Exhibit 3 Power Plant Equipment.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
WATER TREATMENT PROGRAM
Solicitation number
BPM053989
Issued by
Baltimore County, Maryland

About this file

This file is an equipment inventory exhibit supporting Towson University's Invitation for Bids for a water treatment program in Maryland. The exhibit provides detailed specifications for the central power plant equipment that will require chemical treatment services under the contract, including five boilers, five chillers, and associated cooling tower systems. Boiler equipment ranges from vintage units manufactured between 1991 and 1995 with tonnages of 600–1200, to a newer 2021 Williams and Davis unit with 400 tonnage. The five Trane chillers, manufactured between 2002 and 2008, range from 750 to 1500 tonnage capacity. The cooling tower system is an Evaptech EC424 model. The contract scope requires the successful bidder to furnish all equipment, chemicals, and services necessary to provide comprehensive chemical treatment to the central power plant boilers and condensate systems, outlying boilers, cooling towers, and closed water systems, including control testing, chemical additions, equipment monitoring, and maintenance of water chemistry and usage records.

No pricing information, response deadlines, site visit requirements, bidder conference details, award dates, contract terms, or renewal options are specified in this equipment inventory exhibit. The file serves solely as a technical reference document establishing the existing infrastructure requiring treatment services under the Towson University water treatment program procurement.

View the file

Other files

File Type Posted
TU-2608 Questions and response No.1 IFB Water Treatment.pdf PDF
AMENDMENT No 2.pdf PDF
Test Results (Exhibit 4)_12..pdf PDF
AMENDMENT No 1.pdf PDF
TU-2608 Water Treatment Program Final.pdf PDF
Exhibit 2 Building SQ Footage.pdf PDF
AMENDMENT No 3.pdf PDF
Exhibit 1 Water Summary Demand.pdf PDF
Amendment_No_5.pdf PDF
Amendment No 4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Power Plant Equipment

Equipment Make Model # Serial # Tonnage Horsepower Year

Boiler #1English Boiler and Tube, IncNone94-16512001995
Boiler #2Cleaver BrooksCB 200-600L-902646001991
Boiler #3Cleaver BrooksCB 200-600L-902626001991
Boiler #4Cleaver BrooksCB 200-600L-902636001991
Boiler #5Williams and Davis4300D-150S108064002021
Chiller #1Trane CenTraVacCVHF770L02L214777502002
Chiller #2Trane CenTraVacCVHF770L02L214817502002
Chiller #3Trane CenTraVacCVHF1470L07L0549415002008
Chiller #4Trane CenTraVacCVHF1470L07L0537515002008
Chiller #5Trane CenTraVacCVHF1470L08K0472815002008
Cooling TowersEvaptechEC4246-3051322008

File details come from the government source that posted it. Updated .