This is an exhibit map from the Department of Natural Resources (DNR) depicting the Oden Iso Building photovoltaic (PV) array installation site. The map outlines proposed solar panel locations and associated infrastructure, including two representative PV arrays of approximately 5,000 square feet and 50 kilowatts each, positioned within defined east and west boundaries on the property. An additional ~10 kilowatt PV array footprint of approximately 1,000 square feet is identified in a designated area where installation is encouraged due to favorable water table conditions. The map also indicates the locations of utility meters, main electrical panels, and approximate utility pathways that require review against as-built documentation. Tree removal is noted as permissible in specified areas to accommodate PV installation.
The site plan identifies critical infrastructure constraints including power lines west of the proposed installation area, natural gas metering and piping running north-south from the road past the Visitor Center, and wettest conditions in the northern field area that may impact placement decisions. The documentation notes that inclusion of the Visitor Center in a second power purchase agreement (PPA) bid is optional, suggesting a phased or flexible approach to the overall solar installation project. As-built plans and detailed site assessments are referenced as necessary review materials prior to final PV array placement and design finalization.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNR
Polyline
DNR
Callout Yellow boxes are representative of a PV array ~5,000 Sq. Ft and ~50 kW.
Proposed PV arrays should be contained within the far west and far east boundaries of these representative arrays.
DNR
Callout Utility Meter
DNR
Callout Main Electrical Panel
DNR
Polyline
DNR
Arrow
DNR
Polyline
DNR
Callout Approximate utility path. Review as-builts.
DNR
Cloud
0.00
DNR
Callout Approximate area trees can be removed, as needed.
DNR
Polyline
DNR
Callout Yellow area represents approximate footprint for a ~10 kW PV at 1,000 Sq. Ft.
Proposed PV arrays are encouraged in this general area as water table generally rises to the north. Note power lines West of yellow area.
DNR
Callout VC Utility Meter
DNR
Callout VC Main Electrical Panel
DNR
Cloud
DNR
Callout Northern field area is wettest.
DNR
Callout Natural Gas Meter.
Piping believed to run N-S from road past Visitor Center
DNR
Textbox Optional to include Visitor Center in a second PPA bid.