Exhibit A - CDRL Information - NGT II - 12Jun2025.pdf

PDF 442 KB Posted

Attached to
W519TC-25-R-NGT2 - DRAFT RFP for Next Generation Transponder (NGT)-II
Solicitation number
W519TC25RNGT2
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for the Next Generation Transponder (NGT)-II contract, dated 12 June 2025. The CDRL outlines 11 specific data deliverables that the contractor must provide throughout the contract, including monthly reports, user guides, project progress review briefings, website updates, warranty support procedures, interface control documents, spectrum supportability compliance documentation, transponders for testing, transponder documentation, and label examples.

Each CDRL item has detailed submission requirements, including frequency of delivery (ranging from once to monthly), initial submission timelines (typically 14-30 calendar days after contract award), and specific distribution instructions. All deliverables are subject to government review, with a standard 5-working-day correction period if comments are received. The documents have a Distribution Statement D, limiting distribution to DoD and DoD contractors to protect technical/operational data. The requiring office for all items is SFAE-PSA-LS, and most deliverables are to be submitted electronically in formats such as MS Word, PDF, or PowerPoint, with government approval.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Next Generation Transponder (NGT)-II

W519TC-25-R-NGT2

EXHIBIT A

Contract Data Requirements List (CDRLs)

Version 1.0

12 June 2025

Contract Data Requirements List (CDRLs) List

CDRL Description A001 Monthly Report A002 User Guide A003 Project Progress Reviews (PPR) Briefing Charts A004 PPR Minutes A005 Web Sites / Updates

A006 Warranty Support Procedures A007 Interface Control Document (ICD) A008 Spectrum Supportability Compliance (DD1494) A009 Transponders for Testing A010 Transponder Documentation A011 Label Examples

DD Form 1423-1, Contract Data Requirements List (1 Data Item)

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE-ITEM NO.

N/A

B. EXHIBIT

B – CDRL TEMPLATE

C. CATEGORY: Technical Data Package (TDP)

OTHER MISC

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

CDRL# A001

2. TITLE OF DATA ITEM

NGT II Monthly Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable (see BLK 16)

5. CONTRACT REFERENCE

PWS Para 6.2

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

MTHLY

12. DATE OF FIRST

SUBMISSION

See Box 16 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

N/A 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

See Box 16

b. COPIES Electronic (MS Word) and hard copy with proposal

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 7 CALENDAR DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE INITIAL DELIVERABLE SHALL BE PROVIDED

ON THE 10TH CALENDAR DAY OF THE MONTH FOLLOWING THE ONE

MONTH PERIOD AFTER THE CONTRACT EFFECTIVE DATE. ALL

SUBSEQUENT REPORTS SHALL BE SUBMITTED IN MONTHLY

INCREMENTS ON THE 10TH CALENDAR DAY OF THE MONTH.

BLOCK 11: THE “AS OF DATE” WILL BE THE SAME AS BLOCK 12

BLOCK 14: MS EXCEL TEMPALTE PROVIDED BY THE USG. REPORTS

SHALL BE DISSEMINATED VIA ELETRONIC MEDIA TO

INDIVIDUALS/ORGANIZATIONS INDEITIFIED IN THE PWS AND THIS

FORM.

Contracting Office 0 1 0

COR 0 1 0

15. TOTAL 0 2 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

CDRL# A002

2. TITLE OF DATA ITEM

User Guide

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Para 5.3

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

As Needed

12. DATE OF FIRST

SUBMISSION

30DAC 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See Block 16

11. AS OF DATE

12 Jun 2025

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

b. COPIES

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 7 CALENDAR DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: INITIAL DELIVERABLE SHALL BE PROVIDED

WITHIN 30 CALENDAR DAYS OF CONTRACT AWARD. UPDATED

SUBMISSIONS SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS OF

CHANGES TO THE CONTRACT VIA A CONTRACT MODFICIATIONS/CCP.

BLOCK 14: PDF FILE, CONTRACTOR FORMAT, GOVERNMENT

ACCEPTED. REPORTS SHALL BE DISSEMINATED VIA ELECTRONIC

MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN THE PWS AND

BLOCK 14.

Contracting Office

0 1 0

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT A

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

RF-ITV V

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

CDRL# A003

2. TITLE OF DATA ITEM

PPR Briefing Charts

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

PWS Para 6.2.2

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

See BLK 16

12. DATE OF FIRST

SUBMISSION

See BLK 16 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

N/A 11. AS OF DATE

12 Jun 2025

13. DATE OF SUBSEQUENT

SUBMISSION

Monthly

b. COPIES Electronic (MS Word)

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN FINVE (5) WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO

THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION.

BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED AT A

MINIMUM FIVE CALENDAR DAYS BEFORE THE SCHEDULE PPR

MEETING.

BLOCK 14:MS POWERPOINT. CONTRACTOR FORMAT ACCEPTALBE

WITH USG APPROVAL. PRESENTATION SHALL BE DISSEMINATED VIA

ELECTRONIC MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN

THE PWS AND BLOCK 14.

Contracting Office 0 1 0

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

CDRL# A004

2. TITLE OF DATA ITEM

PPR Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Para 6.2.2

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

QRTLY

12. DATE OF FIRST

SUBMISSION

Following 1st PPR 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 Jun 2025

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16

b. COPIES Electronic (MS Word)

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED AT A

MINIMUM FIVE CALENDAR DAYS AFTER THE SCHEDULE PPR MEETING.

BLOCK 14:MS WORD OR PDF. CONTRACTOR FORMAT ACCEPTALBE

WITH USG APPROVAL. FILE SHALL BE DISSEMINATED VIA ELECTRONIC

MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN THE PWS AND

BLOCK 14.

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Website / Updates

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Para 5.5

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

60DAC 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 Jun 2025

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN

60 CALENDAR DAYS AFTER CONTRACT AWARD DATE.

BLOCK 14: WORLDWIDE WEBSITE FOR USE BY THE GOVERNMENT. ALL

DETAILS FOUND IN PWS SECTION 5.5 SHALL BE AVAILABLE ON THE

WEBSITE. THE WEBSITE SHALL BE UPDATED WITHIN 14 CALENDAR

DAYS OF ANY CHANGES TO THE CONTRACT (I.E. CCP)

15. TOTAL 0 0 0

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Warranty Support Procedures

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Para 5.6

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

See BLK 16

12. DATE OF FIRST

SUBMISSION

30DAC 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN

30 CALENDAR DAYS AFTER CONTRACT AWARD DATE.

BLOCK 14: MS WORK OR PDF FILE. CONTRACTOR FORMATTED, USG

ACCEPTED. FILE SHALL BE DISSEMINATED VIA ELECTRONIC MEDIA TO

INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.

15. TOTAL 0 0 0

Form Approved

OMB NO. 0704-

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

C

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Interface Control Document (ICD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Para 4.8.1

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ANNUALLY

12. DATE OF FIRST

SUBMISSION

30DAC 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN

30 CALENDAR DAYS AFTER CONTRACT AWARD DATE. SUBSEQUENT

SUBMISSIONS WILL OCCUR ANNUALLY OR AS UPDATES ARE REQUIRED.

BLOCK 14: GOVERNMENT PROVIDED FORMAT CREATED WITH

CONTRACTOR AND RF-ITV PROGRAM MANGEMENT OFFICE. FILE SHALL

BE DISSEMINATED VIA ELECTRONIC MEDIA TO INDIVIDUALS/

ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.

I

18. ESTIMATED

TOTAL PRICE

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

D

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Spectrum Supportability Compliance (DD1494)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Para 3.4

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

14DAC 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE DELIVERABLE SHALL BE PROVIDED WITHIN

14 CALENDAR DAYS AFTER CONTRACT AWARD DATE. SUBSEQUENT

SUBMISSIONS WILL OCCUR AS UPDATES ARE REQUIRED THROUGH

CCPs.

BLOCK 14: DD-1494 FORMAT. FILE SHALL BE DISSEMINATED VIA

ELECTRONIC MEDIA TO INDIVIDUALS/ORGANIZATIONS IDENTIFIED IN

THE PWS AND BLOCK 14.

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

TRANSPONDER FOR TESTING

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS PARA 3.3

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ONCE

12. DATE OF FIRST

SUBMISSION

14DAC 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE TRANSPONDERS SHALL BE PROVIDED

WITHIN 14 CALENDAR DAYS AFTER CONTRACT AWARD DATE. ANY

ADDITIONAL PRODUCTS THAT REQUIRE TESTING DUE TO NEW

PRODUCT OR FAILED INITIAL TESTING WILL BE AT THE EXPENSE AND

SCHEDULE OF THE CONTRACTOR

BLOCK 14: THE CONTRACTOR SHALL PROVIDE NO MORE THAN TWO (2)

ACTIVIATED AND OPERATIONAL TRANSPONDERS FOR EACH CLIN THE

CONTRACTOR HAS BEEN AWARDED. THESE TRANSPONDERS WILL BE

SHIPPED DIRECTLY TO THE TESTING FACILITY PROVIDED BY THE

GOVERNMENT UPON AWARD.

TESTING FACILITY

0 2 0

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

N/A

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A010

2. TITLE OF DATA ITEM

TRANSPONDER DOCUMENTATION

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS PARA

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE TRANSPONDERS SHALL BE PROVIDED

WITHIN 14 CALENDAR DAYS AFTER CONTRACT AWARD DATE. ANY

ADDITIONAL PRODUCTS THAT REQUIRE TESTING DUE TO NEW

PRODUCT OR FAILED INITIAL TESTING WILL BE AT THE EXPENSE AND

SCHEDULE OF THE CONTRACTOR

BLOCK 14: CONTRACTOR FORMATTED. FILE(S) SHALL BE

DISSEMINATED VIA ELECTRONIC MEDIA TO INDIVIDUALS/

ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.

DOCUMENTS INCLUDED FOR THIS CDRL ARE ANY GOVERNMENT

REQUIRED TESTING CERTIFICAITONS/REPORTS, VERIFICATION FOR

CCP MEDIUM ROBUSTNESS LEVEL, AND VERIFICATION FOR DOD

UNIFIED CAPABILITILES (UC) APPROVED PRODUCT LIST (APL).

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

N/A

B. EXHIBIT

E

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

NGT-II

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Post Award

1. DATA ITEM NO.

A011

2. TITLE OF DATA ITEM

TRANSPONDER LABEL

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS PARA 4.3, 4.3.1

6. REQUIRING OFFICE

SFAE-PSA-LS

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ONCE

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16 14. DISTRIBUTION

8. APP CODE

A (See Block 16)

See BLK 16 11. AS OF DATE

12 JUN 2025

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

b. COPIES N/A

16. REMARKS a. ADDRESSEE DRAFT

FINAL

Reg Repro

BLOCK 8: THE DELIVERABLE IS SUBJECT TO GOVERNMENT REVIEW.

ANY CORRECTIONS REQUIRED AFTER GOVERNMENT REVIEW SHALL

BE COMPLETED WITHIN 5 WORKING DAYS OF RECEIPT OF

GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED

TO THE DOD AND DOD CONTRACTORS ONLY. REASON: TO PROTECT

TECHNICAL/OPERATIONAL DATA OR INFORMATION

BLOCKS 10, 12 AND 13: THE TRANSPONDERS SHALL BE PROVIDED

WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD DATE.

BLOCK 14: CONTRACTOR FORMAT, USG APPROVED. FILE SHALL BE

DISSEMINATED VIA ELECTRONIC MEDIA TO INDIVIDUALS/

ORGANIZATIONS IDENTIFIED IN THE PWS AND BLOCK 14.

Contract Data Requirements List (CDRLs) List

File details come from the government source that posted it. Updated .