Exhibit A - CDRLs.pdf

PDF 2 MB Posted

Attached to
Precise Antennas Narrow-beam Transmitting Highly Energized Radiation (PANTHER)
Solicitation number
N00173-21-R-RJ03
Issued by

About this file

This document contains a solicitation for research and development services in support of the Precise Antennas Narrow-beam Transmitting Highly Energized Radiation (PANTHER) program. The Naval Research Laboratory requires the contractor to refine and implement signal generation techniques across the radio frequency spectrum employing high levels of power. This includes continuing research on signal generation techniques with various signal parameters such as pulse-widths, pulse repetition intervals, and effective isotropic radiated powers. The contractor shall also research, design, develop, and modify associated software and hardware to generate efficient signals for use with Navy space and airborne assets. Offerors must submit any questions in response to this request for proposal by September 1, 2021, with proposals due no later than October 8, 2021. The opportunity is set aside for small businesses and will continue the prototyped development from a previous contract to refine atmospheric research and spacecraft/aircraft calibration capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0001 A

N00173-20-X-XXXX TO BE PROVIDED AT AWARD

A001 MONTHLY COST AND PERFORMANCE REPORT

N/A SOW Section 6.0 NRL Code 8145

LT

N/A N/A

Mthly

AWARD

30 DAC

Code 8145 1 Code 8145 1

0 2 0

The Contractor shall provide Cost and Performance Reports to the COR on a monthly frequency by the 15th day of each month for the preceding month in electronic format. DD 250 requirements shall be on an LT basis. The report may be in the Contractor's format as reviewed and approved by the COR and, as a minimum, shall contain the following information:

1. Contract Number

2. Reporting Period covered by Report

3. Total amount funded for Contract

4. Total amount invoiced to date, including a breakdown by ACRNs prorated in proportion to the unliquidated balance.

5. Total amount invoiced for this reporting period

6. Estimated cost to complete, with explanation if more than total amount funded.

7. Schedule status, indicating if efforts are on schedule or note, with explanations for delays and projected impact of delays

8. Contractor hours expended on NRL property, if any, including employee names number of ours worked, and specific contract task(s) involved

9. Technical Progress, including a brief narrative on technical progress made, significant accomplishments, meetings attended, Simplified EVMMetrics/ Tracking, current activities, issues, etc.

10. Briefs/Reports generated.

11. Travel Activity

12. Plans for next reporting period

13. Technical problem areas and potential solutions

Adobe Professional 8.0

A002 TECHNICAL REPORTS

N/A SOW SECTION 6.0 NRL Code 8145

LT

N/A N/A

SEE BLK. 16

AWARD

SEE BLK. 16

SEE BLK. 16

Code 8145, COR 1 Code 8145 1

0 2 0

For the purpose of this document, "technical reports, documentation and deliverables" shall include, but may not be limited to: Computer-Based Deliverables; Technical Reports and Papers, and such other documentation and deliverables as are required pursuant to Contract Section C and Attachment I.

1. The Contractor shall provide any and all computer-based deliverables developed under this Contract associated with Systems Engineering, Integration and Testing, Technical Assessments, General Design and Development Support, and Program Management Tasks under the Satellite Research and Development effort, Communication Research and Development effort, and the Comprehensive Maritime Awareness effort incorporated in Contract Section C, which shall include, but may not be limited to : Hardware, Software, hardware and software documentation, source and user codes, models, algorithms, simulations, hardware and software development plans, hardware and software design documents, experiment-acquired data is all formats; and hardware and software test and validation descriptions, plans and results.

2. The Contractor shall provide Technical Reports and Papers, Design Drawings, Documentation, Plans, Manuals, and such other data deliverables as may be required to pursue the research effort. These deliverables shall include, but may not be limited to:

design and fabrication documents, drawings & etc.; performance, qualification and acceptance test descriptions, plans and results; block diagrams, data flow diagrams, frequency plans, link budgets, industry surveys, engineering approach evaluations and recommendations, technical recommendations, performance standards, validation of assembly and integration reports and documentation; problem identification reports, solution recommendations, technical and scientific assessments reports; mission application, techniques, design and protocol recommendations; illustrations, ~drawings and other graphic materials; scanned and edited mechanical and electrical drawings; new and emerging technologies summaries, reports, surveys, and investigations; multi-media briefing presentations; reports on web-enabled services and enterprise applications;

procurement recommendations; development plans; repairs recommendations and results;

System Requirements, Preliminary Design, land Critical Design Review; and Technical Interface Meeting reviews.

If not specifically stated in the Statement of Work, the format of all deliverables under this CDRL shall be the Contractor's format as reviewed and approved by the COR.

s

001 A

N00173-20-X-XXXX TO BE PROVIDED AT AWARD

A003 TECHNICAL & PROGRAM PROGRESS REPORTS

SOW SECTION 6.0 NRL Code 8145

LT Monthly

AWARD

30 DAC

SEE BLK. 16

Code 8145, COR 1 Code 8145 1

0 2 0

The Contractor shall provide monthly technical progress reports summarizing problems & areas of concern for which Govt. assistance or guidance is needed; and state any anticipated deviation in the Contractor's plan to achieve scientific/technical objectives. The Contractor shall describe technical progress during the reporting period, cite major changes in the technical approach planned at the beginning of the reporting period, and specify any anticipated technical, administrative or logistical problems. The report shall include the following topics: task-objectives, general technical approach, status at the beginning and end of the reporting period; important findings and their implications; and significant hardware and software developments. Unless otherwise stated, the format for all deliverables under this CDRL shall be the Contractor's format as reviewed and approved by the COR. Reports shall be provided by the 15th day of each month for the preceding month in electronic format

A004

FINAL REPORT

SOW SECTION 6.0 NRL Code 8145

DD ONE

SEE BLK. 16

SEE BLK 16

N/A Code 8145, COR 1 Code 8145 1

ACO (trx ltr only)

0 2 0

For the purpose of this document, FINAL REPORT shall be a comprehensive summary of all scientific objectives, findings and recommendations, research, development and other efforts performed, and the results obtained over the entire contract period in all of the proposed task areas.

The report shall be submitted to the COR on a one-time basis not later than 30 days after completion of the contract, and requires a DD-250 for acceptance by the COR.

A005 CONTRACTOR ON-SITE LABOR REPORT

N/A SOW SECTION 6.0 NRL Code 8145

LT

N/A N/A

MONTHLY

AWARD

30 DAC

SEE BLK. 16

Code 8145, COR 1 Code 8145, AO 1

0 2 0

The Contractor shall deliver On-Site Labor Reports electronically, no later than five (5) days after the end of each reporting month. The required report shall, at a minimum, include the following data: Reporting Period, Contract Number, Contract Value, Current Funding, Amount Expended in Current Period, Total Expenditure to Date, and Date Submitted.

Labor (including subcontractor effort): Show employee name, number of hours, and total amount billed for contractor employees working on-site at NRL. If the contractor employees worked on multiple tasks (as defined by the COR), the number of hours worked on each task shall be shown separately. The report shall be in the Contractor's format as reviewed and approved by the COR.