHALL BE REMOVED WHERE POSSIBLE. ABANDONED CONDUIT IN SLAB OR CONCRETE WALLS WHICH CANNOT BE REMOVED SHALL HAVE WIRES PULLED FROM THEM. CUT OFF CONDUIT FLUSH WITH CONCRETE. PATCH OPENINGS AND PENETRATIONS WITH GROUT AND GRIND
OR TROWEL SMOOTH, READY FOR NEW FINISH.
10. EXISTING CONDUITS WHICH PENETRATE EXTERIOR WALLS SHALL BE REMOVED AND EXTERIOR WALL
PATCHED WITH LIKE MATERIALS.
11. ANY AND ALL HOLES OR DAMAGED SURFACES DUE TO DEMOLITION WORK SHALL BE PATCHED BY A
SKILLED CRAFTSMAN.
12. WHERE ITEMS ARE DESIGNATED EXISTING TO REMAIN, THEY SHALL BE PROTECTED DURING
DEMOLITION. RELOCATE AS REQUIRED WHERE ITEMS ARE INSTALLED IN CEILING.
13. ANY HAZARDOUS MATERIAL OR MATERIAL POSING A THREAT TO HEALTH OR THE ENVIRONMENT SHALL BE CAREFULLY DISPOSED OF IN AN APPROVED MANNER. THIS INCLUDES, BUT IS NOT LIMITED TO, FUEL OIL AND CONTAINERS, BATTERIES, BATTERY ACID, OILS, GREASE OR OTHER PETROLEUM
PRODUCTS, OR ANTIFREEZE COOLANT.
J
J
SHORTER TICKMARKS INDICATE 2 OR MORE PHASE CONDUCTORS, OR SWITCH LEGS
LONGER TICKMARKS INDICATE GROUNDED CONDUCTOR(S), QUANTITY AS SHOWN.
THE INSTALLATION SHALL COMPLY WITH THE INDICATED EDITION OF THE FOLLOWING CODES AND
ORDINANCES. WHERE SPECIFIC EDITION IS NOT INDICATED, COMPLY WITH THE LATEST
PUBLISHED EDITION.
NATIONAL FIRE PROTECTION ASSOCIATION - NFPA
NFPA 70 - 2020; NATIONAL ELECTRICAL CODE
FLORIDA BUILDING CODE
FBC-B 2023; THE FLORIDA BUILDING CODE (8th EDITION) FPC 2023; THE FLORIDA FIRE PREVENTION CODE (8th EDITION)
INCLUDING NFPA 101 - 2021; THE LIFE SAFETY CODE
FBC-A 2023; THE FLORIDA BUILDING CODE, ACCESSIBILITY (8th EDITION) FBC-EC 2023; THE FLORIDA BUILDING CODE, ENERGY CONSERVATION (8th EDITION) FBC-EB 2023; THE FLORIDA BUILDING CODE, EXISTING BUILDING (8th EDITION)
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NATIONAL ELECTRICAL SAFETY CODE
SERVING UTILITY COMPANY POLICIES
DEMOLITION NOTES - GENERAL
CODES AND REQUIREMENTS
GENERAL NOTES
DESCRIPTION OF WORK
SYMBOL LEGEND
POWER EQUIPMENT AND PANELS
POST-TOP LIGHT - EXISTING TO REMAIN
LIGHTING OUTLETS
ARM MOUNTED EXTERIOR LIGHT FIXTURE WITH POLE - SEE LIGHTING
FIXTURE SCHEDULE
DOUBLE ARM MOUNTED EXTERIOR LIGHT FIXTURE WITH POLE - SEE
LIGHTING FIXTURE SCHEDULE
NOTES:
1. VERTICAL REINFORCING BARS
SHALL BE SET IN A RADIAL FASHION
EQUIDISTANT FROM THE CENTER
AND EACH OTHER.
2. MAINTAIN 3" CLEARANCE BETWEEN
ALL REINFORCING STEEL AND
FORM SURFACE.
SECTION VIEW
PLAN VIEW
24" DIA.
#6 VERT.
3DO1
ANCHOR BOLTS BY
LIGHTING PROVIDER
1/2" CHAMFER
FINISHED GRADE
5x6 #6 x 5'-10" VERT.
5x5 3DO1 @ 4" TIES
PVC CONDUIT STUBBED UP 3"
ABOVE CONCRETE FOUNDATION.
NUMBER AND SIZE AS REQUIRED.
CONCRETE: 3000 PSI @ 28 DAYS
6'-4"
3" CLR.
1'-5"
1'-0" 1'-0"
5x2 5DO1
5x5 3DO1 @ 12" TIES
5x5 3DO1 WITH
1'-0" LAP
1'-0" 1'-6"
2'-0"
3'-0" 4'-0"
BUILDING SIDEWALK YARD DRIVEWAY AND PARKING LOT
1" MIN
DETECTABLE WARNING TAPE
AT LEAST 12" ABOVE CONDUIT
PER NEC 300.5
SECONDARY CONDUITS PER
UTILITY REQUIREMENTS
PRIMARY CONDUITS PER
UTILITY REQUIREMENTS
UNDERGROUND CONDUIT BURIAL DEPTHS NOT TO SCALE
DETAILS
STAINLESS STEEL
HEX HEAD BOLT
WITH WASHER
PULL SLOT
PROVIDE 6"-8"
OF GRAVEL
NOTES:
1. EFFECTIVELY SEAL TOPS OF
CONDUIT WITH UL LISTED
RE-ENTERABLE WATER SEAL
AFTER CABLES HAVE BEEN
PULLED.
2. SEE NOTE ON SITE PLAN FOR
BOX DIMENSIONS.
3. BASIS OF DESIGN: QUAZITE PC
STYLE TIER 15 POLYMER
CONCRETE ASSEMBLY WITH
OPEN BOTTOM.
4. BOX LID SHALL BE IDENTIFIED
AS "ELECTRICAL" AND SHALL
BE TIER 15 TRAFFIC RATED.
5. SEE DETAIL AT RIGHT FOR
GROUND ROD REQUIRED IN
EACH PULLBOX WHERE
INSTALLED ADJACENT TO
LIGHT POLE.
XXXXXXX
HANDHOLE / PULLBOX DETAIL NOT TO SCALE POLE BASE DETAIL NOT TO SCALE
LIGHTING FIXTURE SCHEDULE
FIXTURE
MARK WATTS
MOUNTING
NO. TYPE
LAMPS
LUMENS
DESCRIPTION
FIXTURE:
LED AREA LUMINAIRE, DIE CAST ALUMINUM HOUSING WITH INTEGRAL HEAT SINK, IP66 RATING, TYPE 3 MEDIUM DISTRIBUTION, ROUND POLE MOUNTING, DARK BRONZE THERMOSET POWDER COAT FINISH. 277 VOLT. SUPPLIER TO
VERIFY BOLT HOLES MATCH POLE.
(LITHONIA LIGHTING D-SERIES SIZE 1: DSX1-P2-35K-80-T3M-277-RPA-DDBXD)
POLE:
25' MOUNTING HEIGHT ROUND STRAIGHT STEEL POLE. COLD-ROLLED, COMMERCIAL QUALITY CARBON STEEL TUBING. 5" BUTT DIAMETER. NO TAPER. 4-BOLT STEEL BASE PLATE WITH BASE COVER. ANCHOR KIT. REINFORCED 3"X5" HANDHOLE WITH COVER AND STAINLESS STEEL HARDWARE. DARK BRONZE POWDER COAT FINISH. REFER TO PLANS FOR POLES WITH ONE AND TWO FIXTURES. WHERE TWO FIXTURES ARE SHOWN, THEY SHALL BE MOUNTED 180 DEGREES APART.
(HAPCO POLE PRODUCTS: RSS-25-D-5-4-BM)
9,300LP2 POLE 68- 3500K LED
FIXTURE:
LED AREA LUMINAIRE, DIE CAST ALUMINUM HOUSING WITH INTEGRAL HEAT SINK, IP66 RATING, TYPE 3 MEDIUM DISTRIBUTION, ROUND POLE MOUNTING, DARK BRONZE THERMOSET POWDER COAT FINISH. 277 VOLT. SUPPLIER TO
VERIFY BOLT HOLES MATCH POLE.
(LITHONIA LIGHTING D-SERIES SIZE 1: DSX1-P3-35K-80-T3M-277-RPA-DDBXD)
POLE:
25' MOUNTING HEIGHT ROUND STRAIGHT STEEL POLE. COLD-ROLLED, COMMERCIAL QUALITY CARBON STEEL TUBING. 5" BUTT DIAMETER. NO TAPER. 4-BOLT STEEL BASE PLATE WITH BASE COVER. ANCHOR KIT. REINFORCED 3"X5" HANDHOLE WITH COVER AND STAINLESS STEEL HARDWARE. DARK BRONZE POWDER COAT FINISH.REFER TO PLANS FOR POLES WITH ONE AND TWO FIXTURES. WHERE TWO FIXTURES ARE SHOWN, THEY SHALL BE MOUNTED 180 DEGREES APART.
(HAPCO POLE PRODUCTS: RSS-25-D-5-4-BM)
13,200LP3 POLE 102- 3500K LED
24" MAX.
QUAZITE PULLBOX AT
EACH LIGHT POLE - SEE
DETAIL
5/8"Ø X 10'L DRIVEN GROUND
ROD IN EACH PULLBOX FOR
BONDING TO LIGHT POLE
AND CIRCUIT EQUIPMENT
GROUNDING CONDUCTOR
TO NEXT LIGHT(S)
** FIXTURE AND POLE TYPES SPECIFIED SHALL BE PROVIDED TO MATCH MATERIALS FROM SEPARATE PROJECT ONSITE **
ID
R
EV
IS
IO
N
D R
A W
N :R
EV
IE
W
ED
:D A
TE
JO
N
BA
RB
ER
, P
E
BR
IA
N
W
AL
LA
CE
, P E
EA
ST
P
AR
K
AV
E, I-
0, TA
LL
AH
AS
SE
E, F
L
M
FE
-IN
C.
CO
M
0.
1.
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
PH
AS
E:
CO
NC
EP
T
SC
HE
M.
D
ES
IG
N
AD
VA
NC
ED
S
CH
EM
. D
ES
IG
N
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
DR
AW
N:
DA
TE
C on su lta nt
Description:
Jo b
Ti tle
Ad m in
P ar ki ng
L ot
L ig ht in g
FD
AC
S
N o.
: 3
Pr oj ec t #
Ph as e:
5.
0%
C on st ru ct io n D oc um en ts
C lie nt
Fl or id a
D ep ar tm en t O f A gr ic ul tu re
An d
C on su m er S er vi ce s
Ta lla ha ss ee , F lo rid a
Se al
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
/25
/25
BW
BW
1/0
5/2
BW
BW
E1.0
General Notes, Legend, and Details
PART 1 - GENERAL
APPLICATION
The work described hereunder shall be installed subject to the Contractual Conditions for the entire Specifications.
These provisions apply to all sections of Division 26 of this project except as specified otherwise in each individual section.
Codes, standards, policies and requirements contained in this Section are applicable to all contract documentation.
CORRELATION
This Section of the Specifications and its accompanying Drawings are made separate for the convenience of the General Contractor / Construction Manager in preparing his bid and in no way relieves the General Contractor / Construction Manager of his responsibility to correlate the work under this Section with that of all other trades as regards the items to be furnished by various Subcontractors, the exact location of all equipment and materials and the necessity of planning the work of all trades to avoid interference.
DESCRIPTION OF WORK
Furnish all labor, materials, equipment and incidentals required to complete all electrical work as specified in this Division and as shown on the Contract Drawings. Division 26 work shall include the installation of a complete and properly operating electrical system.
Refer to other Divisions of this specification for electrical requirements of factory installed motors, controllers, power supplies, etc. Electrical connections to equipment furnished as specified in other sections of these Specifications or shown on other than the Electrical Drawings shall be governed by this Division of the Specifications.
The bidder shall inspect the present jobsite conditions before preparing his bid. The submission of a bid will be considered evidence that such a visit and inspection was performed by the bidder and that he takes full responsibility for all factors governing his work.
The electrical work shall be complete, fully operational, and suitable in every way for the service required. Drawings are generally diagrammatic in nature and do not show all details, devices and incidental materials necessary to accomplish their intent. Therefore, it shall be understood that such devices and incidental materials required shall be furnished at no cost to the Owner.
RELATED WORK
Drawings and general provisions of Contract, including General Conditions, Supplementary General Conditions, and Special Conditions sections apply to work specified in Division 26.
The Contractor shall be aware that other divisions of these Specifications may apply to related work required to perform Division 26 requirements. All related work shall be performed in accordance with those divisions.
CONFORMANCE
If the Contractor takes no exceptions to these Specifications in the Submitted Bid, the Contractor will be held totally responsible for failure to comply.
Any exception to the Specification shall reference the affected paragraph(s), subject(s), and list benefit to the Owner.
The Owner reserves the right to have the Contractor replace installed material or equipment which does not comply with these Specifications at the Contractor's expense.
SUBMITTALS
Obtain approval before procurement, fabrication, or delivery of items to the job site. Submit manufacturers' data on the equipment listed below and as directed in other Sections of Division 26. Follow the procedures required in Division 1 of this specification. Data shall be in the form of manufacturer’s descriptive data sheets and engineering drawings and will be reviewed by the Architect/Engineer before materials and equipment are delivered to the work site. Review of the submittal by the Architect/Engineer is to check for general conformance to the design intent and will not relieve the Contractor of the responsibility for the correctness of all dimensions, conformance and the proper fitting of all parts of the work.
Lighting Fixtures Light Poles Quazite Pullboxes
Submit manufacturers' names and catalog numbers for the following materials:
Conduit, Fittings, and Couplings Boxes and Fittings 600 Volt Wire and Cables Grounding Equipment
The Contractor shall thoroughly check the submittal for accuracy and compliance with the contract requirements. Shop drawings and data sheets shall bear the date checked and shall be accompanied by the Contractor’s statement that they have been checked for conformity to the Specifications and Drawings.
Submittals not so checked and noted will be returned without review.
Deliver the entire electrical submittal to the Architect/Engineer complete and in one package. An incomplete submittal will be returned to the Contractor without review.
CODES, INSPECTION AND FEES
Comply with the indicated edition of the following codes and ordinances. Where specific edition is not indicated, comply with the latest published edition.
American National Standards Institute - ANSI C2 – The National Electrical Safety Code National Fire Protection Association - NFPA NFPA 70; The National Electrical Code NFPA 101; The Life Safety Code Florida Building Code FBC-B 2023; The Florida Building Code 8th Edition FPC 2023; The Florida Fire Prevention Code 8th Edition Serving Utility Company Policies City of Tallahassee Municipal Codes and Requirements
Obtain all permits required. Contractor shall pay all fees for permits and inspections.
RECORD DOCUMENTS
Prepare record documents in accordance with Division 1 requirements. Record documents shall be complete and accurate and clearly show deviations to the Contract Drawings.
Additionally, indicate major raceway sizes and routings, locations of all control devices, all equipment and locations to scale, and fuse and circuit breaker ratings and arrangements.
Record documents shall reflect the complete contract record, including all changes, supplements and addenda as issued. All drawings, sketches and notations describing the work and as issued by the Architect/Engineer shall be incorporated.
Prepare bound sets of equipment Operation and Maintenance Instructions. These instructions shall include the name and location of the system, the name and telephone number of the Contractor, and all subcontractors installing the system or equipment, and the name and telephone number of each local manufacturer’s representative for the system or equipment.
Routine maintenance actions shall be clearly identified and include a listing of approved disposable materials necessary.
Furnish bound copies of all test results required in other sections of this division.
GUARANTEES
Equipment: one (1) year from final acceptance by the Owner.
Materials and labor: one (1) year from final acceptance by the Owner.
All equipment shall be warranted to be free from defects in workmanship, design and materials. If any part of the equipment should fail during the warranty period, it shall be replaced and the unit(s) restored to service at no expense to the Owner.
In addition to the guarantee of equipment by the manufacturer the Contractor shall also guarantee such equipment for a period of one (1) year from final acceptance by the Owner. The Contractor's one (1) year guarantee shall be for equipment, materials, and labor.
The manufacturer's warranty period shall run concurrently with the Contractor's warranty period. No exception to this provision will be allowed.
Additional guarantee requirements specific to certain parts or assemblies or installations may be in the General and Special Conditions, or other Sections of these Specifications.
PART 2 - PRODUCTS
EQUIPMENT AND MATERIALS
Furnish materials or equipment specified by manufacturers named.
Materials furnished shall be new, undamaged and packed in the original manufacturer's packing.
All equipment and apparatus shall bear the seal of approval of the Underwriter’s Laboratory where testing and listing performance criteria has been established for like items.
Protect equipment and materials from mechanical and water damage during construction. Suitable storage facilities shall be provided. Equipment shall not be stored out-of-doors except as follows:
Concrete items, plastic conduit if protected from sunlight, rigid metal conduit if protected from water and debris, padmounted equipment for outdoor installation if maintained in a normal weathertight condition, ground rods, and large spools of cables with ends properly sealed. In no case will materials be stored directly on the ground. Provide suitable timbers or billets on which items will be stored out of direct contact with the earth.
All items to be installed shall be free of rust and dirt. Damaged materials and equipment shall be replaced by the Contractor at no cost to the Owner.
All electrical panels, enclosures, raceways, conduit, and boxes shall be fabricated of metal unless indicated otherwise.
EQUIPMENT AND MATERIALS STANDARDS
Design and fabrication of electrical equipment and materials:
The American National Standards Institute (ANSI) The American Society of Mechanical Engineers (ASME) The American Society for Testing and Materials (ASTM) The Institute of Electrical and Electronic Engineers (IEEE) The National Electrical Manufacturers Association (NEMA) The Occupational Safety and Health Administration (OSHA) The Underwriters Laboratories (UL) The National Fire Protection Association (NFPA)
Comply with the latest edition and revisions of these codes and standards.
PART 3 - EXECUTION
QUALITY ASSURANCE
Installer’s Qualifications: At least three years of successful installation experience on projects with electrical work similar to that required for this project.
Manufacturer’s Qualifications: Manufacturers regularly engaged in the manufacture of electrical components and equipment of the types and sizes required, whose products have been in satisfactory use in similar service for not less than five years.
Electrical work shall be performed by experienced persons skilled in the trade.
Work shall be done neatly and in keeping with good practice and conventions of the trade. The electrical installation shall be of high quality, and of the performance level associated with top level commercial electrical installations as determined by the Architect/Engineer and the National Electrical Code.
CLEANING AND PAINTING
Clean all equipment and boxes thoroughly inside and outside at the completion of installation. Do not leave dirt and debris inside panelboard and equipment cabinets, device and junction boxes, etc.
All painting shall be done according to the Finishes Section of these specifications.
Paint all exposed conduit and wiremold installed on painted surfaces to match surrounding surface. Paint exposed threads on conduits and touch up all scratches in galvanized pipe and fittings with a high quality cold galvanizing compound.
Touchup scratched or marred surfaces of lighting fixtures, panelboards, motor control centers, switchboards, etc. with paint furnished by the equipment manufacturer specifically for the purpose.
EXCAVATION, TRENCHING AND BACKFILLING
Perform all excavation and trenching to install raceways indicated on the drawings.
No tunneling shall be allowed unless written permission is received by the Architect/Engineer.
Excavated material not suitable for backfill shall be removed from the job site.
Insure that the bottom of trenches are uniform, without large rocks or lumps of dirt which could damage the raceway or conductors.
Backfill with material that will compact readily. Compact backfill material from bottom of excavation up, to within 2” of surrounding undisturbed material.
Cover shall not be less than surrounding grade and no greater than 2" above surrounding grade.
All trenching in and around rooted areas shall be by hand.
Contractor shall take all steps necessary to protect existing root growth from damage by trenching or digging. Trenching in proximity to trees and other growth shall be directed radially away from the main trunk so as not to cut across major roots.
All trenching routing shall be coordinated with and approved by the Architect/Engineer before digging. Contractor shall contact the Architect/Engineer twenty four hours before work is scheduled to begin. Conduit routing shall be clearly laid out with paint or staking before inspection takes place. The Architect/Engineer reserves the right to specify final routing before digging begins, or at any point during the operation.
TESTS
Contractor shall test all wiring for shorts and all equipment for proper grounding before energizing. Equipment shall be thoroughly checked and adjusted for proper operation. Check motors for proper rotation before energizing and adjust if necessary.
END OF SECTION
26 00 00 ELECTRICAL GENERAL REQUIREMENTS
PART 1 - GENERAL
SCOPE OF WORK
Furnish all labor, materials and equipment and incidentals required to construct and install the complete electrical systems as indicated on the Drawings and as specified in this Section.
STANDARD OF MATERIALS
All materials, equipment and apparatus covered by this specification shall be new, of current manufacture and shall bear the seal of approval of the Underwriters' Laboratories.
All equipment and materials shall have ratings established by a recognized independent agency or laboratory. The Contractor shall apply the items used on this project within the ratings and subject to any stipulations or exceptions established by the independent agency or laboratory.
All conduits and raceways, wire, devices, panelboards, switches, etc. of a given type shall be the product of one manufacturer.
PART 2 - PRODUCTS
CONDUCTORS
Compliance: Provide wires, cables and connectors that comply with the following standards as applicable:
UL Standard 83 Thermoplastic Insulated Wires and Cables UL Standard 486A Wire Connectors and Soldering Lugs for Use with Copper Conductors UL Standard 854 Service Entrance Cable NEMA/ICEA WC-5 Thermoplastic Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy NEMA/ICEA WC-8 Ethylene Propylene Rubber Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy IEEE Standard 82 Test procedures for Impulse Voltage Tests on Insulated Conductors
Wire and cable manufactured more than twelve months before delivery to the jobsite shall not be used.
All conductors shall be soft-drawn copper of not less than ninety-eight percent (98%) conductivity, with NEC Type THW, THHN, or THWN for No. 4 and smaller, and Type RHW, THW, or THWN for No. 2 and larger, 600 volt insulation.
Jackets: Factory applied nylon or PVC external jacketed wires and cables for installation in raceways and where indicated.
Color coding of all ungrounded service, feeder, and branch circuits conductors shall be required according to the following convention:
277/480 Volt, 3 phase: brown, orange, and yellow
Ground wires shall be green and neutrals shall be white or gray or other combination per NEC. Isolated grounding conductors shall be green with yellow stripe or green with applied yellow tape to indicate isolated ground. Ground and grounded wire colors shall be used for these purposes only. Where grounded conductors of different systems are installed in the same raceway, box, auxiliary gutter, or other type of enclosure, each grounded conductor shall be individually identified by system.
Additional grounded conductors shall be white with a readily distinguishable colored stripe, other than green, running along the insulation.
Conductors No. 12 AWG through No. 10 AWG shall be solid and No. 8 AWG and larger shall be stranded. No conductors smaller than No. 12 AWG shall be used except as otherwise noted.
Acceptable manufacturers: Anaconda Wire and Cable Co., General Electric Co., Okonite Co., Southwire Co., or Rome Cable Co.
GROUNDING AND BONDING
Conductors: type THW, THHN/THWN, or RHW to match power supply wiring.
Bonding Jumper Braid: copper braided tape, constructed of 30 gage bare copper wires and properly sized for application.
Flexible Jumper Strap: flexible flat conductor, 48,250 circular mils, with copper bolt hole ends sized for 3/8” diameter bolts.
Grounding Electrodes: solid steel core with a heavy uniform covering of electrolytic copper, 5/8" X 10'. Provide sectional rods if required. Threads, on sectional rods, shall be rolled (not cut) into the composite metal after the copper covering has been applied. Sectional rod couplings shall be of a corrosion resistant alloy.
PART 3 - EXECUTION
WIRING
All conductors shall be carefully handled to avoid kinks or damage to insulation.
All wires, cables and each conductor of multi-conductor cables shall be uniquely identified at each end by color or with wire and cable markers. Lighting and receptacle wiring shall be distinctly differentiated and junction boxes marked.
Lubrications shall be used, if required, to facilitate wire pulling.
Lubricants shall be UL approved for use with the insulation specified.
Tighten electrical connectors and terminals, including screws and bolts, in accordance with manufacturer’s published torque tightening values. Where manufacturer’s torqueing requirements are not indicated, tighten connectors and terminals to comply with tightening torques specified in UL 486A.
All 600 Volt wire insulation shall be tested with a "megger" after installation. Tests shall be made at not less than 500 Volts.
GROUNDING
Ground all non-current carrying metal parts of the electrical system to provide a low impedance path for ground fault current. Route ground connections and conductors to ground and protective devices in shortest and straightest paths as possible.
Insulated grounding bushings shall be required for all raceways, service entrance panels, distribution panels, all raceways one inch and larger and any raceway entering a concentric knock-out.
In general a ground wire shall be installed in every conduit. The conduit installation itself shall serve as an additional grounding means.
Where there are parallel feeders installed in more than one raceway, each raceway shall have a ground conductor.
Where conduits terminate without mechanical connection (i.e., locknuts and bushings) to panelboards, and for all terminations of conduit sizes one inch and larger; and for all sizes of metallic conduit (rigid or flexible) terminating in concentric knockouts, the following procedure shall be followed: Each conduit shall be provided with an insulated grounding bushing and each bushing connected with a bare copper conductor to the ground bus in the electrical equipment. The ground conductor shall be in accordance with Article 250 of the NEC.
Install ground rods as necessary to provide an earth ground having a test resistance of no more than 25 ohms.
Test ground rods for ground resistance value before any wire is connected. A portable ground testing megger shall be used to test each ground rod or group of rods. The instrument shall be equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the electrode tested.
Where tests show resistance to ground is over 25 ohms, reduce resistance to 25 ohms, or less, by driving additional ground rods; then retest.
Grounding connections shall be made by exothermal weld or by using a compatible mechanical connector and brazing completely over. Exothermal welds shall be made strictly in accordance with the weld manufacturer's written recommendations. Welds that have puffed up or which show convex surfaces, indicating improper cleaning, are not acceptable. No mechanical connector is required at exothermal welds.
Grounding conductors shall be attached to equipment with a bolt-on lug or approved tapered screw used for no other purpose. Use crimp-on spade lugs for stranded conductors.
IDENTIFICATION
Equipment
All enclosures containing energized components shall be marked with mylar labels identifying hazards. Such warning messages as "WARNING-HAZARDOUS VOLTAGE", “480 VOLTS", "240 VOLTS", etc. are acceptable. Labels shall be EZ-Code by Thomas & Betts or similar product.
Junction Box Identification: Each junction box cover shall be labeled with a permanent "magic" marker or other means to identify the circuits within. For example, a junction box containing lighting circuits 21, 23, 25 from Panel L2A would be labeled "L2A-21,23,25". Telephone junction boxes shall be labeled "T". Fire alarm system junction boxes shall be labeled “FA”. Public address, nurse call, and other system junction boxes shall be labeled accordingly.
Conductor Identification: All cables and wires shall be color coded as to phase per convention. See color coding above.
FIREPROOFING
All conduit and boxes passing through or installed within fire walls and smoke walls shall be installed so as to maintain the integrity and rating of the wall through which it passes. Boxes shall be installed within 1/8" of wall surface. Conduits penetrating rated floors shall be installed to maintain the fire rating of the floor using UL approved sealing materials.
END OF SECTION
26 05 00 - BASIC ELECTRICAL MATERIALS AND METHODS
ID
R
EV
IS
IO
N
D R
A W
N :R
EV
IE
W
ED
:D A
TE
JO
N
BA
RB
ER
, P
E
BR
IA
N
W
AL
LA
CE
, P E
EA
ST
P
AR
K
AV
E, I-
0, TA
LL
AH
AS
SE
E, F
L
M
FE
-IN
C.
CO
M
0.
1.
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
PH
AS
E:
CO
NC
EP
T
SC
HE
M.
D
ES
IG
N
AD
VA
NC
ED
S
CH
EM
. D
ES
IG
N
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
DR
AW
N:
DA
TE
C on su lta nt
Description:
Jo b
Ti tle
Ad m in
P ar ki ng
L ot
L ig ht in g
FD
AC
S
N o.
: 3
Pr oj ec t #
Ph as e:
5.
0%
C on st ru ct io n D oc um en ts
C lie nt
Fl or id a
D ep ar tm en t O f A gr ic ul tu re
An d
C on su m er S er vi ce s
Ta lla ha ss ee , F lo rid a
Se al
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
/25
/25
BW
BW
1/0
5/2
BW
BW
E1.1
Specifications
PART 1 - GENERAL
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
SUMMARY
This Section includes all labor, material, equipment and services necessary and incidental to complete all the demolition and removal of electrical work as shown on the Drawings or as required.
The demolition drawings do not necessarily indicate all the conditions, details, or work required. The Contractor shall examine the building to determine the actual conditions and extent of the work. Any details not clear to this Contractor shall be referred to the Engineer for clarification prior to bidding.
The Contractor shall be responsible for demolition and removal of all existing electrical systems where shown for demolition. No portion of electrical systems shown for demolition may be abandoned in place.
SUBMITTALS
Shop Drawings: Indicate demolition and removal sequence and location of salvageable items.
Schedules: Submit schedule showing time and detailed sequence of demolition, removal of materials and arranged coordination of anticipated electrical interruptions.
1. Schedule demolition and removal work to ensure uninterrupted progress of Owner's on-site operations.
Project Record Documents: Submit in accordance with Section 260000.
1. Accurately record actual locations of abandoned or dead ended utilities.
QUALITY ASSURANCE
Contractor shall verify the extent of the demolition work. Any questions as to which systems are to be removed versus which systems are to remain shall be referred to the Engineer for clarification prior to commencing demolition work.
The demolition work shall be a phased operation and shall comply with the construction sequence schedule.
Do not close or obstruct egress width of fire exits or access.
Do not disable or disrupt building fire or life safety systems without written permission from the Owner. In all cases, permission shall have been granted not less than ten (10) working days prior to the intended interruption.
PROJECT CONDITIONS
Owner will vacate demolition area prior to start of demolition work.
Owner will continuously occupy areas of building immediately adjacent to selective demolition areas.
Conduct selective demolition work in manner that will minimize need for disruption of Owner's normal operations.
Provide minimum of ten (10) working days advanced notice to Owner of demolition activities which will severely impact Owner's normal operations.
Maintain free and safe passage to and from Owner occupied areas.
Condition of Structures: Owner assumes no responsibility for actual condition of areas to be demolished.
Traffic and Passageways: Maintain accessibility for fire fighting apparatus.
1. Conduct demolition operations and debris removal to avoid interference with adjacent occupied facilities.
2. Obtain written permission from authorities having jurisdiction prior to closing or obstructing adjacent occupied facilities.
3. Provide alternate routes when closing or obstructing traffic ways when required by governing authorities.
4. Ensure safe passage of persons around area of demolition. Provide and maintain temporary covered passageways; comply with requirements of governing authorities.
Protection: Perform work in manner to eliminate hazards to persons or property and avoid interference with adjacent areas.
1. Maintain existing utilities that are to remain in service and protect from damage during demolition operations.
2. Do not interrupt existing utilities serving occupied facilities, except when authorized by Owner in writing. Provide temporary services during interruptions.
3. Coordinate in advance with Owner electrical interruptions.
4. Protect existing floors with suitable coverings when necessary.
COORDINATION
The Contractor shall be responsible for coordinating demolition of all affected electrical systems to prevent disruption to the Owner and minimize downtime.
The Contractor shall be responsible for coordinating demolition by other Divisions of the Specifications to prevent disruption to the Owner and minimize downtime.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
EXAMINATION
Beginning alterations to existing building systems means the installer accepts existing conditions.
PREPARATION
Provide, erect, and maintain temporary barriers, warning notifications…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .