About this file

This document appears to be an exhibit containing plans for a state and local contract opportunity to add point to multipoint wireless access control to an existing automated cantilever gate and building entry points at multiple locations in Oregon. The project scope includes installing new underground data conduits, relocating cameras, adding card readers, and installing concealed desk door release buttons at offices. The work is to be performed on a maintenance building, fuel building, and a building with a data/communication room at the mezzanine level. The document provides drawings and notes for reference, indicating the locations of doors, electrical panels, and other relevant features.

The contract opportunity is for the ESB Lenel Access Security project, which involves jurisdictions in Clackamas County, Eugene City, and San Marine CDP. The document does not provide specific pricing terms, set asides, incumbents, funding requirements, or other salient financial information.

View the file

Other files

File Type Posted
ESB_V2_RFCQ_Attachmnt_279CFinal.docx DOCX document
Exhibit 1 Technical Specifications~9.pdf PDF
ESB_V2_RFCQ_279CFinal.docx DOCX document
Attachment B Plans~2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E (2) TWO DOORS FOR ACCESS

READERS THIS BUILDING

NOTE TO BIDDERS - THIS 05/09/22 DRAWING IS FOR REFERENCE ONLY

TO SHOW THE BUILDING AND GATE PEDESTAL SCHEDULED FOR WORK

E GATE PEDESTAL

LOCATION

EXIST 4" CONDUIT

SLEEVE UNDER

DRIVE ENTRANCE

NEW 1" UNDERGROUND

DATA CONDUIT RUN FROM

OFFICE TO GATE MOTOR &

GATE MOTOR TO PEDESTAL;

RUN 1" THROUGH 4" SLEEVE

EXIST GATE

MOTOR

NOTE TO BIDDERS - THIS 08/31/22 DRAWING IS FOR REFERENCE

ONLY TO SHOW THE BUILDING AND GATE PEDESTAL SCHEDULED

FOR WORK

E CAMERA - RELOCATE HIGHER ON TRIM;

INSTALL AT EYE LEVEL, COORDINATE HEIGHT

WITH OWNER.

INSTALL NEW CARD READER OVER E

THROUGH HOLE AT TRIM.

RED CIRCLED AREAS ARE E DOORS

SCHEDULED FOR NEW CARDREADERS,

TYPICAL OF TWO (2) THIS BUILDING.

EXTERIOR AND INTERIOR DOORS AND

FRAMES ARE METAL.

LENEL PANEL SHALL BE LOCATED IN

THIS AREA. CONTRACTOR CAN

MOUNT TO EXISTING PANEL BOARD

TWO (2) CONCEALED DESK DOOR

RELEASE BUTTONS INSTALLED AT

OFFICES TO OPERATE MAIN

EXTERIOR DOOR. COORDNATE

LOCATION WITH OWNER.

MAINTENANCE BUILDING

- TWO (2) DOORS

NOTE TO BIDDERS - THIS 1996 DRAWING IS

FOR REFERENCE ONLY TO SHOW THE

BUILDING SCHEDULED FOR ACCESS WORK

NOTE TO BIDDERS - THIS 1996 DRAWING

IS FOR REFERENCE ONLY TO SHOW

LOCATION OF DOORS AND DATA/

COMMUNICATION ROOM

RED CIRCLED DOORS ARE E

DOORS SCHEDULED FOR NEW

CARDREADERS, TYPICAL OF TWO

(2) THIS BUILDING.

EXTERIOR DOORS AND FRAMES

ARE METAL

DATA/ COMMUNICATION ROOM

IS AT MEZZANINE LEVEL OVER

THE WOMEN'S ROOM.

EXISTING LENEL PANEL IS

LOCATED AT DATA/

COMMUNICATION ROOM

STAIR LOCATION TO DATA/

COMMUNICATION ROOM

S T

A

IR

S

E THROUGH WALL

CONDUIT TO SHOP FOR

CABLING

NOTE TO BIDDERS - THIS 1996 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL SPACE OF BUILDING

NOTE TO BIDDERS - THIS 1999 DRAWING IS

BUILDINGS SCHEDULED FOR ACCESS WORK

MAINTENANCE BUILDING -

E FOUR (4) DOORS

FUEL BUILDING -

E ONE (1) DOOR

SEE ELECTRICAL

SITE PLAN FOR NEW

UNDERGROUND

CONDUIT RUNS

DATA/ COMMUNICATION ROOM AT

MEZZANINE - NEW LENEL PANEL TO

MOUNTED TO EXISTING PANEL BOARD

RED CIRCLED DOORS ARE DOORS

SCHEDULED FOR NEW

CARDREADERS, TYPICAL OF FOUR

(4) THIS BUILDING.

EXTERIOR DOORS ARE METAL,

INTERIOR DOORS ARE WOOD, AND

ALL DOOR FRAMES ARE METAL

NOTE TO BIDDERS - THIS 1999 DRAWING IS

FOR REFERENCE ONLY TO SHOW

LOCATION OF DOORS AT THE

MAINTENANCE BUILDING, DATA/

COMMUNICATION ROOM, & ELECT PANELS

E ELECTRICAL

DISTRIBUTION

PANELS THIS AREA -

SEE ELECT PLAN

FOR REFERENCE ONLY TO SHOW LOCATION

OF DATA/ COMMUNICATION ROOM & TO

SHOW THE GENERAL SPACE OF BUILDING

DATA/ COMMUNICATION

ROOM AT MEZZANINE

FOR REFERENCE ONLY TO SHOW LOCATION

OF DATA/ COMMUNICATION ROOM & TO

SHOW THE GENERAL SPACE OF BUILDING

DATA/ COMMUNICATION

ROOM AT MEZZANINE

RED CIRCLED DOOR IS DOOR

SCHEDULED FOR NEW

CARDREADER, TYPICAL OF

ONE (1) THIS BUILDING.

EXTERIOR DOOR AND FRAME

ARE METAL

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW

LOCATION OF DOOR AT FUEL BUILDING

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL SPACE OF BUILDING

GENERAL LOCATION OF CONDUIT.

NEW 1" UNDERGROUND DATA

CONDUIT RUN FROM

MAINTENANCE BUILDING TO

FUEL BUILDING

E ELECTRICAL

DISTRIBUTION

PANELS THIS AREA

DATA/ COMMUNICATION ROOM AT

MEZZANINE - NEW LENEL PANEL TO

MOUNT TO EXISTING PANEL BOARD

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL LOCATION OF DATA ROOM &

ELECTICAL PANELS.