Exhibit 2 Plans~10.pdf
PDF 5 MB Posted
- Attached to
- ESB Lenel Access Security
- Solicitation number
- S-73000-00008699
- Issued by
- Clackamas County, Enterprise City, Oregon
About this file
This document appears to be an exhibit containing plans for a state and local contract opportunity to add point to multipoint wireless access control to an existing automated cantilever gate and building entry points at multiple locations in Oregon. The project scope includes installing new underground data conduits, relocating cameras, adding card readers, and installing concealed desk door release buttons at offices. The work is to be performed on a maintenance building, fuel building, and a building with a data/communication room at the mezzanine level. The document provides drawings and notes for reference, indicating the locations of doors, electrical panels, and other relevant features.
The contract opportunity is for the ESB Lenel Access Security project, which involves jurisdictions in Clackamas County, Eugene City, and San Marine CDP. The document does not provide specific pricing terms, set asides, incumbents, funding requirements, or other salient financial information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESB_V2_RFCQ_Attachmnt_279CFinal.docx | DOCX document | |
| Exhibit 1 Technical Specifications~9.pdf | ||
| ESB_V2_RFCQ_279CFinal.docx | DOCX document | |
| Attachment B Plans~2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E (2) TWO DOORS FOR ACCESS
READERS THIS BUILDING
NOTE TO BIDDERS - THIS 05/09/22 DRAWING IS FOR REFERENCE ONLY
TO SHOW THE BUILDING AND GATE PEDESTAL SCHEDULED FOR WORK
E GATE PEDESTAL
LOCATION
EXIST 4" CONDUIT
SLEEVE UNDER
DRIVE ENTRANCE
NEW 1" UNDERGROUND
DATA CONDUIT RUN FROM
OFFICE TO GATE MOTOR &
GATE MOTOR TO PEDESTAL;
RUN 1" THROUGH 4" SLEEVE
EXIST GATE
MOTOR
NOTE TO BIDDERS - THIS 08/31/22 DRAWING IS FOR REFERENCE
ONLY TO SHOW THE BUILDING AND GATE PEDESTAL SCHEDULED
FOR WORK
E CAMERA - RELOCATE HIGHER ON TRIM;
INSTALL AT EYE LEVEL, COORDINATE HEIGHT
WITH OWNER.
INSTALL NEW CARD READER OVER E
THROUGH HOLE AT TRIM.
RED CIRCLED AREAS ARE E DOORS
SCHEDULED FOR NEW CARDREADERS,
TYPICAL OF TWO (2) THIS BUILDING.
EXTERIOR AND INTERIOR DOORS AND
FRAMES ARE METAL.
LENEL PANEL SHALL BE LOCATED IN
THIS AREA. CONTRACTOR CAN
MOUNT TO EXISTING PANEL BOARD
TWO (2) CONCEALED DESK DOOR
RELEASE BUTTONS INSTALLED AT
OFFICES TO OPERATE MAIN
EXTERIOR DOOR. COORDNATE
LOCATION WITH OWNER.
MAINTENANCE BUILDING
- TWO (2) DOORS
NOTE TO BIDDERS - THIS 1996 DRAWING IS
FOR REFERENCE ONLY TO SHOW THE
BUILDING SCHEDULED FOR ACCESS WORK
NOTE TO BIDDERS - THIS 1996 DRAWING
IS FOR REFERENCE ONLY TO SHOW
LOCATION OF DOORS AND DATA/
COMMUNICATION ROOM
RED CIRCLED DOORS ARE E
DOORS SCHEDULED FOR NEW
CARDREADERS, TYPICAL OF TWO
(2) THIS BUILDING.
EXTERIOR DOORS AND FRAMES
ARE METAL
DATA/ COMMUNICATION ROOM
IS AT MEZZANINE LEVEL OVER
THE WOMEN'S ROOM.
EXISTING LENEL PANEL IS
LOCATED AT DATA/
COMMUNICATION ROOM
STAIR LOCATION TO DATA/
COMMUNICATION ROOM
S T
A
IR
S
E THROUGH WALL
CONDUIT TO SHOP FOR
CABLING
NOTE TO BIDDERS - THIS 1996 DRAWING
IS FOR REFERENCE ONLY TO SHOW THE
GENERAL SPACE OF BUILDING
NOTE TO BIDDERS - THIS 1999 DRAWING IS
BUILDINGS SCHEDULED FOR ACCESS WORK
MAINTENANCE BUILDING -
E FOUR (4) DOORS
FUEL BUILDING -
E ONE (1) DOOR
SEE ELECTRICAL
SITE PLAN FOR NEW
UNDERGROUND
CONDUIT RUNS
DATA/ COMMUNICATION ROOM AT
MEZZANINE - NEW LENEL PANEL TO
MOUNTED TO EXISTING PANEL BOARD
RED CIRCLED DOORS ARE DOORS
SCHEDULED FOR NEW
CARDREADERS, TYPICAL OF FOUR
(4) THIS BUILDING.
EXTERIOR DOORS ARE METAL,
INTERIOR DOORS ARE WOOD, AND
ALL DOOR FRAMES ARE METAL
NOTE TO BIDDERS - THIS 1999 DRAWING IS
FOR REFERENCE ONLY TO SHOW
LOCATION OF DOORS AT THE
MAINTENANCE BUILDING, DATA/
COMMUNICATION ROOM, & ELECT PANELS
E ELECTRICAL
DISTRIBUTION
PANELS THIS AREA -
SEE ELECT PLAN
FOR REFERENCE ONLY TO SHOW LOCATION
OF DATA/ COMMUNICATION ROOM & TO
SHOW THE GENERAL SPACE OF BUILDING
DATA/ COMMUNICATION
ROOM AT MEZZANINE
FOR REFERENCE ONLY TO SHOW LOCATION
OF DATA/ COMMUNICATION ROOM & TO
SHOW THE GENERAL SPACE OF BUILDING
DATA/ COMMUNICATION
ROOM AT MEZZANINE
RED CIRCLED DOOR IS DOOR
SCHEDULED FOR NEW
CARDREADER, TYPICAL OF
ONE (1) THIS BUILDING.
EXTERIOR DOOR AND FRAME
ARE METAL
NOTE TO BIDDERS - THIS 1999 DRAWING
IS FOR REFERENCE ONLY TO SHOW
LOCATION OF DOOR AT FUEL BUILDING
NOTE TO BIDDERS - THIS 1999 DRAWING
IS FOR REFERENCE ONLY TO SHOW THE
GENERAL SPACE OF BUILDING
GENERAL LOCATION OF CONDUIT.
NEW 1" UNDERGROUND DATA
CONDUIT RUN FROM
MAINTENANCE BUILDING TO
FUEL BUILDING
E ELECTRICAL
DISTRIBUTION
PANELS THIS AREA
DATA/ COMMUNICATION ROOM AT
MEZZANINE - NEW LENEL PANEL TO
MOUNT TO EXISTING PANEL BOARD
NOTE TO BIDDERS - THIS 1999 DRAWING
IS FOR REFERENCE ONLY TO SHOW THE
GENERAL LOCATION OF DATA ROOM &
ELECTICAL PANELS.
F24320 - 01_ESTACADA OFFICE REMODEL_AS-BUILTS A101 (1).pdf
File details come from the government source that posted it. Updated .