Exhibit 2 - Priority Area Map.pdf
PDF 2 MB Posted
- Attached to
- Camp Rilea Invasive Scotch Broom Control
- Solicitation number
- S-24800-00014699
- Issued by
- Clatsop County, Oregon
About this file
This is a geospatial map produced collaboratively by Esri, NASA, NGA, USGS, Oregon State Parks, State of Oregon GEO, and WA State Parks GIS, depicting the Scotch Broom treatment priority areas at Camp Rilea, a military installation. The map identifies three distinct treatment zones: Priority Area 1 covering 58.4 acres, Priority Area 2 spanning 101.8 acres, and Additional Scotch Broom Areas totaling 226.4 acres, with a comprehensive treatment area of 386.7 total acres. The map is dated 14 August 2025 and uses the NAD 1983 UTM Zone 10N coordinate system.
The map includes a detailed site boundary, SDZ (Safety/Security) extent, and highlights wetlands and water bodies with a 3-foot buffer zone. The color-coded areas (green, orange, and yellow) represent different treatment priority levels across the landscape. A small inset map shows the location of Camp Rilea near Warrenton and Sunset Beach in Oregon. The map provides precise scale measurements in both meters and feet, and includes a north-facing orientation indicator. The document appears to be a strategic planning tool for invasive Scotch Broom vegetation management, likely as part of an environmental conservation or military installation maintenance project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 200100 Meters
0 800400 Feet
Map Date: 14 August 2025 Map Author: Carl Anderson Coordinate System: NAD 1983 UTM Zone 10N
Esri, NASA, NGA, USGS, Oregon State Parks, State of Oregon GEO, WA State Parks GIS, Esri, TomTom, Garmin, SafeGraph, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, USDA, USFWS, Maxar
Camp Rilea Scotch Broom Proposed Treatment Priority Areas 1 and 2
Legend
Site Boundary
SDZ Extent
Wetlands / Water Bodies with 3 ft Buffer
Scotch Broom Treatment Priorities: 386.7 Total Acres
Priority Area 1: 58.4 Acres
Priority Area 2:
101.8 Acres
Additional Scotch Broom Areas: 226.4 Acres
File details come from the government source that posted it. Updated .