Exhibit_A-_A121-2018_-Standard_Template.pdf

PDF 3 MB Posted

Attached to
Building Construction Contractors
Solicitation number
RFQ-54-2022
Issued by
Rutherford County, Newport City, Tennessee

About this file

This document is an AIA Document A121™–2018 Standard Form of Master Agreement between the City of Murfreesboro, Tennessee and a contractor for building construction services. The master agreement establishes a framework for multiple work orders to be issued over a one-year term, with automatic annual renewals unless either party provides 60 days' notice of non-renewal. The document outlines the general terms and conditions governing individual construction projects, including the contractor's responsibilities for work performance, safety, materials, labor, permits, and compliance with contract documents. The agreement is intended to be used in conjunction with specific Work Orders that will detail the scope, timeline, and compensation for individual projects.

The contract includes provisions for payment, with the Owner (City of Murfreesboro) making monthly progress payments based on completed work, subject to a 5% retainage until substantial completion and a 2% retainage until final payment. The agreement allows for potential liquidated damages of $500 per day for delays in substantial completion, with exceptions for unavoidable delays such as war, natural disasters, strikes, and other specified circumstances. The contractor is required to maintain various insurance coverages, including $1 million in commercial general liability, $1 million in automobile liability, and workers' compensation insurance. The contract also establishes procedures for dispute resolution, primarily through mediation and litigation in Rutherford County, Tennessee, with a mutual waiver of consequential damages.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document A121

– 2018 Standard Form of Master Agreement Between Owner and Contractor where Work is provided under multiple Work Orders

Init.

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

This document does not contain a description of the Contractor’s scope of Work or establish payment terms or the dates of commencement of the Work or Substantial Completion. This document is intended to be used in conjunction with AIA Document A221™–2018, Work Order for use with Master Agreement Between Owner and Contractor.

AGREEMENT made as of the day of in the year (In words, indicate day, month, and year.)

BETWEEN the Owner:

(Name, legal status, address, and other information)

City of Murfreesboro, Tennessee, a Tennessee municipal corporation 111 West Vine Street Murfreesboro, TN 37130 and the Contractor:

(Name, legal status, address, and other information)

The Owner and Contractor agree as follows.

mstrode Typewritten Text

EXHIBIT A

Init.

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530)

TABLE OF ARTICLES

1 MASTER AGREEMENT TERM AND PARTY REPRESENTATIVES

2 WORK ORDERS

3 PAYMENTS

4 DISPUTE RESOLUTION

5 GENERAL PROVISIONS

6 OWNER

7 CONTRACTOR

8 DESIGN PROFESSIONAL

9 SUBCONTRACTORS

10 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

11 CHANGES IN THE WORK

12 TIME

13 PAYMENTS AND COMPLETION

14 PROTECTION OF PERSONS AND PROPERTY

15 INSURANCE AND BONDS

16 CORRECTION OF WORK

17 MISCELLANEOUS PROVISIONS

18 TERMINATION

19 CLAIMS AND DISPUTES

20 SCOPE OF THIS MASTER AGREEMENT

ARTICLE 1 MASTER AGREEMENT TERM AND PARTY REPRESENTATIVES

§ 1.1 This Master Agreement shall be effective for one year after the date first written above ("Date of this Master Agreement").

§ 1.2 This Master Agreement shall apply to all Work Orders agreed to by the parties within the term of this Master Agreement until completion of the Work Order. In the event of a conflict between terms and conditions of this Master Agreement and a Work Order, the terms of the Work Order shall take precedence for the Work provided pursuant to the Work Order.

§ 1.3 This Master Agreement will renew on an annual basis, on the day and month of the Date of this Master Agreement, unless either party provides notice of their intent not to renew this Master Agreement. Notice must be provided at least 60 days prior to the renewal date. In the event either party elects not to renew this Master Agreement, the terms of this Master Agreement shall remain applicable until all Work Orders under this Master Agreement are completed or terminated.

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530)

§ 1.4 The Owner identifies the following representative authorized to act on the Owner’s behalf with respect to this Master Agreement:

Scott Elliott, Project Development Director City of Murfreesboro 111 West Vine Street Murfreesboro, TN 37130 gregmcknight@murfreesborotn.gov

(629) 219-6369

§ 1.4.1 In each Work Order, the Owner will identify a representative authorized to act on the Owner’s behalf with respect to the Work Order.

§ 1.5 The Contractor identifies the following representative authorized to act on the Contractor’s behalf with respect to this Master Agreement:

§ 1.5.1 In each Work Order, the Contractor will identify a representative authorized to act on behalf of the Contractor with respect to the Work Order.

§ 1.6 The Owner may retain a Design Professional or Engineer ("Design Professional") to perform certain services in connection with a specific Project, as enumerated in this Master Agreement and a particular Project’s Work Order. If a Design Professional is not required by law, or otherwise not engaged on a Project, the Owner shall perform such duties and services identified in this Master Agreement as being the responsibility of the Design Professional.

ARTICLE 2 WORK ORDERS

§ 2.1 The Owner is not required to issue any Work Orders under this Master Agreement.

§ 2.2 The Contractor may decline to accept any Work Order issued by the Owner.

§ 2.3 The Contractor shall execute the Work set forth in each agreed upon Work Order, consisting of AIA Document A221-2018, Work Order, or such other document as the Owner and Contractor may mutually agree upon. Each Work Order shall state the name, location, and detailed description of the Project; identify the Design Professional; state the Contract Time; state the Contract Sum; describe the Work; and enumerate the Contract Documents.

§ 2.4 The Owner shall make the Contract Documents available to the Contractor prior to execution of the Work Order, and thereafter, upon request. The Owner may charge the Contractor for the reasonable cost to reproduce the Contract Documents provided to the Contractor.

ARTICLE 3 PAYMENTS

§ 3.1 Contract Sum and Progress Payments § 3.1.1 Each Work Order shall include a Contract Sum. The Owner shall pay the Contractor the Contract Sum in current funds in accordance with each individual Contract. Where the Contract Sum is based on the Cost of the Work under Section 3.3 or 3.4 of the Work Order, the Cost of the Work is defined in Exhibit A, Determination of the Cost of the Work.

§ 3.1.2 Applications for Payment will be submitted individually for each Contract.

§ 3.1.3 Based upon Applications for Payment for individual Contracts submitted to the Design Professional by the Contractor, and Certificates for Payment issued by the Design Professional, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530)

§ 3.1.4 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as set forth in the Work Order.

§ 3.1.5 Provided that an Application for Payment is received by the Design Professional not later than the 5th day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the 30th day of the following month. If an Application for Payment is received by the Design Professional after the date fixed above, payment shall be made by the Owner not later than sixty ( 60 ) days after the Design Professional receives the Application for Payment.

(Federal, state or local laws may require payment within a certain period of time.)

§ 3.1.6 For each progress payment made prior to final payment, the Owner may withhold retainage from the payment otherwise due as follows:

(Insert a percentage or amount to be withheld as retainage from each Application for Payment and any terms for reduction of retainage during the course of the Work. The amount of retainage may be limited by governing law.)

Five percent (5%) until acceptance of a Certificate of Substantial Completion, and thereafter two percent (2%) until final payment.

§ 3.1.7 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.

(Insert rate of interest agreed upon, if any.)

6 % per year

§ 3.2 Final Payment § 3.2.1 Final payment for individual Contracts, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when

.1 the Contractor has fully performed the Work except for the Contractor’s responsibility to correct Work as provided in Section 16.2, and to satisfy other requirements, if any, which extend beyond final payment;

.2 the Contractor has submitted a final accounting for the Cost of the Work, where payment is on the basis of the Cost of the Work with or without a Guaranteed Maximum Price; and

.3 a final Certificate for Payment has been issued by the Design Professional in accordance with Section 13.7.1.

§ 3.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Design Professional’s final Certificate for Payment, or as follows:

ARTICLE 4 DISPUTE RESOLUTION

§ 4.1 Binding Dispute Resolution For any claim subject to, but not resolved by, mediation pursuant to Section 19.5, the method of binding dispute resolution shall be as follows:

(Check the appropriate box.)

[ X ] Arbitration pursuant to Section 19.6 of this Master Agreement

[ ] Litigation in a court of competent jurisdiction

[ ] Other: (Specify)

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530)

If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, claims will be resolved in a court of competent jurisdiction

ARTICLE 5 GENERAL PROVISIONS

§ 5.1 The Work The term "Work" means the construction and services required by the Contract Documents enumerated in a Work Order, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations under the Work Order and related Contract. The Work may constitute the whole or a part of the Project identified in a particular Work Order.

§ 5.1.1 Specifications may describe types and quantities of materials, equipment, and other items of the Work and methods of installation that cannot be easily shown on the Drawings. It is not intended that the Specifications will mention every item of Work that can be adequately shown on the Drawings nor is it intended that the Drawings will show all items of Work adequately described or required by the Specifications, even if it is the case that such Work could have been shown thereon.

§ 5.1.2 Prior to the inspections for Substantial Completion and Final Completion, as applicable, the Contractor shall clean exterior and interior surfaces exposed to view; remove temporary labels, stains, putty, soil, paint and foreign substances from all surfaces, including glass and painted surfaces; polish transparent and glossy surfaces; clean equipment and fixtures to a sanitary condition; replace air filters in mechanical equipment; clean roofs, gutters, and downspouts; remove obstructions and flush debris from drainage systems; clean site; sweep paved areas and rake clean other surfaces; remove trash and surplus materials from the site: clean and polish all floors: clean and polish all hardware; and repair all Work damaged during cleaning.

§ 5.2 The Contract Documents

§ 5.2.1 The Contract Documents are enumerated in each Work Order and consist of this Master Agreement; the Work Order executed by the Owner and Contractor (including, if applicable, Supplementary and other Conditions applicable to the Work Order); all Drawings, Specifications, and Addenda issued in connection with the Work Order; other documents listed in the Work Order; and Modifications issued after execution of the Work Order. A Modification is

(1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Design Professional.

§ 5.2.2 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.

§ 5.2.3 In the event there are conflicts or discrepancies among the Contract Documents, interpretations will be based on the following priorities:

.1 Amendments to a Work Order or this Master Agreement, with those of later date having precedence over those of earlier date .2 The Work Order .3 This Master Agreement;

.4 Addenda, with those of later date having precedence over those of earlier date.

.5 Division 1 of the Specifications, if any .6 Drawings and Specifications .7 Other documents specifically enumerated in the Master Agreement or Work Order as part of the

Contract Documents.

.8 In the case of any conflicts or discrepancies between Drawings and Specifications or within or among the Contract Documents and not clarified by Addendum, the better quality or greater quantity of Work shall be provided in accordance with the Design Professional’s interpretation.

§ 5.3 The Contract The Contract Documents for each Work Order form a separate Contract for construction of the Work ("The Contract"). The Contract represents the entire and integrated agreement between the parties hereto for construction of

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530) the Work and supersedes prior negotiations, representations or agreements, either written or oral. A Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind between any persons or entities other than the Owner and the Contractor.

§ 5.4 Instruments of Service Instruments of Service are representations, in any medium of expression now known or later developed, of the tangible and intangible creative work performed by the Design Professional and the Design Professional’s consultants under their respective professional services agreements. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, digital models, and other similar materials.

§ 5.5 Ownership and Use of Drawings, Specifications and Other Instruments of Service § 5.5.1 The Instruments of Service, including Drawings and Specifications, prepared by the Design Professional and the Design Professional’s consultants are for use solely with respect to the Project identified in a specific Work Order.

The Contractor, subcontractors, sub-subcontractors, materialmen, and equipment suppliers are authorized to use and reproduce solely and exclusively for execution of th Work. The Design Professional’s drawings, specifications, and other Instruments of Service may not be used for other projects.

§ 5.5.2 The Design Professional and the Design Professional’s consultants shall be deemed the authors and owners of their respective Instruments of Service including the Drawings and Specifications, and will retain all common law, statutory and other reserved rights in their Instruments of Service, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and suppliers shall not own or claim a copyright in the Instruments of Service.

Submittal or distribution to meet official regulatory requirements or for other purposes in connection with the Project is not to be construed as publication in derogation of the Design Professional’s or Design Professional’s consultants’ reserved rights.

§ 5.5.3 The Contractor, Subcontractors, Sub-subcontractors and suppliers are authorized to use and reproduce the Instruments of Service provided to them, subject to the protocols established pursuant to Sections 5.6 and 5.7, solely and exclusively for execution of the Work. All copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service. The Contractor, Subcontractors, Sub-subcontractors, and suppliers may not use the Instruments of Service on other projects or for additions to a Project outside the scope of a Contract without the specific written consent of the Owner, Design Professional and the Design Professional’s consultants.

§ 5.6 Digital Data Use and Transmission The parties shall agree upon protocols governing the transmission and use of Instruments of Service or any other information or documentation in digital form. The parties will use AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, to establish the protocols for the development, use, transmission, and exchange of digital data.

§ 5.7 Building Information Models Use and Reliance Any use of, or reliance on, all or a portion of a building information model without agreement to protocols governing the use of, and reliance on, the information contained in the model and without having those protocols set forth in AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, and the requisite AIA Document G202™–2013, Project Building Information Modeling Protocol Form, shall be at the using or relying party’s sole risk and without liability to the other party and its contractors or consultants, the authors of, or contributors to, the building information model, and each of their agents and employees.

§ 5.8 Severability The invalidity of any provision of the Contract Documents shall not invalidate the Contract or its remaining provisions. If it is determined that any provision of the Contract Documents violates any law, or is otherwise invalid or unenforceable, then that provision shall be revised to the extent necessary to make that provision legal and enforceable. In such case the Contract Documents shall be construed, to the fullest extent permitted by law, to give effect to the parties’ intentions and purposes in executing the Contract.

§ 5.9 Notice § 5.9.1 Except as otherwise provided in Section 5.9.2, where the Contract Documents require one party to notify or give notice to the other party, such notice shall be provided in writing to the designated representative of the party to whom the notice is addressed and shall be deemed to have been duly served if delivered in person, by mail, by courier, AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530) or by electronic transmission in accordance with AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, if completed, or as otherwise set forth below:

(If other than in accordance with AIA Document E203–2013, insert requirements for delivering Notice in electronic format such as name, title and email address of the recipient and whether and how the system will be required to generate a read receipt for the transmission.)

§ 5.9.2 Notice of Claims shall be provided in writing and shall be deemed to have been duly served only if delivered to the designated representative of the party to whom the notice is addressed by certified or registered mail, or by courier providing proof of delivery.

§ 5.10 Relationship of the Parties Where the Contract is based on the Cost of the Work plus the Contractor’s Fee, with or without a Guaranteed Maximum Price, the Contractor accepts the relationship of trust and confidence established by this Master Agreement and covenants with the Owner to cooperate with the Design Professional and exercise the Contractor’s skill and judgment in furthering the interests of the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner’s interests. The Owner agrees to furnish and approve, in a timely manner, information required by the Contractor and to make payments to the Contractor in accordance with the requirements of the Contract Documents.

ARTICLE 6 OWNER

§ 6.1 Information and Services Required of the Owner § 6.1.1 Prior to commencement of the Work, at the written request by the Contractor, the Owner shall furnish to the Contractor reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Contract. The Contractor shall have no obligation to commence the Work until the Owner provides such evidence. If commencement of the Work is delayed under this Section 6.1.1, the Contract Time shall be extended appropriately.

§ 6.1.2 The Owner shall furnish all necessary surveys and a legal description of sites referenced in a Work Order.

§ 6.1.3 The Contractor shall be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work.

§ 6.1.4 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents, including those required under Section 7.6.1, the Owner shall secure and pay for other necessary approvals, easements, assessments and charges required for the construction, use or occupancy of permanent structures or for permanent changes in existing facilities. If the Contractor’s bid includes fees that the Owner has paid, or is required to pay directly, or that the Owner may waive, the Contractor shall, at the Owner’s option, either pay these fees as a part of their bid or deduct fees from Contract Sum as a deductive change order.

§ 6.1.5 The Owner will a digital copy in .pdf format or furnish six (6) copies of the Contract Documents to the Contractor. The Contractor may purchase additional copies of the Contract Documents at the cost of reproduction, postage, and handling.

§ 6.2 Owner’s Right to Stop the Work If the Contractor fails to correct Work which is not in accordance with the Contract Documents, or is in default of its material obligations under the Contract Documents, the Owner may direct the Contractor in writing to stop the Work until the correction is made or default is cured, for which there will be no Change Order extending the Contract Time or the Contract Sum.

§ 6.3 Owner’s Right to Carry Out the Work If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents, and fails within a ten-day period after receipt of notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may, without prejudice to any other remedies the Owner may have, correct such default or neglect. Such action by the Owner and amounts charged to the Contractor are both subject to

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530) prior approval of the Design Professional and the Design Professional may, pursuant to Section 13.4.3, withhold or nullify a Certificate for Payment in whole or in part, to the extent reasonably necessary to reimburse the Owner for the reasonable cost of correcting such deficiencies, including the Owner’s expenses and compensation for the Design Professional’s additional services made necessary by such default, neglect, or failure. In addition, if payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner immediately upon the Owner’s written demand. If the Contractor disagrees with the actions of the Owner or the Design Professional, or the amounts claimed as costs to the Owner, the Contractor may file a Claim pursuant to Article 19.

ARTICLE 7 CONTRACTOR

§ 7.1 Review of Contract Documents and Field Conditions by Contractor § 7.1.1 Execution of a Work Order by the Contractor is a representation that the Contractor has visited the relevant site, become generally familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents.

§ 7.1.2 Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the Work, carefully study and compare the various Contract Documents relative to that portion of the Work, as well as the information furnished by the Owner pursuant to Section 6.1.2, shall take field measurements of any existing conditions related to that portion of the Work and shall observe any conditions at the site affecting it. These obligations are for the purpose of facilitating coordination and construction by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor shall promptly report to the Design Professional any errors, inconsistencies, or omissions discovered by or made known to the Contractor as a request for information in such form as the Design Professional may require. Such reports shall also be made simultaneously and directly to the Owner. It is recognized that the Contractor’s review is made in the Contractor’s capacity as a contractor and not as a licensed design professional unless otherwise specifically provided in the Contract Documents.

§ 7.1.3 The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor shall promptly report to the Design Professional any nonconformity discovered by or made known to the Contractor as a request for information in such form as the Design Professional may require.

§ 7.1.4 The Contractor represents and warrants the following to the Owner (in addition to the other representations and warranties contained in the Contract Documents), as an inducement to the Owner to execute this Contract, which representations and warranties shall survive the execution and delivery of the Contract and the Final Completion of the Work:

.1 That the Contractor is financially solvent, able to pay its debts as they mature, and possessed of sufficient working capital to complete the Work and perform its obligations under the Contract Documents;

.2 That the Contractor is able to furnish the tools, materials, supplies, equipment and labor required to timely complete the Work and perform its obligations hereunder and has sufficient experience and competence to do so;

.3 That the Contractor is authorized to do business in the State where the Project is located and properly licensed by all necessary governmental authorities having jurisdiction over it, the Work, or the site of the Project; and

.4 That the execution of the Contract and its performance thereof are within the duly-authorized powers of the Contractor and the signatory on behalf of the Contractor.

§ 8.1.4 Contractor shall be responsible for ascertaining correct dimensions, and Contractor is not to ascertain dimensions simply by scaling drawings unless directed to do so by the Design Professional. In case of any discrepancy between Drawings and Specifications, Contractor shall consult Design Professional promptly for an interpretation before proceeding with the Work.

§ 8.1.5 The Owner is entitled to reimbursement from the Contractor, which are in addition to any Liquidated Damages, for amounts paid to the Design Professional for evaluating and responding to (i) the Contractor’s requests for information that are not prepared in accordance with the Contract Documents; (2) where the requested information is

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530) available to the Contractor from a careful study and comparison of the Contract Documents, field conditions, other Owner-provided information, Contractor-prepared coordination drawings, or prior Project correspondence or documentation; or (3) Owner incurs additional project management costs.

§ 7.2 Supervision and Construction Procedures § 7.2.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work under a Contract, unless the Contract Documents give other specific instructions concerning these matters.

§ 7.2.2 The Contractor shall layout new construction lines and verify slab slope and conditions. If discrepancies between actual lines and elevations and those indicated on plans exist, notify Design Professional and obtain a decision before starting work.

§ 7.2.3 The Contractor shall establish and maintain reference points required for the work. The Contractor shall lay out on the rough floor the exact locations of partitions, openings, etc. as a guide to all trades. The Contractor shall verify elevations, lines, levels, and dimensions indicated on the drawings before commencing work.

§ 7.2.4 The Contractor shall be responsible to the Owner for the acts and omissions of all his employees and all Subcontractors, their agents and employees, and all other persons performing any of the Work under a contract with the Contractor.

§ 7.2.5 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor’s employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work.

§ 7.3 Labor and Materials § 7.3.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.

§ 7.3.2 The Contractor shall enforce strict discipline and good order among the Contractor’s employees and other persons carrying out the Work. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them.

§ 7.3.3 The Contractor may make a substitution only with the consent of the Owner, after evaluation by the Design Professional and in accordance with a Modification.

§ 7.4.3 Contractor agrees to keep the Project free and clear from all mechanic’s liens, materialmen liens, and other liens. The Contractor shall discharge any such lien immediately but in no event more than 30 days after filing of such a lien. In the event such lien is not released or discharged within such 30 days period, the Owner shall have the right to pay all sums necessary to discharge such liens and the Owner shall have the right to deduct such amounts from any amounts due hereunder or demand immediate payment from the Contractor. In the event of any such deduction, the Contract Sum due under the Contract Documents automatically shall be reduced by the amount of such payment without the need for any Change Order. In no instance shall this provision affect any limitation or restriction imposed by law or regulation on the placement or enforcement of liens.

§ 7.4.4 Substitutions:

.1 Where materials, equipment, apparatus, or other products are specified by manufacturer, brand name, type or catalog number, such designation shall establish standards of quality and style desired. Any reasonable request for substitution will be considered, if in the opinion of the Design Professional such materials are equal to the material specified and entirely satisfactory for use in the project. The Design Professional shall be the sole judge of acceptability of substitution.

. 2 The Design Professional will consider a formal request for the substitution of products in place of those specified only under the conditions set forth in the General Requirements (Division 1 of the Specifications) ten (1 0) days prior to bid date. By making requests for substitutions, the Contractor:

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530)

A. Represents that it has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified;

B. Represents that it will provide the same warranty for the substitution as it would for the product specified;

C. Certifies that the cost data presented is complete and includes all related costs for the substituted product and for Work that must be changed as a result of the substitution except for the Design Professional’s redesign costs, and waives all claims for additional costs related to the substitution that subsequently become apparent; and

D. Shall coordinate the installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects. .

.3 When a material, equipment or system is specified by the name of one or more manufacturers, such material, equipment, or system shall form the basis of the Contract. If the Contractor desires to make a substitution, Contractor shall comply with Specification Sections 01 25 13 and 00 43 25.

.4 The Owner shall be entitled to reimbursement from the Contractor for amounts the owner pays to the Design Professional for reviewing the Contractor proposed substitutions and making agreed-upon changes in the Drawings and Specifications resulting from such substitutions.

§ 8.4.5 The use of undocumented workers is not permitted.

§ 8.4.6 The Contractor shall have the Subcontractor who installs them, correct defects in bases, surfaces, or substrates on which finishing materials are to be applied, construction is to be added, or equipment is to be mounted.

§ 8.4.7 The Contractor shall disclose the existence and extent of any financial interest, whether direct or indirect, he has in subcontractors or material suppliers which he may propose for this project.

§ 7.4 Warranty § 7.4.1 The Contractor warrants to the Owner and Design Professional that: (1) materials and equipment furnished under the Contract will be new and of good quality unless otherwise required or permitted by the Contract Documents;

(2) the Work will be free from defects not inherent in the quality required or permitted; and (3) the Work will conform to the requirements of the contract documents. The warranty provided in this Section shall be in addition to and not in limitation of any other warranty, including, manufacturer or supplier warranties, or remedy required by law or by the Contract Documents, and notwithstanding anything to the contrary contained in the Contract Documents. This warranty commences upon Final Completion. The Contractor shall promptly repair and replace, at the Contractor’s sole cost and expense, any materials, equipment, or Work covered by and violating the warranty. All warranty work shall be coordinated with the Owner in order to limit the disruption of operation and completed Project. All such warranty work shall be completed in compliance with the terms and conditions of the Contract Documents.

§ 7.4.2 Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. The Contractor’s warranty excludes remedy for damage or defect caused by abuse of Owner or Owner’s invitees, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the Design Professional, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.

§ 7.4.3 Any material or equipment warranties required by the Contract Documents shall be issued in the name of the Owner, or shall be transferrable to the Owner, and shall commence in accordance with Section 13.6.3.

§ 7.5 Taxes The Contractor shall pay all taxes, levies duties, and assessments of any nature that are applicable to any Work under an individual Contract. The Contract Sum and any agreed variations thereof shall include all taxes by law. The Contractor shall make any and all payroll deductions required by law. The Contractor herein indemnifies and holds the Owner harmless from any liability on account of any and all such taxes, levies, duties, assessments, and deductions.

§ 7.6 Permits, Fees, Notices, and Compliance with Laws § 7.6.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit as well as other permits, fees, licenses and inspections by government agencies necessary for proper execution

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530) and completion of the Work that are customarily secured after execution of a Contract and legally required at the time bids are received or negotiations concluded.

§ 7.6.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to performance of the Work. If the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction.

§ 7.7 Allowances The Contractor shall include in the Contract Sum for each Work Order all allowances stated in the Contract Documents for that Work Order. The Owner shall select materials and equipment under allowances with reasonable promptness. Allowance amounts shall include the costs to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts. Contractor’s costs for unloading and handling at the site, labor, installation, overhead, profit, and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowance.

§ 7.8 Contractor’s Construction Schedules § 7.8.1 The Contractor, promptly after executing a Work Order, shall submit for the Owner’s and Design Professional’s information a Contractor’s construction schedule for the Work described in that Work Order. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

§ 7.8.2 The Contractor must maintain an updated project schedule and shall perform the Work in general accordance with the most recent schedule submitted to the Owner and Design Professional. If milestones are negatively impacted, the Contractor must, prior to submission of the next application for payment, provide Owner and Design Professional with a specific plan to return the Project to the project schedule.

§ 7.9 Submittals § 7.9.1 The Contractor shall review for compliance with the Contract Documents and submit to the Design Professional Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents in coordination with the Contractor’s construction schedule and in such sequence as to allow the Design Professional reasonable time for review. By submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to the Owner and Design Professional that the Contractor has (1) reviewed and approved them;

(2) determined and verified materials, field measurements, and field construction criteria related thereto, or will do so;

and (3) checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. The Work shall be in accordance with approved submittals. Neither the Design Professional nor the Owner shall be responsible for correctness of dimensions shown on shop drawings or submittals.

The Design Professional’s review of Contractor’s submittals will be limited to general conformance with the project scope, finish selection, and examination of an initial submittal and one (1) resubmittal. The Owner is entitled to obtain reimbursement from the Contractor for amounts paid to the Design Professional for evaluation of additional submittals.

§ 7.9.2 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents.

§ 7.9.3 The Contractor shall not be required to provide professional services that constitute the practice of architecture or engineering unless such services are specifically required by the Contract Documents or unless the Contractor needs to provide such services in order to carry out the Contractor’s own responsibilities. If professional design services or certifications by a design professional are specifically required, the Owner and the Design Professional will specify the performance and design criteria that such services must satisfy. The Contractor shall cause such services or certifications to be provided by an appropriately licensed design professional. If no criteria are specified, the design shall comply with applicable codes and ordinances. Each Party shall be entitled to rely upon the information provided by the other Party. The Design Professional will review and approve or take other appropriate action on submittals for the limited purpose of checking for conformance with information provided and the design concept expressed in the Contract Documents. The Design Professional’s review of Shop Drawings, Product Data, Samples, and similar submittals shall be for the limited purpose of checking for conformance with information given and the design concept

AIA Document A121™ – 2 018 . Copyright © 2014 and 2018 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:35:54 ET on 06/16/2022 under Order No.3104236655 which expires on 02/12/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1483560530) expressed in the Contract Documents. In performing such review, the Design Professional will approve, or take other appropriate action upon, the Contractor’s Shop Drawings, Product Data, Samples, and similar submittals.

§ 7.10 Use of Site The Contractor shall confine operations at the site(s) to areas permitted by applicable laws, statutes, ordinances, codes, rules and regulations, lawful orders of public authorities, and the Contract Documents and shall not unreasonably encumber the site(s) with materials or equipment.

§ 7.11 Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

§ 7.12 Cleaning Up The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under a Contract. At completion of the Work, the Contractor shall remove waste materials, rubbish, the Contractor’s tools, construction equipment, machinery and surplus material from and about the Project. If the Contractor fails to clean-up as provided in the Contract Documents, the Owner may do so, and the cost thereof shall be charged to the Contractor and deducted from the remaining. No on-site burning of trash is allowed.

§ 7.13 Access to Work The Contractor shall provide the Owner and Design Professional access to the Work in preparation and progress wherever located.

§ 7.14 Royalties, Patents and Copyrights The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and Design Professional harmless from loss on account thereof, but shall not be responsible for defense or loss when a particular design, process, or product of a particular manufacturer or manufacturers is required by the Contract Documents or where the copyright violations are contained in Drawings, Specifications or other…