Exhibit 2 - Bid Form A & Scope of Work.xlsx
XLSX spreadsheet 3 MB Posted
- Attached to
- Scotia & Cliffton Park, NY - Multiple Warning Device Upgrades and Surface Replacements on the PAS_BERX
- Solicitation number
- 2117372
- Issued by
- Saratoga County, Schenectady County, Cheektowaga CDP, New York
About this file
This is a bid form and scope of work document for the Berkshire & Eastern Railroad (BERX) covering multiple warning device upgrades and surface replacements at six railroad crossings in Scotia and Clifton Park, NY. The project encompasses warning system upgrades and surface reconstruction at Vley Road (MP 7.00), SR 147/Sacandaga Road (MP 7.57), Freemans Bridge Road (MP 5.59), Air National Guard Road (MP 4.30), Ashdown Road (MP 0.79), and Blue Barns Road (MP 1.80). The scope includes full reconstruction of crossing surfaces with 32-40 track feet per location, including demolition, installation of sub-ballast, fabric, drainage systems, ballast, cross-ties, concrete panel surfaces, and 115RE rail.
The bid form requires contractors to provide separate material and labor/equipment unit costs for each location's warning system upgrades, surface maintenance of traffic, and surface reconstruction work. Additional requirements include coordination with NYDOT and local authorities for road closures, traffic control, installation of asphalt approaches, and removal of scrap materials. The project also requires RPL insurance coverage and includes provisions for sales tax. Contractors must submit their bids in Excel format with their company name clearly indicated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form A
Scotia & Cliffton Park, NY - Multiple Warning Device Upgrades and Surface Replacements on the PAS_BERX:
Warning Device Upgrades and Surface Replacement at Vley Road – 052571M – PIN# 1933.53 - MP 7.00; PAS-0000083; PSR-0000023 Warning Device Upgrades and Surface Replacement at SR 147 (Sacandaga Road) - 052572U – PIN# 1933.52 - MP 7.57; PAS-0000085; PSR-0000025 Warning Device Upgrades at SR 911F (Freemans Bridge Road) - 052569L – PIN 1933.54 - MP 5.59; PAS-0000088; PSR-0000029 Warning Device Installation and Surface Replacement at Air National Guard Road (CR 14) - 052567X – PIN# 1933.47 - MP 4.30; PAS-0000082; PSR-0000022 Warning Device Installation at Ashdown Road, MP 0.79 - 052563V; PIN # 1933.45; PAS-000008; PSR-0000028
| Warning Device Installation and Surface Replacement at Blue Barns Road (CR 110), MP 1.80 - 052564; PIN # 1933.46; PAS-0000084; PSR-0000024 | Bid Form A | ||||||||||
| Bid Form A | |||||||||||
| INSERT BIDDER NAME HERE | Material Unit Cost | Labor & Equip Unit Cost | Total | ||||||||
| Item | Project | Location | Description | Qty. | UoM | ||||||
| 1 | 1 | PAS-0000083 PSR-0000023 | Google Maps Link | Highway Grade Crossing Warning System Upgrade per attached Scope of Work - Vley Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||
| 2 | PAS-0000083 PSR-0000023 | Crossing Surface Maintenance of Traffic - Vley Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 3 | PAS-0000083 PSR-0000023 | Crossing Surface Reconstruction - Vley Road | 40 | TF | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 4 | PAS-0000085 PSR-0000025 | Google Maps Link | Highway Grade Crossing Warning System Upgrade per attached Scope of Work - Sacandaga Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | |||
| 5 | PAS-0000085 PSR-0000025 | Crossing Surface Maintenance of Traffic - Sacandaga Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 6 | PAS-0000085 PSR-0000025 | Crossing Surface Reconstruction - Sacandaga Road | 40 | TF | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 7 | PAS-0000088 PSR-0000029 | Google Maps Link | Highway Grade Crossing Warning System Upgrade per attached Scope of Work - Freemans Bridge Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | |||
| 8 | PAS-0000082 PSR-0000022 | Google Maps Link | Highway Grade Crossing Warning System Upgrade per attached Scope of Work | ||||||||
| Air National Guard Road (CR-14) | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||||
| 9 | PAS-0000082 PSR-0000022 | Crossing Surface Maintenance of Traffic | |||||||||
| Air National Guard Road (CR-14) | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||||
| 10 | PAS-0000082 PSR-0000022 | Crossing Surface Reconstruction | |||||||||
| Air National Guard Road (CR-14) | 40 | TF | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||||
| 11 | PAS-000008 PSR-0000028 | Google Maps Link | Highway Grade Crossing Warning System Upgrade per attached Scope of Work - Ashdown Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | |||
| 12 | PAS-000008 PSR-0000028 | Crossing Surface Maintenance of Traffic - Ashdown Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 13 | PAS-000008 PSR-0000028 | Crossing Surface Reconstruction - Ashdown Road | 32 | TF | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 14 | PAS-0000084 PSR-0000024 | Google Maps Link | Highway Grade Crossing Warning System Upgrade per attached Scope of Work - Blue Barns Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | |||
| 15 | PAS-0000084 PSR-0000024 | Crossing Surface Maintenance of Traffic - Blue Barns Road | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 16 | PAS-0000084 PSR-0000024 | Crossing Surface Reconstruction - Blue Barns Road | 32 | TF | Enter Price or N/A | Enter Price or N/A | $0.00 | ||||
| 41 | 17 | PAS-0000083 PSR-0000023, |
PAS-0000085 PSR-0000025,
PAS-0000088 PSR-0000029,
PAS-0000082 PSR-0000022,
PAS-000008 PSR-0000028,
| PAS-0000084 PSR-0000024 | RPL Insurance | 1 | LS | Enter Price or N/A | Enter Price or N/A | $0.00 |
| 18 | PAS-0000083 PSR-0000023, |
PAS-0000085 PSR-0000025,
PAS-0000088 PSR-0000029,
PAS-0000082 PSR-0000022,
PAS-000008 PSR-0000028,
| PAS-0000084 PSR-0000024 | Sales Tax | 1 | Enter Price or N/A | Enter Price or N/A | $0.00 | |
| $0.00 |
| 3 | |
| 41 | |
| Please fill out and return as an Excel file, not a PDF. |
Please fill out and return as an Excel file, not a PDF.
INSERT BIDDER NAME BEFORE ENTERING BID AMOUNTS. DELETE THIS BOX PRIOR TO SUBMITTING BID.
https://goo.gl/maps/WGNSYP2H3XF2https://maps.app.goo.gl/dibKsEwqzNsJ38826https://maps.app.goo.gl/UCSDrKGq7M9jHFwk9https://goo.gl/maps/XTEizrrqAw82https://goo.gl/maps/cBQB42HVWZphttps://goo.gl/maps/WGAsM3DvhvQ2https://goo.gl/maps/LYaFKYmL6ZR2https://maps.app.goo.gl/PscTGuEyAKQyi7ZU9https://maps.app.goo.gl/SVrmFGZ38Fhx8SYN7https://maps.app.goo.gl/4g2WLC4Ps9d1LxNb6https://maps.app.goo.gl/oyBN8mo8XDqjcNRv6 Signal Scope and Specifications
| See: |
| Exhibit 2a - Signal Survey & Plans |
Surface Scope of Work
CONTRACTOR SCOPE OF WORK
| ENGINEERING GROUP | |||||||||||
| Region | Railroad Name | Railroad Acronym | Project | Project Category | Project Number | Description of Services | Additional Scope of Services | QTY | U/M | Site Name (Sub, Yard, Track, Crossing ID, etc.) | MISC NOTES |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000083; PSR-0000023 | Crossing Surface Maintenance of Traffic | Coordinate with NYDOT, local roadway authority, and local emergency services for road closure and detour development. Establish work zone and install traffic control signage prior to beginning surface work. Remove work zone and traffic control signage upon surface completion. All aspects of Maintenance of Traffic are responsibility of contractor. Includes any closure permits and associated fees. | 1 | LS | Scotia, NY - Vley Road 052571M – MP 7.00 | ||
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000083; PSR-0000023 | Crossing Surface Reconstruction | Full reconstruction of at-grade crossing surface including demolition of existing roadway approach, crossing surface, track, and excavation 18" below bottom of tie. Installation of 6" sub-ballast, fabric, drain system, 12" ballast, 10' cross-ties under surface panels, OTM, Concrete panel crossing surface, 115RE rail, all welds, approach ballast replacement, grading to provide positive drainage away from crossing, and all ancillary work associated with crossing reconstruction. Provide and install asphalt approaches a minimum of 5' from edge of crossing. Remove any scrap ties and rail from the RR RoW on crossing approach in each direction. | 40 | TF |
*Contractor to verify quantities on site
| Region | Railroad Name | Railroad Acronym | Project | Project Category | Project Number | Description of Services | Additional Scope of Services | QTY | U/M | Site Name (Sub, Yard, Track, Crossing ID, etc.) |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000085; PSR-0000025 | Crossing Surface Maintenance of Traffic | Coordinate with NYDOT, local roadway authority, and local emergency services for road closure and detour development. Establish work zone and install traffic control signage prior to beginning surface work. Remove work zone and traffic control signage upon surface completion. All aspects of Maintenance of Traffic are responsibility of contractor. Includes any closure permits and associated fees. | 1 | LS | Scotia, NY - SR 147 (Sacandaga Road) 052572U - MP 7.57 | |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000085; PSR-0000025 | Crossing Surface Reconstruction | Full reconstruction of at-grade crossing surface including demolition of existing roadway approach, crossing surface, track, and excavation 18" below bottom of tie. Installation of 6" sub-ballast, fabric, drain system, 12" ballast, 10' cross-ties under surface panels, OTM, Concrete panel crossing surface, 115RE rail, all welds, approach ballast replacement, grading to provide positive drainage away from crossing, and all ancillary work associated with crossing reconstruction. Provide and install asphalt approaches a minimum of 5' from edge of crossing. Remove any scrap ties and rail from the RR RoW on crossing approach in each direction. | 40 | TF | ||
| Region | Railroad Name | Railroad Acronym | Project | Project Category | Project Number | Description of Services | Additional Scope of Services | QTY | U/M | Site Name (Sub, Yard, Track, Crossing ID, etc.) |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000082; PSR-0000022 | Crossing Surface Maintenance of Traffic | Coordinate with NYDOT, local roadway authority, and local emergency services for road closure and detour development. Establish work zone and install traffic control signage prior to beginning surface work. Remove work zone and traffic control signage upon surface completion. All aspects of Maintenance of Traffic are responsibility of contractor. Includes any closure permits and associated fees. | 1 | LS | Scotia, NY - Air National Guard Road (CR 14) 052567X – MP 4.30 | |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000082; PSR-0000022 | Crossing Surface Reconstruction | Full reconstruction of at-grade crossing surface including demolition of existing roadway approach, crossing surface, track, and excavation 18" below bottom of tie. Installation of 6" sub-ballast, fabric, drain system, 12" ballast, 10' cross-ties under surface panels, OTM, Concrete panel crossing surface, 115RE rail, all welds, approach ballast replacement, grading to provide positive drainage away from crossing, and all ancillary work associated with crossing reconstruction. Provide and install asphalt approaches a minimum of 5' from edge of crossing. Remove any scrap ties and rail from the RR RoW on crossing approach in each direction. | 40 | TF | ||
| Region | Railroad Name | Railroad Acronym | Project | Project Category | Project Number | Description of Services | Additional Scope of Services | QTY | U/M | Site Name (Sub, Yard, Track, Crossing ID, etc.) |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-000008; PSR-0000028 | Crossing Surface Maintenance of Traffic | Coordinate with NYDOT, local roadway authority, and local emergency services for road closure and detour development. Establish work zone and install traffic control signage prior to beginning surface work. Remove work zone and traffic control signage upon surface completion. All aspects of Maintenance of Traffic are responsibility of contractor. Includes any closure permits and associated fees. | 1 | LS | Clifton Park, NY - Ashdown Road; 052563V - MP 0.79 | |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-000008; PSR-0000028 | Crossing Surface Reconstruction | Full reconstruction of at-grade crossing surface including demolition of existing roadway approach, crossing surface, track, and excavation 18" below bottom of tie. Installation of 6" sub-ballast, fabric, drain system, 12" ballast, 10' cross-ties under surface panels, OTM, Concrete panel crossing surface, 115RE rail, all welds, approach ballast replacement, grading to provide positive drainage away from crossing, and all ancillary work associated with crossing reconstruction. Provide and install asphalt approaches a minimum of 5' from edge of crossing. Remove any scrap ties and rail from the RR RoW on crossing approach in each direction. Clean culvert and ditch to adequately drain in the NE and SE quadrants. | 32 | TF | ||
| Region | Railroad Name | Railroad Acronym | Project | Project Category | Project Number | Description of Services | Additional Scope of Services | QTY | U/M | Site Name (Sub, Yard, Track, Crossing ID, etc.) |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000084; PSR-0000024 | Crossing Surface Maintenance of Traffic | Coordinate with NYDOT, local roadway authority, and local emergency services for road closure and detour development. Establish work zone and install traffic control signage prior to beginning surface work. Remove work zone and traffic control signage upon surface completion. All aspects of Maintenance of Traffic are responsibility of contractor. Includes any closure permits and associated fees. | 1 | LS | Clifton Park, NY - Blue Barns Road (CR 110) 052564C - MP 1.80 | |
| National | Berkshire & Eastern Railroad | BERX | Crossing | PAS-0000084; PSR-0000024 | Crossing Surface Reconstruction | Full reconstruction of at-grade crossing surface including demolition of existing roadway approach, crossing surface, track, and excavation 18" below bottom of tie. Installation of 6" sub-ballast, fabric, drain system, 12" ballast, 10' cross-ties under surface panels, OTM, Concrete panel crossing surface, 115RE rail, all welds, approach ballast replacement, grading to provide positive drainage away from crossing, and all ancillary work associated with crossing reconstruction. Provide and install asphalt approaches a minimum of 5' from edge of crossing. Remove any scrap ties and rail from the RR RoW on crossing approach in each direction. | 32 | TF |
Surface Info image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png