Exhibit 1.Oden Visitor Center PV Map.pdf

PDF 374 KB Posted

Attached to
Addendum 3 -DNR- Turnkey Solar Panels at Oden Visitor Cente
Solicitation number
RFP 751 200000001377 4
Issued by
Eaton County, Michigan

About this file

This is a site map exhibit from the Department of Natural Resources (DNR) for the Oden Visitor Center photovoltaic (PV) installation project. The document illustrates the proposed location and specifications for a solar photovoltaic array system designed to generate approximately 10 kilowatts of power, occupying roughly 1,000 square feet. The map designates a yellow area representing the recommended footprint for PV array placement, positioned in a location selected based on hydrological considerations, as the water table generally rises toward the northern portions of the site. The map identifies critical infrastructure elements including the visitor center utility meter, main electrical panel, power lines located west of the proposed PV area, a natural gas meter, and natural gas piping believed to run north-south from the road past the visitor center. The northern field area is noted as the wettest section of the property.

The exhibit provides essential site-specific technical information necessary for bidders to understand spatial constraints, utility connections, and environmental factors affecting the PV installation design and implementation. The documentation establishes baseline conditions for the proposed renewable energy system and indicates that site layout planning has already considered utility infrastructure conflicts and groundwater conditions to optimize system placement while minimizing environmental impact and utility interference.

View the file

Other files

File Type Posted
Exhibit 4 Visitor Center Photos for bid_Page_06.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_09.jpg JPG image
Exhibit 3.Example Utility Bill.Visitor Center.pdf PDF
Exhibit 2.Oden Energy Data.Visitor Center.xlsx XLSX spreadsheet
RFP 20_1377 Turnkey Schedule B - Pricing Oden Visitor Center.xlsx XLSX spreadsheet
Exhibit 4 Visitor Center Photos for bid_Page_01.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_04.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_07.jpg JPG image
RFP 20_1377 Turnkey Oden Visitor Center standard_contract_terms.docx DOCX document
RFP 20_1377 PPA Schedule C - Land Lease Agreement.docx DOCX document
Exhibit 4 Visitor Center Photos for bid_Page_05.jpg JPG image
RFP 20_1377 Turnkey Schedule A - Statement of Work Oden Visitor Center.docx DOCX document
Exhibit 4 Visitor Center Photos for bid_Page_12.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_11.jpg JPG image
RFP 20_1377 Turnkey Proposal Instructions-Oden Visitor Center Confidential Treatment Form-Vendor Questions Worksheet.docx DOCX document
Exhibit 4 Visitor Center Photos for bid_Page_08.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_03.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_02.jpg JPG image
Exhibit 4 Visitor Center Photos for bid_Page_10.jpg JPG image
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNR

Polyline

DNR

Callout Yellow area represents approximate footprint for a ~10 kW PV at 1,000 Sq. Ft.

Proposed PV arrays are encouraged in this general area as water table generally rises to the north. Note power lines West of yellow area.

DNR

Callout VC Utility Meter

DNR

Callout VC Main Electrical Panel

DNR

Cloud

DNR

Callout Northern field area is wettest.

DNR

Callout Natural Gas Meter.

Piping believed to run N-S from road past Visitor Center

File details come from the government source that posted it. Updated .