Exhibit A - CDRL Information - NGT II - 12Jun2025.pdf
PDF 442 KB Posted
- Solicitation number
- W519TC25RNGT2
About this file
This document is a Contract Data Requirements List (CDRL) for the Next Generation Transponder (NGT)-II contract, dated 12 June 2025. The CDRL outlines 11 specific data deliverables that the contractor must provide throughout the contract, including monthly reports, user guides, project progress review briefings, website updates, warranty support procedures, interface control documents, spectrum supportability compliance documentation, transponders for testing, transponder documentation, and label examples.
Each CDRL item has detailed submission requirements, including frequency of delivery (ranging from once to monthly), initial submission timelines (typically 14-30 calendar days after contract award), and specific distribution instructions. All deliverables are subject to government review, with a standard 5-working-day correction period if comments are received. The documents have a Distribution Statement D, limiting distribution to DoD and DoD contractors to protect technical/operational data. The requiring office for all items is SFAE-PSA-LS, and most deliverables are to be submitted electronically in formats such as MS Word, PDF, or PowerPoint, with government approval.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Next Generation Transponder (NGT)-II
W519TC-25-R-NGT2
EXHIBIT A
Contract Data Requirements List (CDRLs)
Version 1.0
12 June 2025
Contract Data Requirements List (CDRLs) List
CDRL Description A001 Monthly Report A002 User Guide A003 Project Progress Reviews (PPR) Briefing Charts A004 PPR Minutes A005 Web Sites / Updates
A006 Warranty Support Procedures A007 Interface Control Document (ICD) A008 Spectrum Supportability Compliance (DD1494) A009 Transponders for Testing A010 Transponder Documentation A011 Label Examples
DD Form 1423-1, Contract Data Requirements List (1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE-ITEM NO.
N/A
B. EXHIBIT
B – CDRL TEMPLATE
C. CATEGORY: Technical Data Package (TDP)
OTHER MISC
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
CDRL# A001
2. TITLE OF DATA ITEM
NGT II Monthly Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable (see BLK 16)
5. CONTRACT REFERENCE
PWS Para 6.2
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MTHLY
12. DATE OF FIRST
SUBMISSION
See Box 16 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
N/A 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
See Box 16
b. COPIES Electronic (MS Word) and hard copy with proposal
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 7 CALENDAR DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE INITIAL DELIVERABLE SHALL BE PROVIDED
ON THE 10TH CALENDAR DAY OF THE MONTH FOLLOWING THE ONE
MONTH PERIOD AFTER THE CONTRACT EFFECTIVE DATE. ALL
SUBSEQUENT REPORTS SHALL BE SUBMITTED IN MONTHLY
INCREMENTS ON THE 10TH CALENDAR DAY OF THE MONTH.
BLOCK 11: THE “AS OF DATE” WILL BE THE SAME AS BLOCK 12
BLOCK 14: MS EXCEL TEMPALTE PROVIDED BY THE USG. REPORTS
SHALL BE DISSEMINATED VIA ELETRONIC MEDIA TO
INDIVIDUALS/ORGANIZATIONS INDEITIFIED IN THE PWS AND THIS
FORM.
Contracting Office 0 1 0
COR 0 1 0
15. TOTAL 0 2 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
CDRL# A002
2. TITLE OF DATA ITEM
User Guide
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS Para 5.3
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
As Needed
12. DATE OF FIRST
SUBMISSION
30DAC 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See Block 16
11. AS OF DATE
12 Jun 2025
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
b. COPIES
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 7 CALENDAR DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: INITIAL DELIVERABLE SHALL BE PROVIDED
WITHIN 30 CALENDAR DAYS OF CONTRACT AWARD. UPDATED
SUBMISSIONS SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS OF
CHANGES TO THE CONTRACT VIA A CONTRACT MODFICIATIONS/CCP.
BLOCK 14: PDF FILE, CONTRACTOR FORMAT, GOVERNMENT
ACCEPTED. REPORTS SHALL BE DISSEMINATED VIA ELECTRONIC
MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN THE PWS AND
BLOCK 14.
Contracting Office
0 1 0
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT A
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
RF-ITV V
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
CDRL# A003
2. TITLE OF DATA ITEM
PPR Briefing Charts
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
N/A
5. CONTRACT REFERENCE
PWS Para 6.2.2
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See BLK 16
12. DATE OF FIRST
SUBMISSION
See BLK 16 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
N/A 11. AS OF DATE
12 Jun 2025
13. DATE OF SUBSEQUENT
SUBMISSION
Monthly
b. COPIES Electronic (MS Word)
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN FINVE (5) WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION.
BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED AT A
MINIMUM FIVE CALENDAR DAYS BEFORE THE SCHEDULE PPR
MEETING.
BLOCK 14:MS POWERPOINT. CONTRACTOR FORMAT ACCEPTALBE
WITH USG APPROVAL. PRESENTATION SHALL BE DISSEMINATED VIA
ELECTRONIC MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN
THE PWS AND BLOCK 14.
Contracting Office 0 1 0
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
CDRL# A004
2. TITLE OF DATA ITEM
PPR Minutes
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS Para 6.2.2
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QRTLY
12. DATE OF FIRST
SUBMISSION
Following 1st PPR 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 Jun 2025
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
b. COPIES Electronic (MS Word)
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED AT A
MINIMUM FIVE CALENDAR DAYS AFTER THE SCHEDULE PPR MEETING.
BLOCK 14:MS WORD OR PDF. CONTRACTOR FORMAT ACCEPTALBE
WITH USG APPROVAL. FILE SHALL BE DISSEMINATED VIA ELECTRONIC
MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN THE PWS AND
BLOCK 14.
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Website / Updates
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS Para 5.5
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
60DAC 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 Jun 2025
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN
60 CALENDAR DAYS AFTER CONTRACT AWARD DATE.
BLOCK 14: WORLDWIDE WEBSITE FOR USE BY THE GOVERNMENT. ALL
DETAILS FOUND IN PWS SECTION 5.5 SHALL BE AVAILABLE ON THE
WEBSITE. THE WEBSITE SHALL BE UPDATED WITHIN 14 CALENDAR
DAYS OF ANY CHANGES TO THE CONTRACT (I.E. CCP)
15. TOTAL 0 0 0
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Warranty Support Procedures
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS Para 5.6
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See BLK 16
12. DATE OF FIRST
SUBMISSION
30DAC 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN
30 CALENDAR DAYS AFTER CONTRACT AWARD DATE.
BLOCK 14: MS WORK OR PDF FILE. CONTRACTOR FORMATTED, USG
ACCEPTED. FILE SHALL BE DISSEMINATED VIA ELECTRONIC MEDIA TO
INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.
15. TOTAL 0 0 0
Form Approved
OMB NO. 0704-
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
C
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Interface Control Document (ICD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS Para 4.8.1
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ANNUALLY
12. DATE OF FIRST
SUBMISSION
30DAC 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN
30 CALENDAR DAYS AFTER CONTRACT AWARD DATE. SUBSEQUENT
SUBMISSIONS WILL OCCUR ANNUALLY OR AS UPDATES ARE REQUIRED.
BLOCK 14: GOVERNMENT PROVIDED FORMAT CREATED WITH
CONTRACTOR AND RF-ITV PROGRAM MANGEMENT OFFICE. FILE SHALL
BE DISSEMINATED VIA ELECTRONIC MEDIA TO INDIVIDUALS/
ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.
I
18. ESTIMATED
TOTAL PRICE
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
D
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Spectrum Supportability Compliance (DD1494)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS Para 3.4
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
14DAC 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN
14 CALENDAR DAYS AFTER CONTRACT AWARD DATE. SUBSEQUENT
SUBMISSIONS WILL OCCUR AS UPDATES ARE REQUIRED THROUGH
CCPs.
BLOCK 14: DD-1494 FORMAT. FILE SHALL BE DISSEMINATED VIA
ELECTRONIC MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN
THE PWS AND BLOCK 14.
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
TRANSPONDER FOR TESTING
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS PARA 3.3
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
14DAC 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE TRANSPONDERS SHALL BE PROVIDED
WITHIN 14 CALENDAR DAYS AFTER CONTRACT AWARD DATE. ANY
ADDITIONAL PRODUCTS THAT REQUIRE TESTING DUE TO NEW
PRODUCT OR FAILED INITIAL TESTING WILL BE AT THE EXPENSE AND
SCHEDULE OF THE CONTRACTOR
BLOCK 14: THE CONTRACTOR SHALL PROVIDE NO MORE THAN TWO (2)
ACTIVIATED AND OPERATIONAL TRANSPONDERS FOR EACH CLIN THE
CONTRACTOR HAS BEEN AWARDED. THESE TRANSPONDERS WILL BE
SHIPPED DIRECTLY TO THE TESTING FACILITY PROVIDED BY THE
GOVERNMENT UPON AWARD.
TESTING FACILITY
0 2 0
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
N/A
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
TRANSPONDER DOCUMENTATION
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS PARA
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE TRANSPONDERS SHALL BE PROVIDED
WITHIN 14 CALENDAR DAYS AFTER CONTRACT AWARD DATE. ANY
ADDITIONAL PRODUCTS THAT REQUIRE TESTING DUE TO NEW
PRODUCT OR FAILED INITIAL TESTING WILL BE AT THE EXPENSE AND
SCHEDULE OF THE CONTRACTOR
BLOCK 14: CONTRACTOR FORMATTED. FILE(S) SHALL BE
DISSEMINATED VIA ELECTRONIC MEDIA TO INDIVIDUALS/
ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.
DOCUMENTS INCLUDED FOR THIS CDRL ARE ANY GOVERNMENT
REQUIRED TESTING CERTIFICAITONS/REPORTS, VERIFICATION FOR
CCP MEDIUM ROBUSTNESS LEVEL, AND VERIFICATION FOR DOD
UNIFIED CAPABILITILES (UC) APPROVED PRODUCT LIST (APL).
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
N/A
B. EXHIBIT
E
C. CATEGORY: Technical Data Package (TDP) OTHER Program Management
D. SYSTEM/ITEM
NGT-II
E. CONTRACT/PR NO.
Post Award
F. CONTRACTOR
Post Award
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
TRANSPONDER LABEL
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Not applicable
5. CONTRACT REFERENCE
PWS PARA 4.3, 4.3.1
6. REQUIRING OFFICE
SFAE-PSA-LS
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16 14. DISTRIBUTION
8. APP CODE
A (See Block 16)
See BLK 16 11. AS OF DATE
12 JUN 2025
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
b. COPIES N/A
16. REMARKS a. ADDRESSEE DRAFT
FINAL
Reg Repro
BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.
ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL
BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF
GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT
TECHNICAL/OPERATIONAL DATA OR INFORMATION
BLOCKS 10, 12 AND 13: THE TRANSPONDERS SHALL BE PROVIDED
WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD DATE.
BLOCK 14: CONTRACTOR FORMAT, USG APPROVED. FILE SHALL BE
DISSEMINATED VIA ELECTRONIC MEDIA TO INDIVIDUALS/
ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.
Contract Data Requirements List (CDRLs) List
File details come from the government source that posted it. Updated .