Exhibit 5 - Map Camp Rilea Project Priority Area 3.pdf
PDF 6 MB Posted
- Attached to
- RFQ: Camp Rilea Forest Restoration Project
- Solicitation number
- S-24800-00014703
- Issued by
- Clatsop County, Oregon
About this file
This is a geospatial map detailing the Camp Rilea Forest Management Proposed Project Priority Area 3, created collaboratively by multiple agencies including Esri, NASA, NGA, USGS, Oregon State Parks, State of Oregon GEO, and WA State Parks GIS. The map depicts a 65.9-acre project area divided into multiple functional units and training areas, with detailed spatial information for the year 2025. The project area includes five distinct functional units: UF1 (2 acres), UF3 (34.1 acres), UF4 (0.26 acres), UF6 (1.5 acres), and an open meadow spanning 28 acres. The map also identifies four training areas (TA 01-04), wetland locations, site boundaries, and SDZ (Safety Danger Zone) extents.
The map is geo-referenced using the NAD 1983 UTM Zone 10N coordinate system and was authored by Carl Anderson on August 1, 2025. It provides a comprehensive visual representation of the terrain, showing coastal proximity near Warrenton and Sunset Beach in Oregon. The detailed cartographic representation includes scale measurements in both meters and feet, and incorporates high-resolution imagery from multiple geospatial data sources. The map's legend and spatial layers suggest this is likely a forest management and military training area planning document, with careful delineation of ecological and operational zones.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 200100 Meters
0 1,000500 Feet
Map Date: 1 August 2025 Map Author: Carl Anderson Coordinate System: NAD 1983 UTM Zone 10N
Esri, NASA, NGA, USGS, Oregon State Parks, State of Oregon GEO, WA State Parks GIS, Esri, TomTom, Garmin, SafeGraph, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, USDA, USFWS, Maxar
Camp Rilea Forest Management Proposed Project Priority Area 3
TA 04
TA 03
TA 01
TA 02
Legend
Priority Area 3 -
65.9 Acres
Functional Units
UF1 - 2 Acres
UF3 - 34.1 Acres
UF4 - .26 Acres
UF6 - 1.5 Acres
Open Meadow - 28 Acres
Site Boundary
Training Areas
SDZ Extent
Wetlands
File details come from the government source that posted it. Updated .