Exhibit 6 - Plans~7.pdf

PDF 3 MB Posted

Attached to
OR 217: CULVERT REPAIR PROJECT
Solicitation number
S-73000-00017123
Issued by
Washington County, Barlow City, Oregon

About this file

This document is a culvert repair project plan sheet prepared by the Oregon Department of Transportation for Washington County on Highway 217 at mile point 3.34 near Beaverton-Tigard. The project involves rehabilitating an existing 36-inch corrugated metal pipe (CMP) culvert for a total of 175 linear feet, installing an 18-inch polyvinyl chloride (PVC) flared inlet, removing and reinstalling 10 linear feet of 36-inch CMP, installing a 36-inch flared end section, installing Class 50 riprap outlet protection (5 cubic yards), removing and reinstalling 12 linear feet of guard rail, and re-seeding 0.01 acre of disturbed area. The project location is situated in Section 22, Township 01 South, Range 01 West, Willamette Meridian, and includes general construction notes addressing temporary water management, sediment control, site restoration, and full isolation requirements with sandbag barriers for the work area.

The technical specifications detail trench backfill, bedding, pipe zone, and multiple installation requirements for corrugated metal pipe coupling bands, with standardized dimensions and materials in accordance with Oregon Standard Drawings and Specifications effective through May 31, 2025. The plan incorporates safety protocols emphasizing environmental protection and sediment control measures to prevent sediment-laden water from leaving the site during construction and unexpected storm events. All materials and work must comply with current Oregon Standard Specifications, and the contractor bears full responsibility for implementing and maintaining the temporary water management facility until construction is completed and approved. The project includes detailed sandbag barrier calculations for full isolation and dewatering procedures to manage site conditions during construction activities.

View the file

Other files

File Type Posted
00017123 Preliminary Results.xlsx XLSX spreadsheet
00017123_Invitation to Bid.docx DOCX document
Attachment B Sample PI Contract.docx DOCX document
Exhibit 5 - Specifications~12.pdf PDF
Attachment A Form A-2 - Bid Pricing Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAY 2026

WASHINGTON COUNTY

BEAVERTON-TIGARD HIGHWAY

MP 3.34

OR 217: CULVERT REPAIR PROJECT

CULVERT REPAIR

PLANS FOR PROPOSED PROJECT

DEPARTMENT OF TRANSPORTATION

STATE OF OREGON

ADMINISTRATION

FEDERAL HIGHWAY

DIVISION

OREGON

PROJECT NUMBER

NO.

SHEET

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

WASHINGTON COUNTY

BEAVERTON-TIGARD HIGHWAY

MP 3.34

OR 217: CULVERT REPAIR PROJECT

A01A01STATE

ST. HELENS

ASTORIA

TILLAMOOK

MCMINNVILLE

ALBANYNEWPORT

CORVALLIS

HOOD

RIVER

DALLES

THE

MADRAS

PRINEVILLE

BEND

COQUILLE

GRANTS

PASS

Ashland

BURNS

KLAMATH

FALLS

CONDON

MORO

PENDLETON

LA GRANDE

ENTERPRISE

VALE Ontario

PORTLAND

SALEM

MEDFORD

EUGENE

ROSEBURG

Athena

N. Powder

Unity Dayville

Sisters

Juntura

Frenchglen

Burns Jct.

McDermitt

Paisley

La Pine

Crescent

Biggs

Lexington

Hermiston Boardman

Ukiah

Arlington

Malin

Brookings

Coos Bay

Drain

Canyonvil le

Reedsport

Oakridge

Goshen Florence

Lincoln City

Waldport

Home Sweet

Detroit Antelope

Maupin

Forest Grove

Hebo

Cannon Beach

Seaside Rainier

Milton-Freewater

W

26 35 197

39519

3953197

Bonanza

Junction City

BAKER CITY

HEPPNER

Copperfield

Lake Silver

Junction CaveBEACH

GOLD

Orford Port

LAKEVIEW

CANYON

CITY

Day John

CITY

OREGON

HILLSBORO

DALLAS

Redmond

Val ley Jordan

Overall Length Of Project - XX.XX Miles

(503) 232-1987).

The Oregon Utility Notification Center Is

The Center (Note: The Telephone Number For

You May Obtain Copies Of The Rules By Calling

Through OAR 952-001-0100.

Those Rules Are Set Forth In OAR 952-001-0001

By The Oregon Utility Notification Center.

Oregon Law Requires You To Follow Rules Adopted

ATTENTION:

LET'S ALL

WORK TOGETHER

TO MAKE THIS

JOB SAFE

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

T. 01 S., R. 01 W., W.M.

F

O T

N E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

59V-080

PROJECT LOCATION

HWY 144, MP 3.34

INDEX OF SHEETS

SHEET NO. DESCRIPTION

Title SheetA01

HB01 Culvert Sheet

RD300 Trench backfill, Bedding, Pipe Zone, and Multiple Installations

RD325 Coupling Bands for Corrugated Metal Pipe

H_M26033_clpl_01.dgn :: Title Sheet 4/14/2026 10:16:08 AM hwyr33e

18" PVC

FL 1

93.

1'

Inlet

36"

CMP

59V-080

CULVERT SHEET

Install 36" flared end section - 1 EA

MP 3.34

Sec. 22, T. 01 S., R, 01 W., W.M.

MP 3.34

OREGON

RE

GI

ST

ERE

D PROFESSIONALEN

GINEER

RENEWS: 6-30-2027

51 99

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

(see dwg. no. RD300 & RD325 for details)

Install Class 50 riprap outlet protection - 5 CY

Connect to extg. pipe - 1 EA

5 ft depth

Inst. 36" cmp - 10 LF

Remove 36" cmp - 10 LF

MP 3.34

O R

W e s ts id e E x p r e s s S e r v ic e L ig h t

R a il

P o r tl a n d W e s te r n R a il r o a d

Rehabilitate extg. 36" culvert- 175 LF

MP 3.34

GENERAL NOTES

and restore site as per plans and specifications.

Remove all Temporary Water Management features sediment-laden water does not leave the site.

storm events and to insure that sediment and periods, this facility shall be upgraded for unexpected anticipated site conditions. During the construction on this plan is the minimum requirements for

The Temporary Water Management Facility shown is completed and approved.

responsibility of the contractor until all construction replacement and upgrading of this facility is the

Management Plan and the construction, maintenance, The implementation of this Temporary Water laden water does not leave the site.

dewatering of the work area to insure sediment

Provide adequate sediment control measures during temporary settling basin or other approved location.

to an area up stream of the sandbag barrier to a contained by the secondary barrier shall be returned

Water seeping through the primary barrier and bypass pipe and/or pump.

below can be used to estimate the size of the using pipe, pump or combination. The discharge table on site conditions. Route water around work area

Size the temporary water management facility based

If Needed, install secondary sandbag barrier.

primary sandbag barrier across the stream channel.

Isolating the work site upstream: Install single

FULL ISOLATION NOTES

its height is:

linear feet of barrier that is twice as wide as

The estimated number of bags needed for 100 inches wide by 14 inches long. This is a 30 pound bag of dry sand.

having a placed dimension of about 4 to 5 inches high by 9 to 10 used to construct a sandbag barrier. This is based on each bag of 2 feet). This is the minimum width-to-height ratio that should be wide as its height (e.g., a one foot high wall would have a base width

A common recommendation is to make the sandbag barrier twice as

Height (ft)# bags

2 1700

H e ig h t f t.

Width (ft.)

SANDBAG FOOTPRINT DETAIL

NO SCALE

Sediment control facility

Sandbag barrier line

Dewatering sump pump

LEGEND

Remove and re-install guard rail - 12 LF

MP 3.34

CONSTRUCTION NOTES

Protect drainage curb

Rehabilitate extg. 36" culvert- 175 LF

MP 3.34

Re-seed any disturbed area- 0.01 ACRE

MP 3.34

2 4

2 3

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:CADD Tech:

Designer:

SHEET NO.

COUNTY Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

WASHINGTON COUNTY

BEAVERTON-TIGARD HIGHWAY

MP 3.34

OR 217 CULVERT REPAIR PROJECT

HWY:

M.P.:

DATE

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

HB01

WASHINGTON

3.34

ALAN BABICKYWADE HOLADAY

WADE HOLADAY

H_M26033_clpl_01.dgn :: Sheet 1 4/14/2026 10:17:40 AM hwyr33e

RD300

INSTALLATIONS

PIPE ZONE AND MULTIPLE

TRENCH BACKFILL, BEDDING,

R D

.d g n

14-JUL-2014N/A

J U

L

C

"A" note 4)

(See general

Tracer wire

MULTIPLE INSTALLATIONS

DIAMETER MIN. SPACE BETWEEN PIPES

(in)

"A"

(in)

"B"

(in)

"C"

(in)

"D"

TABLE A

Finish grade stabilization, as required

Trench foundation see Table A

"C" Pipe bedding, Top of subgrade as directed

Topsoil or existing material

Surfacing-match

Base material m a te r ia l

E x c a v a te d n a ti v e

C la s s A c r u s h e d r o c k

C la s s B o r m a x c le a n s a n d

C la s s C

A s d ir e c te d m a te r ia l m a x

C la s s D p it o r b a r r u n

C L

S M

C la s s E

T re n c h b a c k fi ll a re a P ip e z o n eS e e T a b le

A

D

Nom."B" "B"

Pipe diameter

24" min.

m in

D ia

Up to 48"

48" to 72"

24"

) dia. of pipe2

One half (

4. See Std. Dwg. RD336 for tracer wire details (When required).

3. Pipes over 72" diameter are structures, and are not applicable to this drawing.

diameter.

used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe

2. For pipe installation in embankment areas where the trench method will not be

1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.

GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:

see general note 3.

For pipes over 72" diameter, the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

RD325

CORRUGATED METAL PIPE

COUPLING BANDS FOR

R D

.d g n

REVISED DETAILS AND NOTES01-2023

20-JAN-2023N/A

J A

N

⅝

½

⅜

⅝

⅝

½

Band 7"

W

(In) Pipe Dia.

(In) Pipe Dia.W (In)

Ann.Hel. Bolts "2

# Of W (in)

Ann.Hel.

24-84

18-84

12-15

6-10

2-3

36-120

36-84

Bolts "2

# Of

Dim. A

C o rr u g a ti o n s

60-84

24-54

12-21

84-120

60-84

36-54

Rods # Of

Rods # Of

"x

(in) W

(in) W

"x anchors, when required.

See Std. Dwgs. RD330 and RD332 for pipe slope8.

engineer.

or other insulating material as approved by the a full width neoprene gasket or coated with asphalt connected, the connecting band shall be used with To prevent galvanic action when unlike metals are7.

diameters over 42".

bands of two or more pieces are required for pipe pipe diameters up to and including 42". Coupling One or two piece coupling bands are optional for6.

Standard Specifications.

tested for water tightness in accordance with the Joints for sanitary sewers and siphons are to be5.

". 16 3diameter, the gasket thickness may be centering on the joint. For pipes 12" or less in thick of a width equal to the band width and

" 8 3 vulcanized) synthetic, closed-cell sponge rubber all coupling bands shall be (butt-cemented or installations when shown on the plans. Gaskets for irrigation pipes, storm sewers, and other Watertight joints with gaskets are required for4.

corrugation and pipe diameter shown may be used.

width coupling band indicated for the band type, used as an acceptable alternate, the minimum Under conditions where concrete pipe may be3.

that used for the pipe.

aluminum pipe shall be of the same thickness as nominal thickness. Coupling bands for corrugated 0.109" nominal thickness nor less than 0.052" than that used for the pipe but not more than pipes may be two numerical thicknesses lighter Coupling bands for corrugated iron and steel2.

shall be galvanized or aluminum coated.

All steel coupling bands and connection hardware1.

TYPE E

TYPE DTYPE BTYPE A

HELICAL COUPLINGANNULAR COUPLING

CONNECTION ANGLE DETAIL

TOP VIEW

END VIEW END VIEW

COUPLING BAND DIMPLE DETAIL

" Corrugations2 1"x3

22 3"x1" Corrugations

(In) Pipe Dia.

(In) Rod Dia.

Narrow Band Wide Band

Req'd. above 42" dia.

to 42" diameter.

Second angle conn. opt.

Band (See general note 4) where required Watertight joint gasket

"16 32"x2"x

" bolts2 and toe of angle of corrugation at heel fillet weld at crest Rivet, spotweld or bolts "2

Band

Pipe Band

Pipe with cut washers " carriage bolts8

32 -

W W joints req'd. for watertight (Sigma) clips

Band

(See general note 4) where required Watertight joint gasket with cut washers " carriage bolts8

32 -pipe corrugated Helically

Helical pipe

Band

Pipe

(See general note 6) where required Watertight joint gasket

Cast lug

Band

4 - Rods and lugs

Cast lug

Pipe as reqd. to fit the helix angle.

Dimension A: 7" min. between dimples

" bolts2 13 -

Pipe

Band min 12"

"16 32"x2"x to fit the helix angle 8 spaces as reqd.

"2

(For 6"-10" dia. pipes)

(For 12"-30" dia. pipes)

GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this