Exhibit-5_Access-Staging-Parking.pdf

PDF 3 MB Posted

Attached to
OC LOOP CARBON CREEK CHANNEL SEGMENT D BIKEWAY GAP CLOSURE
Solicitation number
IFB-080-2237404-JM2
Issued by
Orange County, San Francisco City, California

About this file

Exhibit 5 is an addendum document prepared by the County of Orange Department of Public Works for the OC Loop Segment D Bikeway Gap Closure project. The exhibit provides visual maps identifying access points, potential laydown areas, and employee parking locations for the construction project along the Carbon Creek Channel. A non-mandatory pre-bid meeting and job walk are scheduled for February 28, 2024, at 2:00 PM, with project questions due by March 8, 2024, and bids due by 2:00 PM on March 20, 2024. The exhibit indicates that access and staging areas are available at multiple locations, including potential parking at Rose Drive adjacent to Friends Church (requiring contractor coordination with the church) and temporary storage and parking space in a designated hatched area during the two-month tunnel construction period near Bastanchury Road. Daily contractor traffic control is required during construction, with traffic control measures to be removed each night. Bidders must hold an active Class A Contractor's License and are responsible for reviewing all addenda and contract documents.

The OC Loop Segment D project is a federally funded transportation infrastructure initiative with an estimated contract value of $12,700,000, funded through the Federal Highway Administration (FHWA) and California Department of Transportation (Caltrans). The contract includes a 22% Disadvantaged Business Enterprise (DBE) goal in accordance with federal regulations under Title 49 CFR Part 26. The awarded contractor must provide Performance and Payment Bonds each for 100% of the contract amount, submit comprehensive insurance documentation within ten calendar days of award recommendation, and comply with Labor Code Section 1771.1(a) regarding contractor registration and prevailing wage requirements. Additional requirements include electronic payroll submission to the Labor Commissioner, adherence to Buy America goals, special federal provisions, a Campaign Contribution Disclosure Form, and completion of a Contractor Safety Activity Checklist.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OC Loop Segment D: Addendum 3 Exhibit

SCALE: NTS

OC CONSTRUCTION

COUNTY OF ORANGE

DEPARTMENT OF

PUBLIC WORKS

LEGEND

ACCESS POINT

POTENTIAL LAYDOWN AREA

POTENTIAL EMPLOYEE PARKING

Rose Drive Friends Church may have availability.

Coordination with church is the responsibility of the contractor.

Some space will become available in hatched area during the 2 month tunnel construction period.

Space could be used for storage of material or parking

Bastanchury Rd

Note: Daily contractor traffic control required. Traffic control to be removed each night.

EXHIBIT 5

OC Loop Segment D Access, Staging & Parking

OC Loop Segment D: Addendum 3 Exhibit

OC CONSTRUCTION

COUNTY OF ORANGE

DEPARTMENT OF

PUBLIC WORKS

LEGEND

ACCESS POINT

POTENTIAL LAYDOWN AREA

POTENTIAL EMPLOYEE PARKING

SCALE: NTS 2 of 2

OC Loop Segment D Access, Staging & Parking

EXHIBIT 5

Page 1
Page 1

File details come from the government source that posted it. Updated .