This document is a project specification for Building 8401 (PX Building) repair and modification work, identified as Project No. BMH-EXC-B0519-6P. The scope includes comprehensive door and egress modifications, fire safety system upgrades, and structural repairs to achieve NFPA 101 Life Safety Code compliance. Key work items include replacing multiple non-compliant escape doors with NFPA 101-compliant panic-bar equipped doors; installing a new gate with integrated pedestrian door at the north delivery entrance; constructing new external walkways and correcting pavement heights at multiple locations; replacing one severely deteriorated external staircase with a temporary modular system requiring structural calculations; and closing or modifying approximately 36 numbered doors and access points throughout the facility. Additional requirements include adding fire-rated drywall enclosure with door for the fire alarm system location, installing complete fire detection coverage by adding smoke detectors to all rooms, sealing wall and ceiling penetrations in stairwells and fire-rated areas, and performing partial plaster and paint repairs around new door installations. The contractor must prepare walls by removing loose plaster, relocating electrical outlets and cable ducts as needed, replacing broken ceiling tiles, and modifying door hardware (including converting Door #29 from half-cylinder to standard cylinder for emergency access). A certified designer must prepare detailed construction documents. The work is located at Building 8401 PX (retail facility in Germany) and requires compliance with German and NFPA standards for life safety and fire protection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project-No.: BMH- EXC-B0519-6P, Repair Doors PX Bldg. 8401
Typical escape door currently installed (photo shows door #1):
Currently the doors can be locked, this does not meet NFPA 101 requirements.
Photo shows door #12 from the storage to the outside
#36 subway
Stair room number 201, toilet doors #15 and #16. Escape door in the middle #13
Existing gate at delivery entrance on north side:
Sample photo for new gate with integrated door:
Integrated door/ Schlupftür
Sample photo of partial plaster and paint repair around a new door:
Walkway and trench cover must be made on north side (doors #2 and #3):
East side store emergency exit, correct the pavement height (door #1):
Step is not allowed according to NFPA 101.
East side walkway, exit from subway and mechanical room. Pavement must be raised and widened (door # 34 and #35):
Photos of current stair that shall be replaced (door #12 1st floor):
Material is in a very bad condition.
Sample photo of a temporary stair made of individual elements with structural calculation for the system (Systemstatik) (doors # 14 and #25)
Windows and panels that shall be removed and closed with masonry. Size opening appr.
3,00m x 2,20m:
Fire Alarm System, current scope of detectors. Add sufficient number of detectors to every room for full coverage.
Certified designer must do the design described in the contract.
Add fire rated drywall with door in corner where fire alarm system is located:
Prepare wall, remove loose plaster, move outlets, move or remove cable ducts.
Door #29 is currently not accessible from outside. Change half cylinder to a standard cylinder so that fire department can open that door in case of an emergency. Change/ replace covers if needed. Cylinder shall be part of the locking system.
Door #29, detailed view from inside.
Plaster at south side of façade (opposite side of Telekom shop) needs repair of plaster.
Penetrations in stairwell wall and fire rated walls according to marking in floor plan
There are some single cable penetrations and some single small holes in the walls that are not shown on the photos.
For the bid it can be assumed that almost all ceiling tiles along the staircase walls must be removed to get access to the wall penetrations.
Replace all dirty or broken ceiling tiles.
Wall penetrations in the 1st floor storage and mechanical rooms can be seen on site during the pre-bid site visit, no photos are provided.
1st floor
2nd floor
Close ceiling opening to attic
Close penetration/ hole in ceiling.
Replace broken ceiling tiles