Exhibit 2 - Construction Permit.pdf
PDF 107 KB Posted
- Attached to
- BARC Skate Building Improvements Project
- Solicitation number
- 2025-03
- Issued by
- Lake Ketchum CDP, Washington
About this file
This is a Construction Permit issued by the King County Department of Local Services for the Vashon Parks Tenant Improvement project located at 10500 SW 228th ST, Vashon, WA 98070. The permit (ADDC24-0584) authorizes improvements to the BARC Skate Park Building, which include enclosing the existing building by replacing chainlink fencing with wood framed walls, replacing translucent panels with metal siding, providing two egress doors with panic hardware, installing exit signage, making lighting improvements, and performing miscellaneous repairs. The project has a valuation of $78,000.00, with the permit issued on 06/03/2025 and set to expire on 6/3/2027.
The permit is for Tim Stapleton and applies to the parcel number 1822039116. The building will remain an unconditioned space, and a separate permit will be required for the ventilation system. The document outlines specific inspection requirements, including erosion control provisions, and notes that various inspections must be completed, such as site preparation, foundation, framing, HVAC, and final building inspection. The permit emphasizes that King County's inspections are spot checks designed to encourage code compliance, and the responsibility for meeting all applicable codes rests with the permit applicant, their agents, and the property owners.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 3 - Permit Conditions.pdf | ||
| Exhibit 4 - Other Permit Requirements.pdf | ||
| Exhibit 5 - Trees to Be Removed.pdf | ||
| Exhibit 1a - Construction Plans.pdf | ||
| Invitation to Bid.pdf | ||
| Bid Bond Form.pdf | ||
| Bid Form.pdf | ||
| Contract.pdf | ||
| Exhibit 1b - Construction Plans.pdf | ||
| Exhibit 6 - Site Plan.pdf.crdownload | CRDOWNLOAD file | |
| Instructions to Bidders.pdf | ||
| Supplemental - References.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Local Services
Permits
919 SW Grady Way, Suite 300
Renton, WA 98057
CONSTRUCTION PERMIT
Permit type, Subtype:
Title:
Description:
Permit Number:
Date Issued:
Expiration Date:
Permit Status:
ADDC24-0584Addition-Improvement, Tenant
(PRO) VASHON PARKS - TENANT IMPROVEMENT -
BARC Skate Park Building Improvements
06/03/2025
6/3/2027
Permit Issued
Enclose existing building by replacing chainlink fencing with wood framed walls, replace existing translucent panels with metal siding, provide two egress doors with panic hardware, install exit signage, lighting improvements, and miscellaneous repairs. Required ventilation system to be submitted under separate permit. Building to remain unconditioned space.
1822039116List of Parcels:
Site Address:
Valuation:
Applicant Name:
10500 SW 228TH ST, VASHON, WA 98070
$78,000.00
Applicant Address: PO BOX 1608 VASHON, WA 98070
TIM STAPLETON
Comments and Conditions
1. Work Subject to Approved Plans and Conditions. Work Authorized by this permit is subject to the approved plans and corrections shown thereon and the attached conditions of permit approval. Failure to comply with all conditions once construction is begun may necessitate an immediate work stoppage until such time as compliance with the stipulated conditions is attained.
2. Posting on the job site. This permit must be posted on the job site at all times in a visible and readily accessible location.
3. Inspections Scheduling, Estimated Arrival Times* & Results. (*Building only)
Online: IVR: 206-971-9780 Text: 1-844-413-2653
For IVR Codes & Instructions:
Inspection cutoff: 3:00 pm for next day inspections. Fire Inspection and land use requests will be confirmed and scheduled by a return phone call.
4. Expiration. Please note the expiration date on this permit located in the upper right corner. Permit extension requests may be considered in accordance with current King County Code.. Work must be substantially commenced within two years of permit issuance. Extensions beyond the third year shall only be granted to allow completion of the structure.
5. Compliance with State and Federal laws and the Endangered Species Act. The applicant is responsible for making a diligent inquiry regarding the need for concurrent state or federal permits to engage in the Work requested under this permit, and to obtain the required permits prior to issuance of this permit. It is understood that the granting of this permit shall not be construed as satisfying the requirements of other applicable Federal, State or Local laws or regulations. In addition this permit does not authorize the violation of regulations. In addition, the granting of this permit does not authorize the violation such "take" restrictions would be violated by work done pursuant to this permit, and is precluded by Federal law from undertaking work authorized by this permit if that work would violate the "take" restrictions set forth at 16 U.S.C. 8, 50 C.F.R. §17.21, 50 C.F.R. §223 and 50 C.F.R §224.
https://www.kingcounty.gov/depts/local-services/permits/permits-inspections/inspections.aspx aca-prod.accela.com/kingco/ aaf-all-0026 Page 1 of 2printed: 6/3/2025 https://www.kingcounty.gov/depts/local-services/permits/permits-inspections/inspections/building-inspections.aspx
INSPECTIONS
Approvals: (Inspection codes for use with the DLS Permits voice Inspection Line)
EROSION CONTROL PROVISIONS SHALL BE IN PLACE PRIOR TO AND DURING CONSTRUCTION
See reverse side for scheduling and accessing inspection results
All Permits:
a) Responsibility for the building's compliance with the provisions of the applicable King County Codes and for maintenance of the building rests exclusively with the permit applicants and their agents and the property owners.
b) King County inspection of the building and real property are spot checks designed to foster and encourage compliance with the applicable codes. Neither the approvals above nor the issuance of a Certificate of Occupancy guarantees or assures compliance with all applicable codes.
c) The owner's copy of any applicable manufacturer's installation instructions shall be available to the inspector at the time of the inspection.
*SINGLE FAMILY PERMITS
Permission to occupy structures for residential use is authorized upon final building inspection approval.
COMMERCIAL / MULTI-FAMILY PERMITS:
No occupancy of commercial or multi-family structures is permitted until a separate "Certificate of Occupancy" has been issued.
Department of Local Services
Permits
919 SW Grady Way, Suite 300
Renton, WA 98057
Permit: ADDC24-0584
1. Site Preparation (215)
Notes:
3. Critical Areas (350) 4. Final Site (355)
5. Foundation (087) 6. Under Floor (300) 7. Exterior Shear (200) 8. Framing (090)
By: By: By: By:
By: By: By: By:
9. Insulation Inspection
(060)
10. HVAC (282) 11. Fire Inspection (266)
By: By: By:
12. Final Building* (075)
2. Drainage BMP (150)
By:
Approved plans, documents and this Inspection Record Card must be at the job site for all requested inspections aaf-all-0026 Page 2 of 2printed: 6/3/2025
File details come from the government source that posted it. Updated .