This performance requirements summary document outlines the key tasks and standards for a federal contract to crush gravel at the Jack Creek quarry located on U.S. Forest Service land. The contractor will be responsible for furnishing all labor, equipment, materials and incidentals necessary to produce and stockpile crushed gravel in specified locations, quantities, quality and gradations. Performance will be evaluated on meeting gravel gradation standards at least 85% of the time according to quality assurance testing, as well as on MSHA compliance, proper handling of topsoil, unsuitable materials and oversize material, erosion control practices, rehabilitating disturbed areas, and maintaining access roads and stockpiles. The contract exhibits provide the project location and quarry site maps, aggregate specification, quality assurance plan, and a sample daily production log.

View the file

Other files for this federal contract opportunity

Other files attached to Jack Creek Aggregate Crushing, newest first.
File Type Posted
Exhibit 2 Pit Site Plan.pdf PDF
Exhibit 4 Aggregate Specification - Grading E (Base).pdf PDF
Exhibit 3 Gravel Crushing Task Statement and Quality Standard.pdf PDF
Exhibit 7 Sample Daily Production Log.pdf PDF
Exhibit 1 Project Location Map.pdf PDF
1267T020Q0030.pdf PDF
Exhibit 8 Past Performance Data Sheet.pdf PDF
WY WD 2015-5413 Rev 10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 6

Performance Requirements Summary (PRS)

Task Statement Performance Standard AQL Method of Surveillance Incentive/Disincentive

PB 100 - Gravel Crushing

Production of Gravel

Gradation

See Performance Work

Statement - PWS and

Task Statement and

Quality Standards

85% Quality Assurance

Gradation Testing

I - Good performance evaluation

D - Poor performance evaluation

D - Rework without compensation

PB 100 - Gravel Crushing

Sampling and Testing

MSHA conformance

Stormwater Permit compliance

Pit development plan conformance

Topsoil stripped and stockpiled

Unsuitable material stockpiled

Oversize material utilized

Areas sloped to drain

Drainages protected

Side slope rehabilitation

Stockpiles and buffers maintained

Disturbed areas seeded

Filler sources rehabilitated

Access roads maintained

See Performance Work

Statement - PWS and

Task Statement and

Quality Standards

100% Periodic and Final Inspection

I - Good performance evaluation

D - Poor performance evaluation

D - Rework without compensation

Cover
SECTION C - Performance Work Statement
SECTION J - Technical Exhibits
EXHIBIT 1 - Project Location Map
EXHIBIT 2 - Pit Site Plan
EXHIBIT 3 - Gravel Crushing Task Statement and Quality Standards
EXHIBIT 4 - Aggregate Specification, E (Base)
EXHIBIT 5 - Quality Assurance Plan (QASP)