Exhibit 8 - Relationship Matrix.pdf
PDF 23 KB Posted
- Solicitation number
- EQ10PCP-20-0010
About this file
This federal solicitation requests design-build proposals for structural upgrades, ABA accessibility compliance work, and tenant improvement projects at the 911 Federal Building in Portland, Oregon. The scope of work includes seismic and non-seismic structural upgrades throughout the fully occupied building, ADA compliance updates where impacted by structural work, and renovating space on the second floor for the relocation of NOAA Fisheries headquarters from a leased location as well as for a congressional office relocation. Proposals will be evaluated in two phases, with the most qualified three offerors selected to submit detailed price proposals. The contract is to be awarded using competitive negotiation procedures. Substantial completion of the NOAA tenant improvements is required by October 15, 2022. The solicitation sets minimum qualification and evaluation requirements for Phase 1 and Phase 2 proposals in response to this opportunity from the General Services Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd 01 - 911 Seismic-NOAA TI - QA 10.17.20.docx | DOCX document | |
| Amd 01 - 911 Seismic-NOAA TI - Phase I RFQ 10.17.20.docx | DOCX document | |
| Amd 01 - 911 Seismic NOAA TI - SF30 10.17.20.pdf | ||
| 911 Seismic - NOAA TI Agreement 9.30.20.docx | DOCX document | |
| Exhibit 1 - 911 FB Seismic-NOAA TI DB SOW 7.8.20.docx | DOCX document | |
| Exhibit 6 - Reps and Certs 9.30.20 .docx | DOCX document | |
| 911 Seismic - NOAA TI - Phase I RFQ 9.30.20.docx | DOCX document | |
| Exhibit 5 - GACA - GSA Affiliated Customer Accounts May 2014.docx | DOCX document | |
| Exhibit 10 - DBA Gen Decision OR20190029 (Mod 10) - 9.25.20.pdf | ||
| Exhibit 9 - SF1442.pdf | ||
| Exhibit 3 - Project Experience.pdf | ||
| Exhibit 2 - Pre-Proposal Conference Job Walk (Phase 2).docx | DOCX document | |
| Exhibit 4 - Performance Evaluation Survey - Commercial Client.docx | DOCX document | |
| Exhibit 7 - Key Personnel Resume Format.docx | DOCX document | |
| Exhibit 0 - SBU Document.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name, Date Bldg Size & Type (New/Exist)
Brief Description
City & State GSA Contact
Title and Phone
Name & Role of Persons(s) Assigned to Project by Firm (identify any sub-consultants)
(Enter “X” if by own firm, “S” if by sub-consultant)
C on st ru ct io n P
M
G
S up er in te nd en t
C Q
C S
D es ig n
P
Le ad
A rc hi te ct
E ng in ee r
H is to ric on su lta nt
Inter-relationship Matrix
| 3. Draft DB Agreement_FOB Ext.pdf |
| (1) FAR 52.222-99 Establishing a Minimum Wage for Contractor (JUL 2014) (DEVIATION) |
| (2) FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) |
| (3) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 08) |
| 1e.Exhibit 4_Interrelationship Matrix_FOB Ext.pdf |
| Exhibit 4 – Inter-relationship Matrix |
| 1b. Exhibit 1B_Designer Proj Exp.PP Eval.pdf |
| Project Title |
| Work Performed Expressed as a Percentage (%) of the Total Project Scope |
File details come from the government source that posted it. Updated .