Exhibit 4 - Other Permit Requirements.pdf

PDF 302 KB Posted

Attached to
BARC Skate Building Improvements Project
Solicitation number
2025-03
Issued by
Lake Ketchum CDP, Washington

About this file

The document is a Permit Issuance Package from the King County Department of Local Services, Permitting Division, dated December 2023. It provides comprehensive instructions for construction permit holders on preparing for and scheduling inspections. The package outlines pre-construction requirements, including reviewing approved permits, noting working hours, understanding right-of-way connections, and acknowledging erosion and sediment control plans. Permit holders must obtain additional agency permits (such as NPDES, FPA, and HPA) and always call 811 before digging.

The document details multiple methods for scheduling, canceling, or rescheduling inspections, including phone (interactive response system at 206-971-9780), text (844-413-2653), and online through the King County Permits Portal. Inspection requests can be made up to five days in advance, with submissions before 3pm targeting next business day inspections. The package includes a comprehensive list of inspection codes for building, site, and fire-related inspections, along with express texting commands for managing inspection appointments. Key instructions emphasize ensuring construction sites and approved plans are fully accessible throughout the scheduled inspection day, with a warning that re-inspection fees may be charged if documents are unavailable during inspections.

View the file

Other files

File Type Posted
Bid Bond Form.pdf PDF
Bid Form.pdf PDF
Contract.pdf PDF
Exhibit 1b - Construction Plans.pdf PDF
Exhibit 6 - Site Plan.pdf.crdownload CRDOWNLOAD file
Instructions to Bidders.pdf PDF
Supplemental - References.pdf PDF
Exhibit 1a - Construction Plans.pdf PDF
Invitation to Bid.pdf PDF
Exhibit 2 - Construction Permit.pdf PDF
Exhibit 3 - Permit Conditions.pdf PDF
Exhibit 5 - Trees to Be Removed.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Local Services, Permitting Division Page 1 of 3 www.kingcounty.gov

December 2023

Permit Issuance Package

Before construction

1. Make sure to review your approved permit, plans, and conditions where applicable.

a. Note the allowed working hours. See guidelines for construction noise:

www.kingcounty.gov/noise

b. Note the right-of-way connection detail.

c. Note the erosion & sediment control plan.

2. Obtain any permits required by other agencies and follow the conditions. (ex.

NPDES, FPA, & HPA)

3. Always call 811 before you dig.

• All documents must be available on site.

• Maintain documents to ensure durability through project completion.

• If documents are not available for scheduled inspections, re-inspection fees may be charged.

https://kingcounty.gov/depts/local-services/permits.aspx http://www.kingcounty.gov/ http://www.kingcounty.gov/noise

Permit issuance package, continued

Department of Local Services, Permitting Division Page 2 of 3 www.kingcounty.gov

Inspection scheduling instructions and codes

King County Permitting Self-Help Inspection Services Schedule – Cancel - Reschedule – Get results – Estimated arrival time

By phone Interactive response system

(206) 971-9780

Make a choice from the voice menu.

Follow voice prompts to enter your permit number, inspection code, contact number, and other details.

By Text

(844) 413-2653

Text “Schedule”, “Cancel”, “Reschedule” or “Results”

Text “List” for available inspection codes.

Follow the text prompts to enter your permit number, inspection code, and other details.

Online King County Permits website:

MyBuildingPermit.com (MBP):

King County Permits Portal

Inspection Scheduling - MBP

Search by your permit number and then follow the prompts to enter inspection code and other details.

Inspection help King County Permits inspection web page

Go to our website for more information

Turnaround Time for Inspection requests

• You can request an inspection up to five days in advance. Submit your request before 3pm to request next business day inspection.

• The number of requests received for any specific day can vary significantly. Due to this and other factors we may not be able to schedule your inspection on the date requested. An inspector will call you at the contact number you provide if we need to re-schedule the inspection.

• An estimated window of inspection time will be available by self-service after 8am. You may also receive an automated phone message of estimated inspection time if you provided a contact number.

Our inspectors cannot provide a guaranteed arrival time.

• Fire inspections: Inspection requests are not confirmed until you receive a call from the assigned inspector to schedule a specific date and time.

• Vashon: Available on Thursday’s only

• Please ensure your construction site and your approved plans are fully accessible throughout your scheduled inspection day.

https://kingcounty.gov/depts/local-services/permits.aspx http://www.kingcounty.gov/ https://aca-prod.accela.com/kingco/Default.aspx https://inspection.mybuildingpermit.com/ https://kingcounty.gov/en/dept/local-services/buildings-property/inspections/building-inspections https://kingcounty.gov/en/dept/local-services/buildings-property/inspections/building-inspections

Permit issuance package, continued

Department of Local Services, Permitting Division Page 3 of 3 www.kingcounty.gov

IVR (Interactive Voice Response) Inspection Scheduling Codes

Texting Express Commands

Schedule S [permit number] [inspection code] [date] [AM/PM]

Cancel C [permit number] [inspection code]

Reschedule RESCH [permit number] [inspection code] [date] [AM/PM]

Inspection Results R [permit number] [inspection Code]

Please ensure your construction site and your approved plans are fully accessible throughout your scheduled inspection day.

Building Building Fire

Structure Removed 222 Temporary Occupancy

299 Placement - Tank

Pole Hole and Punch Pad

292 Other 134 Device Placement

Pad Placement 142 Pool Structure 293 Nozzle/Head Placement

Foundation Footing 086 Barrier Fence 027 Flow/Trip Test 273

Foundation Walls 089 Structural 220 Device/Panel Test

Foundation 087 Insulation/Energy 060 Flush Test 274

Hold Downs and Skirting 277 Permit Extension Inspection

Run Test 191

Under floor Inspection 300 Site Inspection Pressure Test 168

Exterior Shear Wall 200 Pre-Construction Conference

160 Insulation Cover 280

Framing 090 Drainage BMP Installation

150 Rack/Pile Inspection

Mech./HVAC Inspection 282 Wet Season Construction

375 Emergency Shut Off

Interior Shear Wall 281 Final Inspection- Critical

350 Final Acceptance

Fire Rated Construction 082 Site Preparation 215 Other 134

Fire Inspection 266 Final site 355

Final Inspection 075 https://kingcounty.gov/depts/local-services/permits.aspx

File details come from the government source that posted it. Updated .