This document is a Contract Data Requirements List (CDRL) for a Subsafe Level I contract for a TR-317 Series Hull Penetrator Assembly. The contract (N66604-25-RFPREQ-NPT-15-0081) involves multiple data items across different categories, including meeting minutes, test procedures, engineering change proposals, and technical reports. The contractor is currently listed as TBD, with various submission requirements for each data item, including draft and final deliverables to be submitted to the Navy's requiring office (NUWCDIVNPT Code 1535).

The document outlines specific submission timelines and review processes for each data item, with most submissions requiring government review within 5-10 days and final submissions due 10-15 days after initial drafts. All submissions are subject to export control restrictions under the Arms Export Control Act, with potential severe criminal penalties for violations. The contract appears to be for a technical naval project involving hull penetrator assembly, with rigorous documentation and testing requirements across multiple stages of development, including preliminary and final design reviews, acceptance testing, and ongoing engineering change management.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBSAFE / LEVEL I

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 17 of 17

DD FORM 1423

CONTRACT DATA REQUIREMENTS LIST ADDENDUM

CDRL A007 BLOCK 16 ADDENDUM

EVENT TO DELIVER BLOCK 12

(Date of First Submission)

BLOCK 8

(Approval Code)

BLOCK 13

(Date of Subsequent

Submission)

PCR

CONTRACTOR

SUBDRAWINGS

(.pdf, and hardcopy printed from .pdf)

15 DAYS PRIOR TO PCR

(If PCR and FCR combined, submit top level drawing for Government review prior to complete draft development and submittal)

GOVERNMENT WILL

REVIEW WITHIN 5 DAYS

10 DARC

FCR

CONTRACTOR

SUBDRAWINGS

(.pdf, hardcopy, and indentured and numerical lists (in .xlsx only))

20 DAYS PRIOR TO FCR

GOVERNMENT WILL

REVIEW WITHIN 10 DAYS

10 DARC

FA-PCA

CONTRACTOR

SUBDRAWINGS

(.pdf and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO FA-

PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FA-PCA

20 DARC

FCA/PCA

CONTRACTOR

SUBDRAWINGS

(.pdf, and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO

FCA/PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FCA/PCA

20 DARC

(after all discrepancies resolved, Govt. will provide revision block information)