Exhibit-5_Access-Staging-Parking.pdf
PDF 3 MB Posted
- Solicitation number
- IFB-080-2237404-JM2
- Issued by
- Orange County, San Francisco City, California
About this file
Exhibit 5 is a detailed site access, staging, and parking plan from the County of Orange Department of Public Works for the OC Loop Carbon Creek Channel Segment D Bikeway Gap Closure project. The document provides two aerial maps showing potential access points, laydown areas, and employee parking locations along Bastanchury Road and Golden Avenue. The project involves specific traffic control requirements, with daily contractor traffic control that must be removed each night. The maps indicate red-marked access points and potential laydown areas, blue-marked potential employee parking zones, and include notes about space availability, such as a potential hatched area becoming available during the 2-month tunnel construction period.
The project is federally funded through the Federal Highway Administration (FHWA) and California Department of Transportation (Caltrans), with a 22% Disadvantaged Business Enterprise (DBE) goal. The bid solicitation requires contractors to hold an active "A" Contractor's License, comply with labor code requirements, and submit bids through an online bidding system. Key dates include a non-mandatory pre-bid meeting on February 28, 2024, questions due by March 8, 2024, and bids due by 2:00 PM on March 20, 2024, with a public bid opening in Santa Ana, California. Contractors must provide comprehensive insurance documentation and be prepared to sign a contract upon award notification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OC Loop Segment D: Addendum 3 Exhibit
SCALE: NTS
OC CONSTRUCTION
COUNTY OF ORANGE
DEPARTMENT OF
PUBLIC WORKS
LEGEND
ACCESS POINT
POTENTIAL LAYDOWN AREA
POTENTIAL EMPLOYEE PARKING
Rose Drive Friends Church may have availability.
Coordination with church is the responsibility of the contractor.
Some space will become available in hatched area during the 2 month tunnel construction period.
Space could be used for storage of material or parking
Bastanchury Rd
Note: Daily contractor traffic control required. Traffic control to be removed each night.
EXHIBIT 5
OC Loop Segment D Access, Staging & Parking
OC Loop Segment D: Addendum 3 Exhibit
OC CONSTRUCTION
COUNTY OF ORANGE
DEPARTMENT OF
PUBLIC WORKS
LEGEND
ACCESS POINT
POTENTIAL LAYDOWN AREA
POTENTIAL EMPLOYEE PARKING
SCALE: NTS 2 of 2
OC Loop Segment D Access, Staging & Parking
EXHIBIT 5
| Page 1 |
| Page 1 |
File details come from the government source that posted it. Updated .