This solicitation seeks design-build services for structural upgrades, accessibility improvements, and office renovations at the 911 Federal Building in Portland, Oregon. Key details include:
-
The scope involves seismic and non-seismic structural upgrades to the entire 8-story facility, renovations to upgrade accessibility compliance per ABAAS standards, and a build-out of over 20,000 square feet on the second floor for the NOAA Fisheries Western Region headquarters office relocation from leased space. Substantial completion for the NOAA TI space is required by October 15, 2022.
-
A two-phase design-build procurement and evaluation process will be used, with Phase One evaluating qualifications and selecting up to three firms to submit Phase Two price proposals. Price proposals may be with or without adherence to the Project Labor Agreement requirements defined in Phase Two. The contract will be awarded following competitive negotiations and is subject to conditions defined in the solicitation.
-
The project goals are to comply with GSA P-100 standards, complete upgrades while maintaining full building occupancy, minimize tenant impacts, maintain proper access and egress, and deliver a high-performing facility in collaboration with stakeholders.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title
Date Completed or % Complete to date
Location
Original Contract Amount $
Final Contract Amount: $
Design Contract Type: _____FFP ___Cost ____ Other (Specify)
Construction Project Contract Type: ____FFP ____Cost _____Other (Specify)
Number of Change Orders:
Total Dollar Value of Change Orders $
Construction Project Delivery Method:
___DB or Bridging ____DBB ___CMc ____ Other (Specify)
Complexity of Project
______Difficult _____Routine
Construction Project Size :
(a) Total Gross Square Footage (b) $ Amount:
Designer Role: Primary or Subcontractor
Project Owner Contact Information:
POC Individual Name POC Title
POC Organization Name
POC Address
POC Phone Number POC Email
Summary of Actual Performance Under Scope Describe type of project, tasks performed, and challenges
(State how the project meets the Relevant Experience Criteria of similar construction projects)
Note: Continuation pages up to 2 additional may be added
Work Performed Expressed as a Percentage (%) of the Total Project Scope
RELEVANT PROJECT EXPERIENCE
| 3. Draft DB Agreement_FOB Ext.pdf |
| (1) FAR 52.222-99 Establishing a Minimum Wage for Contractor (JUL 2014) (DEVIATION) |
| (2) FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) |
| (3) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 08) |
| 1e.Exhibit 4_Interrelationship Matrix_FOB Ext.pdf |
| Exhibit 4 – Inter-relationship Matrix |
| 1b. Exhibit 1B_Designer Proj Exp.PP Eval.pdf |
| Project Title |
| Work Performed Expressed as a Percentage (%) of the Total Project Scope |
File details come from the government source that posted it. Updated .