Exhibit 4 List of Improvements and Areas of Concern.pdf
PDF 106 KB Posted
- Solicitation number
- 246-25-Q-0006
About this file
This document is a federal contract opportunity issued by the Department of Health and Human Services Indian Health Service for an archaeological field inspection and report in Pawhuska, Oklahoma. The solicitation, identified as RFQ 246-25-Q-0006, is a 100% small business set-aside under NAICS code 541620 with a size standard of $19 million.
The contractor will be required to perform an archaeological field inspection and provide a report for sewer mains and manholes in the Pawhuska Indian Village. The period of performance is 60 calendar days from notice to proceed. Key dates include a mandatory site visit on November 18, 2024, with questions due by November 25, 2024, and quotes due by December 3, 2024. The contract award will be made to the responsible, responsive offeror providing the lowest reasonable price and meeting all technical specifications. Quotes will be evaluated on an acceptable/unacceptable basis, with unacceptability of the price quote or technical specifications rendering the entire quote unacceptable.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Street Name
Length Water Main Linear Feet
New Manholes
Boundary Ave. 1274 2 Little Wing Ave. -South 830 2 Little Wing Ave. -North 541 2 Thunder Fear Rd. 894 2 Whitehorn Ln.-North 138 1 Red Eagle Dr.-North 832 2 Red Eagle Dr.-South 356 0 Baconrind Dr. 212 0 Eaglechief Street 270 1 Fire Eagle St. 517 0 War Chief 595 2 Lookout St. 2180 8 Lookout St.-Line South Between Brave Rd. and Whitehorn Ln. 328 1 Lookout St.-Line South between Baconrind Dr. and Red Eagle Dr. 212 1 Wakon Iron Blvd. 1375 3 E. 21st Street 1303 5 Northeast from E. 21st Street along west side of Joh Dahl Ave. (Hwy 60) to south of Lookout St. 2145 7 Total 14002 39
Areas of Concern
Area of Concern-Replacement Water Mains:
(14,002 LF)(10 LF)=140,020 ft2/43560 ft2/Ac=3.21 Ac
Area of Concern-New Manholes:
((8 ft)(8 ft)(39) =2496 ft2/43560 ft2/Ac=0.057 Ac
EXHIBIT 4