Exhibit 5 ESB 2026 I-5 NB Exit 86 Fence_Specs.pdf

PDF 352 KB Posted

Attached to
ESB 2026 I-5: NB Exit 86 Fence Upgrades Project
Solicitation number
S-73000-00017035
Issued by
Douglas County, Oregon

About this file

This is a Special Provisions and Specifications document for the ESB 2026 I-5 NB Exit 86 Fence Upgrades Project issued by the Oregon Department of Transportation (ODOT). The project involves the removal and disposal of approximately 1,200 linear feet of existing Type 2 fence and associated vegetation located adjacent to Interstate 5 NB Exit 86 on-ramp at Quines Creek, with subsequent furnishing and installation of new Type 2 fence per Section 01050 specifications. The new fence will connect to existing wood end posts at the northeastern end near the bridge over Quines Creek along Eakins Road. The project scope also includes temporary work zone traffic control maintenance and incidental work as directed. ODOT Project Manager Blake Howren (Blake.W.Howren@odot.oregon.gov) serves as the primary contact for general project information. The work must comply with the 2024 Oregon Standard Specifications for Construction and the 2026 ODOT Temporary Traffic Control Handbook for operations of three days or less.

Contractors must submit a Traffic Control Plan and Temporary Pedestrian Accessible Route Plan for approval by the ODOT Project Manager before commencing work. The contractor is responsible for confirming with the project manager which portions of existing fence require removal and the final alignment and length of new fence prior to installation. The alignment of new fence may be shifted to avoid vegetation where practicable, though minor clearing may be required to facilitate installation. Contractors must comply with all applicable sections of the Standard Specifications including mobilization, traffic accommodations, temporary traffic control measures, erosion and sediment control, environmental protection, and fence installation specifications. No separate payment will be made for incidental work not specifically identified in the bid schedule.

View the file

Other files

File Type Posted
00017035 ESB_RFCQ.docx DOCX document
00017035 ESB_Sample_Contract.docx DOCX document
Exhibit 6 RD810.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 1

SPECIAL PROVISONS & SPECIFICATIONS FOR

ESB 2026 I-5: NB EXIT 86 FENCE UPGRADES PROJECT

SCOPE OF WORK

The Work to be done under this Contract consists of supplying the materials, equipment, labor, and incidentals necessary to perform the following work, located adjacent to the Interstate 5 (I-5) NB Exit 86 on-ramp at Quines Creek, as described herein and as otherwise directed:

1) Provide and maintain temporary work zone traffic control.

2) Remove and dispose of existing Type 2 fence and vegetation. Furnish and install approximately

1,200’ of new Type 2 fence per Section 01050 and as directed. Connect new Type 2 fence to existing wood end posts at the northeastern end near the bridge over Quines Creek along Eakins Road. See Figure 1 (below) and RD810 for location and additional details.

3) Perform additional and incidental work as noted in the Contract plans and specifications and as otherwise directed.

PROJECT INFORMATION

General information pertaining to this project may be obtained from the following Project Manager or approved representative:

Blake Howren, District Ops. Coordinator Email: Blake.W.Howren@odot.oregon.gov

APPLICABLE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS

2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (Standard Specifications) include detailed technical specifications in Parts 00200 through 03000 inclusive (Technical Specifications) that apply to this ITB and the resulting Contract.

Some sections of the Technical Specifications are identified and modified herein, Specifications. Sections of the Technical Specifications not modified remain applicable to the Contract according to their original terms. Unless they are identified herein, Specifications, sections of the Standard Specifications in Part 00100 (General Conditions) are not applicable to this Contract. Bidders can also access this information at the following Internet address:

2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION

Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.

Where neither the Special Provisions nor the bid schedule indicate separate payment for the work to be completed under this Contract, perform the work as incidental for which no separate measurement or payment will be made.

mailto:Blake.W.Howren@odot.oregon.gov https://www.oregon.gov/odot/Business/Specs/2024_STANDARD_SPECIFICATIONS.pdf https://www.oregon.gov/odot/Business/Specs/2024_STANDARD_SPECIFICATIONS.pdf

ESB 2026 I-5: NB EXIT 86 FENCE UPGRADES PROJECT – EXHIBIT 1

Figure 1 - Location of fence Work to be done. Remove visible portions of existing fence only. Existing fence that is not visible and buried in blackberries or other thick vegetation may remain in place. Furnish and install approximately 1200’ of new Type 2 fence according to Section 01050, RD810, and as directed. The alignment of the new fence may be shifted to avoid a majority of vegetation. Some minor clearing may be required to facilitate fence installation. Dispose of removed vegetation per Section 00290 or as otherwise allowed. Confirm portions of existing fence that need to be removed and the alignment and length of new fence with the ODOT Project Manager or approved representative prior to installation.

SECTION 00210 - MOBILIZATION

Comply with Section 00210 of the Standard Specifications modified as follows:

Construction

00210.40 Mobilization – delete the last bullet of the bullet list. Obtaining and maintaining access to Doc Express® and using Doc Express® to submit documents will not be required on this project.

Payment

00210.90 Payment - delete the last sentence in this subsection.

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

Comply with Section 00220 of the Standard Specifications.

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

Comply with Section 00221 of the Standard Specifications modified as follows:

00221.00 Scope - Add the following:

Provide work zone traffic control measures conforming to The Oregon Department of Transportation’s Temporary Traffic Control Handbook for Operations of Three Days OR Less, December 2026 Edition.

Copies of this handbook can be accessed via the internet under “Publications” on the Traffic Engineering and Operations Section web site (Highway Division, Oregon Department of Transportation) at:

2026 ODOT TEMPORARY TRAFFIC CONTROL HANDBOOK (OTTCH)

00221.06 - Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:

The Contractor must submit a Traffic Control Plan (TCP) and a Temporary Pedestrian Accessible Route Plan (TPAR) and obtain approval from the Oregon Department of Transportation Project Manager before work may commence on the Project.

SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS

Comply with Section 00222 of the Standard Specifications.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2FEngineering%2FDocs_TrafficEng%2FOTTCH-2026.pdf&data=05%7C02%7CBlake.W.HOWREN%40odot.oregon.gov%7C09112d01d60b404525d208de36966c0e%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C639008216839407999%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=DeXQYBeL42RtKml%2FkT0mgCrvRMntTFmLhkAIKCt4Y9A%3D&reserved=0

SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES

Comply with Section 00223 of the Standard Specifications.

SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES

Comply with Section 00224 of the Standard Specifications.

SECTION 00280 - EROSION AND SEDIMENT CONTROL

Comply with Section 00280 of the Standard Specifications

SECTION 00290 - ENVIRONMENTAL PROTECTION

• Comply with Section 00290 of the Standard Specifications

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Comply with Section 00310 of the Standard Specifications.

SECTION 00320 - CLEARING AND GRUBBING

Comply with Section 00320 of the Standard Specifications.

SECTION 00440 - COMMERCIAL GRADE CONCRETE

Comply with Section 00440 of the Standard Specifications.

SECTION 01050 - FENCES

Comply with Section 01050 of the Standard Specifications.

1) Provide and maintain temporary work zone traffic control.
PROJECT INFORMATION
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
SECTION 00280 - EROSION AND SEDIMENT CONTROL
SECTION 00290 - ENVIRONMENTAL PROTECTION
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 00320 - CLEARING AND GRUBBING
Comply with Section 00320 of the Standard Specifications.
SECTION 00440 - COMMERCIAL GRADE CONCRETE
SECTION 01050 - FENCES