Exhibit 8 - Relationship Matrix.pdf

PDF 23 KB Posted

Attached to
911 Fed Bldg Structural Systems, ABAAS Upgrades & NOAA TI Space Build-Out Federal contract opportunity
Solicitation number
EQ10PCP-20-0010
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This federal solicitation requests design-build proposals for structural upgrades, ABA accessibility compliance work, and tenant improvement projects at the 911 Federal Building in Portland, Oregon. The scope of work includes seismic and non-seismic structural upgrades throughout the fully occupied building, ADA compliance updates where impacted by structural work, and renovating space on the second floor for the relocation of NOAA Fisheries headquarters from a leased location as well as for a congressional office relocation. Proposals will be evaluated in two phases, with the most qualified three offerors selected to submit detailed price proposals. The contract is to be awarded using competitive negotiation procedures. Substantial completion of the NOAA tenant improvements is required by October 15, 2022. The solicitation sets minimum qualification and evaluation requirements for Phase 1 and Phase 2 proposals in response to this opportunity from the General Services Administration.

View the file

Other files for this federal contract opportunity

Other files attached to 911 Fed Bldg Structural Systems, ABAAS Upgrades & NOAA TI Space Build-Out, newest first.
File Type Posted
Amd 01 - 911 Seismic-NOAA TI - QA 10.17.20.docx DOCX document
Amd 01 - 911 Seismic-NOAA TI - Phase I RFQ 10.17.20.docx DOCX document
Amd 01 - 911 Seismic NOAA TI - SF30 10.17.20.pdf PDF
911 Seismic - NOAA TI Agreement 9.30.20.docx DOCX document
Exhibit 10 - DBA Gen Decision OR20190029 (Mod 10) - 9.25.20.pdf PDF
911 Seismic - NOAA TI - Phase I RFQ 9.30.20.docx DOCX document
Exhibit 6 - Reps and Certs 9.30.20 .docx DOCX document
Exhibit 9 - SF1442.pdf PDF
Exhibit 1 - 911 FB Seismic-NOAA TI DB SOW 7.8.20.docx DOCX document
Exhibit 5 - GACA - GSA Affiliated Customer Accounts May 2014.docx DOCX document
Exhibit 7 - Key Personnel Resume Format.docx DOCX document
Exhibit 0 - SBU Document.docx DOCX document
Exhibit 2 - Pre-Proposal Conference Job Walk (Phase 2).docx DOCX document
Exhibit 4 - Performance Evaluation Survey - Commercial Client.docx DOCX document
Exhibit 3 - Project Experience.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name, Date Bldg Size & Type (New/Exist)

Brief Description

City & State GSA Contact

Title and Phone

Name & Role of Persons(s) Assigned to Project by Firm (identify any sub-consultants)

(Enter “X” if by own firm, “S” if by sub-consultant)

C on st ru ct io n P

M

G

S up er in te nd en t

C Q

C S

D es ig n

P

Le ad

A rc hi te ct

E ng in ee r

H is to ric on su lta nt

Inter-relationship Matrix

3. Draft DB Agreement_FOB Ext.pdf
(1) FAR 52.222-99 Establishing a Minimum Wage for Contractor (JUL 2014) (DEVIATION)
(2) FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
(3) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 08)
1e.Exhibit 4_Interrelationship Matrix_FOB Ext.pdf
Exhibit 4 – Inter-relationship Matrix
1b. Exhibit 1B_Designer Proj Exp.PP Eval.pdf
Project Title
Work Performed Expressed as a Percentage (%) of the Total Project Scope

File details come from the government source that posted it. Updated .