Excel_BID_PRICING_TABLE_-_MUSTANG_PARK_IMPROVEMENTS.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Mustang Park Improvements
Solicitation number
BID 2025-4-1
Issued by
Ellis County, Texas

About this file

The provided file is an Excel-based Bid Pricing Table for the Mustang Park Improvements project, solicited by the City of Waxahachie, Texas. The project involves constructing a looped walking trail around the Mustang Park pond, connecting to adjacent parkland, and expanding the existing parking area to improve accessibility and visitor experience. The bid pricing table comprehensively details multiple bid categories including Earthwork, Site Improvements, Storm Drainage, and Paving, with both a Base Bid and eight separate Bid Alternates. The bid includes detailed line items with estimated quantities for various construction activities such as mobilization, site preparation, demolition, soil management, fencing, pavement construction, drainage infrastructure, and site amenities. Quantities range from small-scale items like rock check dams and barrier-free ramps to larger volumes of concrete pavement, soil export, and utility installations.

The bid pricing table is structured to allow flexible bidding, with base and alternate options that enable the city to potentially scale the project based on available funding or priorities. The alternates include additional earthwork, expanded storm drainage infrastructure, different handrail and fencing options, a pond aerator, water fountain, and various pavement and subgrade preparation scenarios. While the specific unit prices are not filled in, the document provides a comprehensive framework for potential contractors to price their proposed work. Bidding documents and specifications are available through the city's online procurement portal, indicating a transparent and accessible procurement process. The project appears to be funded through municipal infrastructure improvement budgets, with the goal of enhancing public park facilities and visitor experience.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

EARTHWORK - BASE BID
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
11LSMobilization and Bonds

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
21LSGeneral Site Preparation

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
31LSSite Demolition

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
4312CYCut/Fill Rotation

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
5423CYExport Soil Offsite

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
6488LFSilt Fence

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
71EARock Check Dam

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
81LSConstruction Entrance

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
91LSStorm Water Pollution Prevention Plan (SWPPP)

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
101LSSeeding Turf Grass all Disturbed Areas

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
111LSConstruction Staking

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BASE BID
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
123EACollapsible Locking Bollard

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
1352LF36” Tall Handrail

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
14842LFPipe Rail Fence

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
151EAKraftsman 32 Gallon Trash Receptacle

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
STORM DRAINAGE - BASE BID
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
16240LF30" RCP

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
172EA6:1 Sloped Headwall

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
1864SYGrouted Rock Rip Rap

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
19240LFTesting (TV Testing)

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
20240LFTrench Safety

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
PAVING - BASE BID
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
21412SY5” Class A PCC Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
221900SY4” Class A PCC Pavement – Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
23412SYScarify and Compact Subgrade Preparation Under 5” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
241900SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
251LSPavement Striping

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
264EABarrier Free Ramp

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
27481LFConnect to Existing Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
EARTHWORK - BID ALTERNATE 1
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
28377CYCut/Fill Rotation

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
29324CYExport Soil Offsite

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
301024LFSilt Fence

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
311LSSeeding Turf Grass all Disturbed Areas

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
321LSConstruction Staking

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
PAVING - BID ALTERNATE 1
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
33205SYScarify and Compact Subgrade Preparation Under 6” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

ERROR:#VALUE!
341772SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

ERROR:#VALUE!
35205SY6” Class A PCC Pavement - Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

ERROR:#VALUE!
361772SY4” Class A PCC Pavement - Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

ERROR:#VALUE!
Total$ - 0
EARTHWORK - BID ALTERNATE 2
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
37589CYCut/Fill Rotation

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
38284CYExport Soil Offsite

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
391441LFSilt Fence

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
402EARock Check Dam

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
411LSSeeding Turf Grass all Disturbed Areas

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
421LSConstruction Staking

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
STORM DRAINAGE - BID ALTERNATE 2
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
43147LF18” RCP

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
44197LF30” RCP

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
454EA6:1 Sloped Headwall

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
4680SYGrouted Rock Rip Rap

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
47344LFTesting (TV Testing)

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
48344LFTrench Safety

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
PAVING - BID ALTERNATE 2
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
4967SYScarify and Compact Subgrade Preparation Under 6” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
502676SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
5167SY6” Class A PCC Pavement - Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
522676SY4” Class A PCC Pavement - Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BID ALTERNATE 3
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
5340LF34” Tall Handrail

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
PAVING - BID ALTERNATE 3
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
5420SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
5520SY4” Class A PCC Pavement - Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
5640LFPier Stem Wall

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BID ALTERNATE 4
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
571EAPond Aerator

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BID ALTERNATE 5
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
5840LF34” Tall Handrail

complete in place, the sum of ________________________Dollars and ________________________

Cents per$ - 0$ - 0
Total$ - 0
PAVING - BID ALTERNATE 5
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
5936SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
6036SY4” Class A PCC Pavement- Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
6140LFPier Stem Wall

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BID ALTERNATE 6
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
6244LF34” Tall Handrail

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
PAVING - BID ALTERNATE 6
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
6328SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
6428SY4” Class A PCC Pavement - Sidewalk

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
6544LFPier Stem Wall

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BID ALTERNATE 7
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
66842LFPrecast Concrete Woodcrete Ranch Rail

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
SITE - BID ALTERNATE 8
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
671EABi-Level, ADA Pedestal Fountain with Pet Bowl

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
681EA5/8” Domestic Water Meter

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
691EA1” Service Tap

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
70141LF1” Poly Service

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0
PAVING - BID ALTERNATE 8
Line ItemEst QuantityUnit of MeasureDescriptionUnit CostTotal
7132SYScarify and Compact Subgrade Preparation Under 5” Pavement

complete in place, the sum of ________________________Dollars and ________________________

Cents per$ - 0$ - 0
725SYScarify and Compact Subgrade Preparation Under 4” Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
7332SY5” Class A PCC Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
745SY4” Class A PCC Pavement

complete in place, the sum of ________________________Dollars and ________________________ Cents per

$ - 0$ - 0
Total$ - 0

File details come from the government source that posted it. Updated .