Exhibit 6 - Plans~7.pdf
PDF 3 MB Posted
- Attached to
- OR 217: CULVERT REPAIR PROJECT
- Solicitation number
- S-73000-00017123
- Issued by
- Washington County, Barlow City, Oregon
About this file
This document is a culvert repair project plan sheet prepared by the Oregon Department of Transportation for Washington County on Highway 217 at mile point 3.34 near Beaverton-Tigard. The project involves rehabilitating an existing 36-inch corrugated metal pipe (CMP) culvert for a total of 175 linear feet, installing an 18-inch polyvinyl chloride (PVC) flared inlet, removing and reinstalling 10 linear feet of 36-inch CMP, installing a 36-inch flared end section, installing Class 50 riprap outlet protection (5 cubic yards), removing and reinstalling 12 linear feet of guard rail, and re-seeding 0.01 acre of disturbed area. The project location is situated in Section 22, Township 01 South, Range 01 West, Willamette Meridian, and includes general construction notes addressing temporary water management, sediment control, site restoration, and full isolation requirements with sandbag barriers for the work area.
The technical specifications detail trench backfill, bedding, pipe zone, and multiple installation requirements for corrugated metal pipe coupling bands, with standardized dimensions and materials in accordance with Oregon Standard Drawings and Specifications effective through May 31, 2025. The plan incorporates safety protocols emphasizing environmental protection and sediment control measures to prevent sediment-laden water from leaving the site during construction and unexpected storm events. All materials and work must comply with current Oregon Standard Specifications, and the contractor bears full responsibility for implementing and maintaining the temporary water management facility until construction is completed and approved. The project includes detailed sandbag barrier calculations for full isolation and dewatering procedures to manage site conditions during construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017123 Preliminary Results.xlsx | XLSX spreadsheet | |
| 00017123_Invitation to Bid.docx | DOCX document | |
| Attachment B Sample PI Contract.docx | DOCX document | |
| Exhibit 5 - Specifications~12.pdf | ||
| Attachment A Form A-2 - Bid Pricing Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAY 2026
WASHINGTON COUNTY
BEAVERTON-TIGARD HIGHWAY
MP 3.34
OR 217: CULVERT REPAIR PROJECT
CULVERT REPAIR
PLANS FOR PROPOSED PROJECT
DEPARTMENT OF TRANSPORTATION
STATE OF OREGON
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
WASHINGTON COUNTY
BEAVERTON-TIGARD HIGHWAY
MP 3.34
OR 217: CULVERT REPAIR PROJECT
A01A01STATE
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
Overall Length Of Project - XX.XX Miles
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0100.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
ATTENTION:
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
T. 01 S., R. 01 W., W.M.
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
59V-080
PROJECT LOCATION
HWY 144, MP 3.34
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
HB01 Culvert Sheet
RD300 Trench backfill, Bedding, Pipe Zone, and Multiple Installations
RD325 Coupling Bands for Corrugated Metal Pipe
H_M26033_clpl_01.dgn :: Title Sheet 4/14/2026 10:16:08 AM hwyr33e
18" PVC
FL 1
93.
1'
Inlet
36"
CMP
59V-080
CULVERT SHEET
Install 36" flared end section - 1 EA
MP 3.34
Sec. 22, T. 01 S., R, 01 W., W.M.
MP 3.34
OREGON
RE
GI
ST
ERE
D PROFESSIONALEN
GINEER
RENEWS: 6-30-2027
51 99
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
(see dwg. no. RD300 & RD325 for details)
Install Class 50 riprap outlet protection - 5 CY
Connect to extg. pipe - 1 EA
5 ft depth
Inst. 36" cmp - 10 LF
Remove 36" cmp - 10 LF
MP 3.34
O R
W e s ts id e E x p r e s s S e r v ic e L ig h t
R a il
P o r tl a n d W e s te r n R a il r o a d
Rehabilitate extg. 36" culvert- 175 LF
MP 3.34
GENERAL NOTES
and restore site as per plans and specifications.
Remove all Temporary Water Management features sediment-laden water does not leave the site.
storm events and to insure that sediment and periods, this facility shall be upgraded for unexpected anticipated site conditions. During the construction on this plan is the minimum requirements for
The Temporary Water Management Facility shown is completed and approved.
responsibility of the contractor until all construction replacement and upgrading of this facility is the
Management Plan and the construction, maintenance, The implementation of this Temporary Water laden water does not leave the site.
dewatering of the work area to insure sediment
Provide adequate sediment control measures during temporary settling basin or other approved location.
to an area up stream of the sandbag barrier to a contained by the secondary barrier shall be returned
Water seeping through the primary barrier and bypass pipe and/or pump.
below can be used to estimate the size of the using pipe, pump or combination. The discharge table on site conditions. Route water around work area
Size the temporary water management facility based
If Needed, install secondary sandbag barrier.
primary sandbag barrier across the stream channel.
Isolating the work site upstream: Install single
FULL ISOLATION NOTES
its height is:
linear feet of barrier that is twice as wide as
The estimated number of bags needed for 100 inches wide by 14 inches long. This is a 30 pound bag of dry sand.
having a placed dimension of about 4 to 5 inches high by 9 to 10 used to construct a sandbag barrier. This is based on each bag of 2 feet). This is the minimum width-to-height ratio that should be wide as its height (e.g., a one foot high wall would have a base width
A common recommendation is to make the sandbag barrier twice as
Height (ft)# bags
2 1700
H e ig h t f t.
Width (ft.)
SANDBAG FOOTPRINT DETAIL
NO SCALE
Sediment control facility
Sandbag barrier line
Dewatering sump pump
LEGEND
Remove and re-install guard rail - 12 LF
MP 3.34
CONSTRUCTION NOTES
Protect drainage curb
Rehabilitate extg. 36" culvert- 175 LF
MP 3.34
Re-seed any disturbed area- 0.01 ACRE
MP 3.34
2 4
2 3
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:CADD Tech:
Designer:
SHEET NO.
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
WASHINGTON COUNTY
BEAVERTON-TIGARD HIGHWAY
MP 3.34
OR 217 CULVERT REPAIR PROJECT
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
HB01
WASHINGTON
3.34
ALAN BABICKYWADE HOLADAY
WADE HOLADAY
H_M26033_clpl_01.dgn :: Sheet 1 4/14/2026 10:17:40 AM hwyr33e
RD300
INSTALLATIONS
PIPE ZONE AND MULTIPLE
TRENCH BACKFILL, BEDDING,
R D
.d g n
14-JUL-2014N/A
J U
L
C
"A" note 4)
(See general
Tracer wire
MULTIPLE INSTALLATIONS
DIAMETER MIN. SPACE BETWEEN PIPES
(in)
"A"
(in)
"B"
(in)
"C"
(in)
"D"
TABLE A
Finish grade stabilization, as required
Trench foundation see Table A
"C" Pipe bedding, Top of subgrade as directed
Topsoil or existing material
Surfacing-match
Base material m a te r ia l
E x c a v a te d n a ti v e
C la s s A c r u s h e d r o c k
C la s s B o r m a x c le a n s a n d
C la s s C
A s d ir e c te d m a te r ia l m a x
C la s s D p it o r b a r r u n
C L
S M
C la s s E
T re n c h b a c k fi ll a re a P ip e z o n eS e e T a b le
A
D
Nom."B" "B"
Pipe diameter
24" min.
m in
D ia
Up to 48"
48" to 72"
24"
) dia. of pipe2
One half (
4. See Std. Dwg. RD336 for tracer wire details (When required).
3. Pipes over 72" diameter are structures, and are not applicable to this drawing.
diameter.
used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe
2. For pipe installation in embankment areas where the trench method will not be
1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
see general note 3.
For pipes over 72" diameter, the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD325
CORRUGATED METAL PIPE
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N
⅝
½
⅜
⅝
⅝
½
Band 7"
W
(In) Pipe Dia.
(In) Pipe Dia.W (In)
Ann.Hel. Bolts "2
# Of W (in)
Ann.Hel.
24-84
18-84
12-15
6-10
2-3
36-120
36-84
Bolts "2
# Of
Dim. A
C o rr u g a ti o n s
60-84
24-54
12-21
84-120
60-84
36-54
Rods # Of
Rods # Of
"x
(in) W
(in) W
"x anchors, when required.
See Std. Dwgs. RD330 and RD332 for pipe slope8.
engineer.
or other insulating material as approved by the a full width neoprene gasket or coated with asphalt connected, the connecting band shall be used with To prevent galvanic action when unlike metals are7.
diameters over 42".
bands of two or more pieces are required for pipe pipe diameters up to and including 42". Coupling One or two piece coupling bands are optional for6.
Standard Specifications.
tested for water tightness in accordance with the Joints for sanitary sewers and siphons are to be5.
". 16 3diameter, the gasket thickness may be centering on the joint. For pipes 12" or less in thick of a width equal to the band width and
" 8 3 vulcanized) synthetic, closed-cell sponge rubber all coupling bands shall be (butt-cemented or installations when shown on the plans. Gaskets for irrigation pipes, storm sewers, and other Watertight joints with gaskets are required for4.
corrugation and pipe diameter shown may be used.
width coupling band indicated for the band type, used as an acceptable alternate, the minimum Under conditions where concrete pipe may be3.
that used for the pipe.
aluminum pipe shall be of the same thickness as nominal thickness. Coupling bands for corrugated 0.109" nominal thickness nor less than 0.052" than that used for the pipe but not more than pipes may be two numerical thicknesses lighter Coupling bands for corrugated iron and steel2.
shall be galvanized or aluminum coated.
All steel coupling bands and connection hardware1.
TYPE E
TYPE DTYPE BTYPE A
HELICAL COUPLINGANNULAR COUPLING
CONNECTION ANGLE DETAIL
TOP VIEW
END VIEW END VIEW
COUPLING BAND DIMPLE DETAIL
" Corrugations2 1"x3
22 3"x1" Corrugations
(In) Pipe Dia.
(In) Rod Dia.
Narrow Band Wide Band
Req'd. above 42" dia.
to 42" diameter.
Second angle conn. opt.
Band (See general note 4) where required Watertight joint gasket
"16 32"x2"x
" bolts2 and toe of angle of corrugation at heel fillet weld at crest Rivet, spotweld or bolts "2
Band
Pipe Band
Pipe with cut washers " carriage bolts8
32 -
W W joints req'd. for watertight (Sigma) clips
Band
(See general note 4) where required Watertight joint gasket with cut washers " carriage bolts8
32 -pipe corrugated Helically
Helical pipe
Band
Pipe
(See general note 6) where required Watertight joint gasket
Cast lug
Band
4 - Rods and lugs
Cast lug
Pipe as reqd. to fit the helix angle.
Dimension A: 7" min. between dimples
" bolts2 13 -
Pipe
Band min 12"
"16 32"x2"x to fit the helix angle 8 spaces as reqd.
"2
(For 6"-10" dia. pipes)
(For 12"-30" dia. pipes)
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
File details come from the government source that posted it. Updated .