Excel_BID_PRICING_TABLE_-_MUSTANG_PARK_IMPROVEMENTS.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Mustang Park Improvements
- Solicitation number
- BID 2025-4-1
- Issued by
- Ellis County, Texas
About this file
The provided file is an Excel-based Bid Pricing Table for the Mustang Park Improvements project, solicited by the City of Waxahachie, Texas. The project involves constructing a looped walking trail around the Mustang Park pond, connecting to adjacent parkland, and expanding the existing parking area to improve accessibility and visitor experience. The bid pricing table comprehensively details multiple bid categories including Earthwork, Site Improvements, Storm Drainage, and Paving, with both a Base Bid and eight separate Bid Alternates. The bid includes detailed line items with estimated quantities for various construction activities such as mobilization, site preparation, demolition, soil management, fencing, pavement construction, drainage infrastructure, and site amenities. Quantities range from small-scale items like rock check dams and barrier-free ramps to larger volumes of concrete pavement, soil export, and utility installations.
The bid pricing table is structured to allow flexible bidding, with base and alternate options that enable the city to potentially scale the project based on available funding or priorities. The alternates include additional earthwork, expanded storm drainage infrastructure, different handrail and fencing options, a pond aerator, water fountain, and various pavement and subgrade preparation scenarios. While the specific unit prices are not filled in, the document provides a comprehensive framework for potential contractors to price their proposed work. Bidding documents and specifications are available through the city's online procurement portal, indicating a transparent and accessible procurement process. The project appears to be funded through municipal infrastructure improvement budgets, with the goal of enhancing public park facilities and visitor experience.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EARTHWORK - BASE BID | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 1 | 1 | LS | Mobilization and Bonds |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 2 | 1 | LS | General Site Preparation |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 3 | 1 | LS | Site Demolition |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 4 | 312 | CY | Cut/Fill Rotation |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 5 | 423 | CY | Export Soil Offsite |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 6 | 488 | LF | Silt Fence |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 7 | 1 | EA | Rock Check Dam |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 8 | 1 | LS | Construction Entrance |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 9 | 1 | LS | Storm Water Pollution Prevention Plan (SWPPP) |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 10 | 1 | LS | Seeding Turf Grass all Disturbed Areas |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 11 | 1 | LS | Construction Staking |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BASE BID | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 12 | 3 | EA | Collapsible Locking Bollard |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 13 | 52 | LF | 36” Tall Handrail |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 14 | 842 | LF | Pipe Rail Fence |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 15 | 1 | EA | Kraftsman 32 Gallon Trash Receptacle |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| STORM DRAINAGE - BASE BID | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 16 | 240 | LF | 30" RCP |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 17 | 2 | EA | 6:1 Sloped Headwall |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 18 | 64 | SY | Grouted Rock Rip Rap |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 19 | 240 | LF | Testing (TV Testing) |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 20 | 240 | LF | Trench Safety |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| PAVING - BASE BID | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 21 | 412 | SY | 5” Class A PCC Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 22 | 1900 | SY | 4” Class A PCC Pavement – Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 23 | 412 | SY | Scarify and Compact Subgrade Preparation Under 5” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 24 | 1900 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 25 | 1 | LS | Pavement Striping |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 26 | 4 | EA | Barrier Free Ramp |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 27 | 481 | LF | Connect to Existing Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| EARTHWORK - BID ALTERNATE 1 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 28 | 377 | CY | Cut/Fill Rotation |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 29 | 324 | CY | Export Soil Offsite |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 30 | 1024 | LF | Silt Fence |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 31 | 1 | LS | Seeding Turf Grass all Disturbed Areas |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 32 | 1 | LS | Construction Staking |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| PAVING - BID ALTERNATE 1 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 33 | 205 | SY | Scarify and Compact Subgrade Preparation Under 6” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| ERROR:#VALUE! | |||
| 34 | 1772 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| ERROR:#VALUE! | |||
| 35 | 205 | SY | 6” Class A PCC Pavement - Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| ERROR:#VALUE! | |||
| 36 | 1772 | SY | 4” Class A PCC Pavement - Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| ERROR:#VALUE! | |||||
| Total | $ - 0 | ||||
| EARTHWORK - BID ALTERNATE 2 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 37 | 589 | CY | Cut/Fill Rotation |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 38 | 284 | CY | Export Soil Offsite |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 39 | 1441 | LF | Silt Fence |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 40 | 2 | EA | Rock Check Dam |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 41 | 1 | LS | Seeding Turf Grass all Disturbed Areas |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 42 | 1 | LS | Construction Staking |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| STORM DRAINAGE - BID ALTERNATE 2 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 43 | 147 | LF | 18” RCP |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 44 | 197 | LF | 30” RCP |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 45 | 4 | EA | 6:1 Sloped Headwall |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 46 | 80 | SY | Grouted Rock Rip Rap |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 47 | 344 | LF | Testing (TV Testing) |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 48 | 344 | LF | Trench Safety |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| PAVING - BID ALTERNATE 2 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 49 | 67 | SY | Scarify and Compact Subgrade Preparation Under 6” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 50 | 2676 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 51 | 67 | SY | 6” Class A PCC Pavement - Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 52 | 2676 | SY | 4” Class A PCC Pavement - Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BID ALTERNATE 3 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 53 | 40 | LF | 34” Tall Handrail |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| PAVING - BID ALTERNATE 3 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 54 | 20 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 55 | 20 | SY | 4” Class A PCC Pavement - Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 56 | 40 | LF | Pier Stem Wall |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BID ALTERNATE 4 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 57 | 1 | EA | Pond Aerator |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BID ALTERNATE 5 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 58 | 40 | LF | 34” Tall Handrail |
complete in place, the sum of ________________________Dollars and ________________________
| Cents per | $ - 0 | $ - 0 | ||||
| Total | $ - 0 | |||||
| PAVING - BID ALTERNATE 5 | ||||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total | |
| 59 | 36 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 60 | 36 | SY | 4” Class A PCC Pavement- Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 61 | 40 | LF | Pier Stem Wall |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BID ALTERNATE 6 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 62 | 44 | LF | 34” Tall Handrail |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| PAVING - BID ALTERNATE 6 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 63 | 28 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 64 | 28 | SY | 4” Class A PCC Pavement - Sidewalk |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 65 | 44 | LF | Pier Stem Wall |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BID ALTERNATE 7 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 66 | 842 | LF | Precast Concrete Woodcrete Ranch Rail |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| SITE - BID ALTERNATE 8 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 67 | 1 | EA | Bi-Level, ADA Pedestal Fountain with Pet Bowl |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 68 | 1 | EA | 5/8” Domestic Water Meter |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 69 | 1 | EA | 1” Service Tap |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 70 | 141 | LF | 1” Poly Service |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||||
| Total | $ - 0 | ||||
| PAVING - BID ALTERNATE 8 | |||||
| Line Item | Est Quantity | Unit of Measure | Description | Unit Cost | Total |
| 71 | 32 | SY | Scarify and Compact Subgrade Preparation Under 5” Pavement |
complete in place, the sum of ________________________Dollars and ________________________
| Cents per | $ - 0 | $ - 0 | ||
| 72 | 5 | SY | Scarify and Compact Subgrade Preparation Under 4” Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 73 | 32 | SY | 5” Class A PCC Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| 74 | 5 | SY | 4” Class A PCC Pavement |
complete in place, the sum of ________________________Dollars and ________________________ Cents per
| $ - 0 | $ - 0 | ||
| Total | $ - 0 |