Exhibit 4 - Other Permit Requirements.pdf
PDF 302 KB Posted
- Attached to
- BARC Skate Building Improvements Project
- Solicitation number
- 2025-03
- Issued by
- Lake Ketchum CDP, Washington
About this file
The document is a Permit Issuance Package from the King County Department of Local Services, Permitting Division, dated December 2023. It provides comprehensive instructions for construction permit holders on preparing for and scheduling inspections. The package outlines pre-construction requirements, including reviewing approved permits, noting working hours, understanding right-of-way connections, and acknowledging erosion and sediment control plans. Permit holders must obtain additional agency permits (such as NPDES, FPA, and HPA) and always call 811 before digging.
The document details multiple methods for scheduling, canceling, or rescheduling inspections, including phone (interactive response system at 206-971-9780), text (844-413-2653), and online through the King County Permits Portal. Inspection requests can be made up to five days in advance, with submissions before 3pm targeting next business day inspections. The package includes a comprehensive list of inspection codes for building, site, and fire-related inspections, along with express texting commands for managing inspection appointments. Key instructions emphasize ensuring construction sites and approved plans are fully accessible throughout the scheduled inspection day, with a warning that re-inspection fees may be charged if documents are unavailable during inspections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Bond Form.pdf | ||
| Bid Form.pdf | ||
| Contract.pdf | ||
| Exhibit 1b - Construction Plans.pdf | ||
| Exhibit 6 - Site Plan.pdf.crdownload | CRDOWNLOAD file | |
| Instructions to Bidders.pdf | ||
| Supplemental - References.pdf | ||
| Exhibit 1a - Construction Plans.pdf | ||
| Invitation to Bid.pdf | ||
| Exhibit 2 - Construction Permit.pdf | ||
| Exhibit 3 - Permit Conditions.pdf | ||
| Exhibit 5 - Trees to Be Removed.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Local Services, Permitting Division Page 1 of 3 www.kingcounty.gov
December 2023
Permit Issuance Package
Before construction
1. Make sure to review your approved permit, plans, and conditions where applicable.
a. Note the allowed working hours. See guidelines for construction noise:
www.kingcounty.gov/noise
b. Note the right-of-way connection detail.
c. Note the erosion & sediment control plan.
2. Obtain any permits required by other agencies and follow the conditions. (ex.
NPDES, FPA, & HPA)
3. Always call 811 before you dig.
• All documents must be available on site.
• Maintain documents to ensure durability through project completion.
• If documents are not available for scheduled inspections, re-inspection fees may be charged.
https://kingcounty.gov/depts/local-services/permits.aspx http://www.kingcounty.gov/ http://www.kingcounty.gov/noise
Permit issuance package, continued
Department of Local Services, Permitting Division Page 2 of 3 www.kingcounty.gov
Inspection scheduling instructions and codes
King County Permitting Self-Help Inspection Services Schedule – Cancel - Reschedule – Get results – Estimated arrival time
By phone Interactive response system
(206) 971-9780
Make a choice from the voice menu.
Follow voice prompts to enter your permit number, inspection code, contact number, and other details.
By Text
(844) 413-2653
Text “Schedule”, “Cancel”, “Reschedule” or “Results”
Text “List” for available inspection codes.
Follow the text prompts to enter your permit number, inspection code, and other details.
Online King County Permits website:
MyBuildingPermit.com (MBP):
King County Permits Portal
Inspection Scheduling - MBP
Search by your permit number and then follow the prompts to enter inspection code and other details.
Inspection help King County Permits inspection web page
Go to our website for more information
Turnaround Time for Inspection requests
• You can request an inspection up to five days in advance. Submit your request before 3pm to request next business day inspection.
• The number of requests received for any specific day can vary significantly. Due to this and other factors we may not be able to schedule your inspection on the date requested. An inspector will call you at the contact number you provide if we need to re-schedule the inspection.
• An estimated window of inspection time will be available by self-service after 8am. You may also receive an automated phone message of estimated inspection time if you provided a contact number.
Our inspectors cannot provide a guaranteed arrival time.
• Fire inspections: Inspection requests are not confirmed until you receive a call from the assigned inspector to schedule a specific date and time.
• Vashon: Available on Thursday’s only
• Please ensure your construction site and your approved plans are fully accessible throughout your scheduled inspection day.
https://kingcounty.gov/depts/local-services/permits.aspx http://www.kingcounty.gov/ https://aca-prod.accela.com/kingco/Default.aspx https://inspection.mybuildingpermit.com/ https://kingcounty.gov/en/dept/local-services/buildings-property/inspections/building-inspections https://kingcounty.gov/en/dept/local-services/buildings-property/inspections/building-inspections
Permit issuance package, continued
Department of Local Services, Permitting Division Page 3 of 3 www.kingcounty.gov
IVR (Interactive Voice Response) Inspection Scheduling Codes
Texting Express Commands
Schedule S [permit number] [inspection code] [date] [AM/PM]
Cancel C [permit number] [inspection code]
Reschedule RESCH [permit number] [inspection code] [date] [AM/PM]
Inspection Results R [permit number] [inspection Code]
Please ensure your construction site and your approved plans are fully accessible throughout your scheduled inspection day.
Building Building Fire
Structure Removed 222 Temporary Occupancy
299 Placement - Tank
Pole Hole and Punch Pad
292 Other 134 Device Placement
Pad Placement 142 Pool Structure 293 Nozzle/Head Placement
Foundation Footing 086 Barrier Fence 027 Flow/Trip Test 273
Foundation Walls 089 Structural 220 Device/Panel Test
Foundation 087 Insulation/Energy 060 Flush Test 274
Hold Downs and Skirting 277 Permit Extension Inspection
Run Test 191
Under floor Inspection 300 Site Inspection Pressure Test 168
Exterior Shear Wall 200 Pre-Construction Conference
160 Insulation Cover 280
Framing 090 Drainage BMP Installation
150 Rack/Pile Inspection
Mech./HVAC Inspection 282 Wet Season Construction
375 Emergency Shut Off
Interior Shear Wall 281 Final Inspection- Critical
350 Final Acceptance
Fire Rated Construction 082 Site Preparation 215 Other 134
Fire Inspection 266 Final site 355
Final Inspection 075 https://kingcounty.gov/depts/local-services/permits.aspx
File details come from the government source that posted it. Updated .