HDWorkman Oval

HDWorkman Oval

HDWorkman Callout Note B: Incoming 3" pneumatic piping - 12ft high from ground level

HDWorkman Line

HDWorkman Line

HDWorkman Rectangle

HDWorkman Callout Note C: Contractor/Vendor to perform pneumatic piping modifications inside the building allowing the piping to divert to the Air Dryer and then back into the original piping using Corrosion Resistant Galvanized Steel Schedule 40 that is manufactured in the USA.

**NOTE - USCG DOES NOT HAVE CAPABILITY TO PERFORM THE PIPING MODIFICATION. VENDOR WILL NEED TO PERFORM THIS TASK OR SUBCONTRACT IT TO A COMPANY THAT HAS THE CAPABILITY**

HDWorkman Line

HDWorkman Line

HDWorkman Callout Note F: Corrosion Resistant Galvanized Steel Schedule 40 3" pneumatic piping that is manufactured in the USA going to or from the Air Dryer.

HDWorkman Callout Note G: Corrosion Resistant Galvanized Steel Schedule 40 3" piping that is manufactured in the USA going to or from the Air Dryer.

HDWorkman Line

HDWorkman Callout Note E: Electrical power routed to Air Dryer will be performed by USCG

HDWorkman Callout Note H: The Air Dryer is to be installed in this partially open uninsulated shed

HDWorkman Text Box BLDG 77, IOD Blast hangar

HDWorkman Line

HDWorkman Line

HDWorkman Line

HDWorkman Oval

HDWorkman Oval

HDWorkman Oval

HDWorkman Line

HDWorkman Line

HDWorkman Oval

HDWorkman Line

HDWorkman Callout Note D: Cut holes in wall. Apply fireproff caulking around pneumatic piping .

HDWorkman Text Box

EXHIBIT 1

HDWorkman Line

HDWorkman Line

HDWorkman Callout Note A: Manual Shutoff valves for allowing system bypass. One pictured inside green box will be between the pneumatic piping that is leading to and from equipment.

HDWorkman Line

11