EXHIBIT 9 CAN CLNG TABLES A1-A4.pdf
PDF 250 KB Posted
- Attached to
- Canton Lake, Cleaning Services Federal contract opportunity
- Solicitation number
- W912BV23Q0015
About this file
This document contains information regarding a forthcoming solicitation for cleaning services at Canton Lake in Blaine County, Oklahoma. The U.S. Army Corps of Engineers, Southwestern Division and Tulsa District will issue solicitation number W912BV23Q0015 on or around January 4, 2023 seeking proposals for janitorial and park cleaning services at Canton Lake on a firm-fixed-price basis. The contract will have a one year base period and a one year option to extend and will be set aside for small businesses with a NAICS code of 561720 and size standard of $19.5 million. Proposals will be due around February 6, 2023 and award is expected on or around March 24, 2023. The site visit will take place on January 5, 2023 at 10:00 AM at the Canton Lake Project Office. This represents a new requirement as there is no incumbent or previous contract value stated. Questions must be submitted through the bidder inquiry system by January 30, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pricing Schedule - 23Q0015 - CANL-CLEANING.xlsx | XLSX spreadsheet | |
| EXHIBIT 5 Activity Hazard Analysis Form (1).pdf | ||
| EXHIBIT 8 CAN CLNG MAPS.pdf | ||
| SOL - W912BV23Q0015 - CANL-CLEANING.pdf | ||
| EXHIBIT 3 SWT Form 982 - Quality Assurance Report.pdf | ||
| EXHIBIT 7 CAN CLNG INVOICE.pdf | ||
| EXHIBIT 6 WORK SCHEDULE FOR CLEANING.pdf | ||
| EXHIBIT 4 SWT Form 990 - Quality Control Inspection Log.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE A-1
REQUIRED FREQUENCY OF SERVICES
WINTER PERIOD
REQUIRED FREQUENCY OF SERVICE BY AREA
R
EQ
U
IR
ED
S
ER
VI
CE
WINTER PERIOD Project Office Maintenance
Shop Restroom Overlook
Interior/Office Space Schedule S&W S&W
Number of Facilities 1 1
Exterior of Building Schedule Semi-annually Semi-annually
Number of Facilities 1 1
Toilet (WB) & Shower Faculties
Schedule S&W S&W S&W
Number of Facilities 4 1 2
Refuse Collection Schedule S&W S&W S&W
Number of Facilities 1 1 1
Bulletin Boards Schedule S&W
Number of Facilities 1
Groundskeeping Schedule S&W S&W S&W
Number of Facilities 1 1 1
Groundskeeping Park and Access Roads
Schedule S&W S&W S&W
Number of Facilities 1 1 1
Parking Areas Schedule S&W S&W S&W
Number of Facilities 1 1 1
AREA Project Office and Maintenance Shop Restroom Unit of Measure Size Interior Heated Areas with Carpeted Floors SF 2,146
Interior Heated Areas with Ceramic Tile Floors SF 1,724 (18’x12’ area rug (216 SF) on floor) SF 216
Hall Rugs 63’x3’ SF 189 Restrooms (5) SF 258
Sidewalks LF 225 Exterior Areas (surfaced) AC 0.06 Exterior Areas (grounds) AC 0.25
Refuse Containers NO 12 AREA Overlook Unit of Measure Size
Interior Heated Areas with Stained Concrete Floor SF 323 Interior Heated Areas with Vinyl Tile Floors SF 300
(10’x12’ area rug (120 SF) on floor) SF 120 Restrooms (2) SF 316
Sidewalks LF 775 Exterior Areas (surfaced) AC 0.02 Exterior Areas (grounds) AC 0.36
Refuse Containers NO 4
FA
C
IL
IT
IE
S
FA
C
IL
IT
IE
S
TABLE A-2
FACILITIES INVENTORY
WINTER PERIOD
Amphitheater Big Bend Blaine Park Canadian Park Cemetery Dam Embankment Fairview Park Longdale Park Project Office Maintenance Shop Restroom Overlook Riverside Park Sandy Cove Park Thunder Road
Schedule S&W S&W
Number of Faclities 1 2
Schedule SEMI-ANNUALLY SEMI-ANNUALLY
Number of Faclities 1 1
Schedule S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S&W S&W S M T W TH F SA S M T W TH F SA
Number of Faclities 6 2 6 1 4 4 1 2 3
Schedule F 3 TIMES/WEEK 3 TIMES/WEEK 3 TIMES/WEEK 3 TIMES/WEEK 3 TIMES/WEEK
Number of Faclities 1 1 3 1 1 1
Schedule M M M M M M
Number of Faclities 123 13 138 1 41 51
Schedule S M T W TH F SA S M T W TH F SA
Number of Faclities 1 2
Schedule T&F S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S&W S&W S M T W TH F SA S M T W TH F SA S M T W TH F SA
Number of Faclities 3 6 6 8 4 4 12 1 4 6 4
Schedule 3 TIMES/WEEK 3 TIMES/WEEK 3 TIMES/WEEK
Number of Faclities 2 2 1
Schedule SEMI-MONTHLY SEMI-MONTHLY SEMI-MONTHLY SEMI-MONTHLY SEMI-MONTHLY
Number of Faclities 3 4 1 1 1
Schedule S T F SA S M T W TH F SA T&F M&TH S&W S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA
Number of Faclities 1 2 1 1 1 1 1 1
Schedule S M T W TH F SA S M T W TH F SA
Number of Faclities 3 3
Schedule S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA S&W S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA
Number of Faclities 2 1 2 1 1 1 1 1 1 2 1
Schedule BI-WEEKLY BI-WEEKLY
Number of Faclities 1 1
Schedule T&TH
Number of Faclities 1
Schedule T&TH T&TH T&TH T&TH
Number of Faclities 2 1 1 1
Schedule S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA T&F S M T W TH F SA S M T W TH F SA S M T W TH F SA S&W S M T W TH F SA S M T W TH F SA S M T W TH F SA S M T W TH F SA
Number of Faclities 4 3 8 1 3 1 4 1 1 1 2 2
Schedule 3 TIMES/WEEK 3 TIMES/WEEK 3 TIMES/WEEK
Number of Faclities 4 3 1
Refuse Collections
Courtesy Docks
Bulletin Boards
Groundskeeping
Interior/Office Spaces
Exterior of Building
Toilet (WB & Vault) & Shower Facilities
Group Shelters/Facilities
Picnic & Camping Sites
Trailer Dump Stations
REQUIRED FREQUENCY OF SERVICE BY AREA
R
EQ
U
IR
ED
S
ER
VI
C
E
Groundskeeping - Trails and Disc
Golf Course
Swimming Beaches
Playgrounds
Parking Areas
Boat Launching Areas
Groundskeeping Fishing Areas
Groundskeeping Park & Access
Roads
TABLE A-3
REQUIRED FREQUENCY OF
SERVICES
SUMMER PERIOD
UNIT BB BP CP DE FP LP PO MS OL RP SC TR TOTAL
Interior/Office Spaces NO 1 1 2
Exterior Building NO 1 1 2
Masonry Waterborne Toilets NO 4 2 6
Masonry Waterborne Toilets W/Shower NO 2 1 3
Wooden Waterborne Toilets W/Shower NO 2 1 3
Masonry Vault Toilets NO 2 2 4 8
Masonry Change houses NO 1 1
Metal/Wood Vault Toilets NO 2 2 1 1 1 7
Picnic & Table Group Shelters NO 1 3 1 1 1 7
Picnic & Camping Sites NO 123 13 138 1 41 51 367
Trailer Dump Stations NO 1 2 3
Bulletin Boards NO 3 4 1 1 9
Courtesy Docks NO 2 2 1 5
Grounds - Parks & Access Roads NO 2 1 2 1 1 1 1 1 2 2 1 15
Grounds – Nature/Hiking Trails AC 1.5 3.5 5
Grounds - Fishing Areas NO 3 3 6
Grounds – Embankment AC 8 8
Grounds – Interment Cemetery AC 2.8 2.8
Boat Launching Ramps NO 4 3 1 8
Swimming Beaches NO 1 1
Playgrounds NO 2 1 1 1 1 6
Amphitheater AC 1.5 1.5
Parking Areas NO 4 3 8 3 1 4 1 1 1 1 2 2 31
Refuse Containers-Dumpsters** NO 11 1 9 2 1 6 30
Refuse Containers-Cans*** NO 3 6 7 3 4 4 12 1 4 4 48
AREASFACILITIES
TABLE A-4
FACILITIES INVENTORY
SUMMER PERIOD
NO = Number AC = Acre MI = Miles
BB Big Bend Park FP Fairview Park OL Overlook BP Blaine Park LP Longdale Park RP Riverside Park CP Canadian Park PO Project Office SC Sandy Cove Park DE Dam Embankment MS Maintenance Shop Restroom TR Thunder Road
* Acronyms for Areas are as follows:
** Dumpsters are provided by others. Numbers could change depending on size provided.
*** Refuse container cans are Government-furnished, and number is subject to change depending upon need.
Note: The unit shown for toilets & change houses is the number of buildings. Wood/metal vault toilets include a male or female unit in each building. All other toilets contain a male and female in each building.
| TABLE A-1 REQUIRED FREQUENCY OF SERVICES WINTER |
| TABLE A-2 FACILITIES INVENTORY WINTER |
| Sheet2 |
| TABLE A-3 REQUIRED FREQUENCY OF SERVICES SUMMER |
| Sheet1 |
| TABLE A-4 FACILITIES INVENTORY SUMMER |
| Sheet1 |
File details come from the government source that posted it. Updated .