This document contains the specifications for the Glen Elder Wildlife Area Boller Point Boat Ramp Replacement and Rip Rap Restoration project, which is being managed by the Kansas Department of Wildlife and Parks (KDWP). The scope of work involves demolition of the existing boat ramp, installation of a new concrete boat ramp with walkway, and installation of new rip rap as indicated on the plans. The project has a 60 calendar day completion timeline from the Notice to Proceed issued by the KDWP Project Manager. Bidders can access the work site by contacting the Park Manager to arrange a site visit, but there is no pre-bid conference scheduled. The project will be awarded to the responsible bidder offering the lowest bid price and meeting the requirements of the contract documents. The bid form includes a base bid and any accepted alternates, with liquidated damages established at $250 per day for late completion.
The specifications provide detailed requirements for earthwork, concrete work, and joint protection for the project. Contractors must include all applicable state and local sales taxes in their bids. Federal excise tax is also included in the quoted prices. The contractor must provide a progress schedule, submittals, and warranties as required by the contract documents. Payment and performance bonds may be required, and the contractor is responsible for temporary facilities and controls during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EVT0009744_-_GELR_Boller_Point_Boat_Ramp_-_RFQ.docx | DOCX document | |
| Amendment_1_-_Boat_Ramp_Plans.docx | DOCX document | |
| GELR_-_Boller_Point_Boat_Ramp.pdf | ||
| EVT9744_-_Construction_Plans.pdf | ||
| Boat_Ramp_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Glen Elder Wildlife Area Boller Point Boat Ramp Replacement and Rip Rap Restoration
PG 1 OF 28
SECTION 01010 - SUMMARY OF WORK AND GENERAL REQUIREMENTS
PART 1 – GENERAL
1.1 SUMMARY:
A. Project Scope: Contractor shall furnish all equipment, material, and labor to demo existing boat ramp, install new concrete boat ramp with walkway and install new rip rap as indicated on the plans per the construction documents, and verified by KDWP.
B. The scope of work is for the Base Bid only. Alternate drawing plans are purposefully omitted from the plan set.
1.2 DEFINITION:
A. KDWP: Kansas Department of Wildlife and Parks.
B. Project Manager: Where the word “Project Manager” is used throughout the contract documents, it shall be understood to mean KDWP Engineering Services Project Manager.
C. Owner: Where the word “owner” is used throughout KDWP
D. Engineer: Where the word “Engineer” is used throughout the Contract Documents, it shall be understood to mean Project Engineer from Kaw Valley Engineering.
1.3 POINTS OF CONTACT:
A. Points of Contact (P.O.C.) Names: The following individuals may be contacted regarding the Project. For technical and administrative questions concerning the Project during bidding and construction, contact:
Chris Lecuyer Melanie Levering P.E. Brandon Jacobs Wildlife Area Manager Engineering Project Manager Project Manager
KDWP KDWP KDWP
2131 180 Rd. 512 SE 25th Ave. 2301 E 13th Glen Elder, Kansas Pratt, Kansas Hays, Kansas
(785) 342-3680 (620) 388-0036 (785) 631-0660 chris.lecuyer@ks.gov melanie.levering@ks.gov brandon.jacobs@ks.gov
1.4 SITE VISITS:
A. There is no pre-bid conference scheduled for this project.
B. Bidders Access to Site: Bidders and sub-bidders may have access to the work site by contacting the Park Manager to arrange a day and time.
Chris Lecuyer Wildlife Area Manager
PG 2 OF 28
(785) 342-3680 chris.lecuyer@ks.gov
1.5 AGREEMENTS FOR BIDDING:
A. Bidder acknowledges and agrees to submit his Bid in accordance with the provisions required by the Bid Form and KDWP On-Call Contract or if applicable, OFPM On-Call Contract.
B. The Project shall be constructed under a single Contract and will be awarded to the responsible
Bidder offering the lowest bid price and meeting the requirements for bidding and requirements of the Contract Documents. The lowest bid price will be calculated by the sum of the Base Bid and the total of any Alternates that are accepted by Owner after all Bids are opened.
C. Failure to acknowledge receipt of Addenda issued may be cause for Owner’s rejection of
Bid.
D. An incomplete Bid or information included but not solicited on the Bid Form may be cause for Owner’s rejection of a bid.
E. A Bid may be considered incomplete or non-responsive if it fails to quote a price for an
Alternate or other separate item identified and solicited on the Bid Form supplied to the Bidder.
F. KDWP reserves the right to reject any or all Bids and to waive technicalities and formalities for the acceptance or rejection of Bids, should such action be deemed in the best interest of the Owner.
G. The Owner reserves the right to accept or reject any or all Alternates submitted with the Bid before award of the Contract.
H. In compliance with K.S.A. 75-3741, subcontractors which the Contractor proposes to employ for the work shall be listed.
I. It is the responsibility of the Contractor to supply his prospective subcontractors (if needed) with copies of the Contract Documents for bidding. Neither the Owner nor the Kansas Division of Purchases will be responsible for supplying prospective subcontractors with Contract Documents for bidding.
1.6 ADDENDA:
A. Acknowledgment of Receipt of Addenda: I/we have received and considered the following Addenda in the submitted Bid for this Project. (Bidder shall fill in signature above using same person as signing the Bid Form and shall initial each applicable Addenda space below.)
None ( _) #1 ( _) #2 ( _) #3 ( _ ) #4 ( _ ) #5 (_ )
B. Substantiation: Bidder shall attach a copy of this completed page to the Bid Form.
PG 3 OF 28
1.7 TIME OF COMPLETION:
A. Calendar Days: Contractor agrees, if awarded the Contract, to complete the Work of the Contract within 60 calendar days from the “Notice to Proceed” issued by KDWP Project Manager.
B. Calendar Completion Date
1. The Project Manager will issue a Notice to Proceed on the date the Contractor begins work or the date the Contract Documents specify.
2. Complete all work necessary to open the Project to unrestricted traffic within the calendar days allotted in the Contract Documents or before the calendar completion date expires, including authorized time extensions (if any). Complete all remaining, unfinished contract pay items, subsidiary items, incidental work, extra work, final cleanup, and final punch list within the calendar days remaining (if any), within the days remaining before the calendar completion date expires (if any), and within the Cleanup Time set by the project special provision.
3. The Project Manager or Engineer will increase the number of calendar days, extend the calendar completion date, if the Contractor proves one of the following:
a. Unusually severe weather delayed the Project completion as provided in this subsection 1.7.B.2. Unusually severe weather is adverse weather that at the time of year in which it occurred is abnormal for the place in which it occurred. For unusually severe weather to delay Project completion and warrant additional time under subsection 1.7 B.2, the Contractor must have a schedule showing the controlling item(s) of work and delay to the controlling item(s) of work at the time of the unusually severe weather. In addition, the Contractor must show unusually favorable weather at other times of the year failed to diminish, mitigate, or overcome the delay caused by the unusually severe weather.
b. An Act of God delayed the Project completion.( Including documentable supplier delay due to Covid-19 issues)
c. The Project Manager has sole discretion to determine whether to give a time extension under subsection 1.7 B.2.
C. Substantial Completion is defined as: All products furnished, installed, and work completed in accordance with the contract documents with exception of deficient items noted on final inspection.
D. Liquidated Damages
1. Amount: Liquidated damages for the Project are established at the rate of $250.00 per day until completion of the project.
1.8 STATE TAX:
A. This project has been determined by the Kansas Department of Revenue to be subject to
PG 4 OF 28
Kansas sales tax. The cost of said Tax must be INCLUDED IN all Bid and Contract prices.
Sales tax includes all applicable state, county, and city sales taxes.
B. A general contractor or other contractor who contracts directly with the State of Kansas or one of its agencies shall pay tax as follows:
1. Labor: No tax will be assessed since the labor is purchased directly by the State or one of its agencies.
2. Materials: Taxes will be assessed on material purchased for the project.
C. A subcontractor on this project shall pay tax as follows:
1. Labor Taxes will be assessed because this labor is not purchased directly by the state or one of its agencies. (However, labor will not be taxed on projects calling for the original construction of a building or for repair or remodeling of a residence).
2. Materials: Taxes will be assessed on materials purchased for the project.
D. Whether sales tax should be paid to the Department of Revenue by a subcontractor on the subcontractor's labor services will depend upon whether the project qualifies as the original construction of a building or facility or as the repair or remodeling of a residence. The contractor and each subcontractor will be responsible for determining whether labor services for the project qualifies for such exemption and for including the correct amount of state, county, and city sales tax applicable to this project. Contractors and subcontractors must include all sales tax due on materials, which are not exempt on this project. Any questions should be addressed to the Kansas Department of Revenue, Division of Taxation, Taxpayer Assistance Center. (785) 296- 0222.
E. A general contractor or other contractor that contracts directly with the State of Kansas shall obtain copies of the Kansas Retailers Sales Tax Registration certificates from all its subcontractors on this project and have them available at the jobsite upon request.
1.9 FEDERAL TAX:
A. Federal Tax Included: Bidder acknowledges that the cost for the Federal Excise Tax has been included in quoted prices on the Bid Form, to cover the cost of said tax on all items of construction, equipment, and material subject to such tax.
1.10 PRE-CONSTRUCTION:
A. Requirements: Prior to starting construction the following items shall be completed.
1. Receipt of “Purchase Order” from Kansas Department of Wildlife, Parks
2. Receipt of “Notice to Proceed” from Kansas Department of Wildlife & Parks Project
Manager.
PG 5 OF 28
3. Progress Schedule: The contractor will provide a progress schedule either at the pre-construction or within 10 business days before the anticipated beginning of work on the project. Plan and organize the work to meet the Contract Time. An adjusted schedule may be required should the work fall behind the latest schedule by 14 Calendar days and/or if a planned sequencing change is required to complete the work within the Contract Time.
1.11 SUBMITTAL:
A. Addressing of Submittals: Submittals, notifications, and reports required by the Specifications and Conditions of the Contract may be sent electronically or addressed to the following, unless otherwise indicated in the Contract Documents.
Melanie Levering P.E. Brandon Jacobs Engineering Project Manager Project Manager
KDWP KDWP
512 SE 25th Ave. 2301 E 13th Pratt, Kansas Hays, Kansas
(620) 388-0036 (785) 631-0660 melanie.levering@ks.gov brandon.jacobs@ks.gov
B. Format and Identification: Project number shall be on all submittals. Submittals shall be approved by the General Contractor prior to submittal to the engineer. All copies shall have an indication of General Contractor approval.
C. Marking and Legibility: Submittals in the form of manufacturer’s standard preprinted data and brochures shall be suitably marked by Contractor to designate the information, materials, and products applicable to the Project. Such markings shall be reproducible by means of standard photocopy machinery. Color highlighting as a means of marking is not acceptable.
D. Copies: Contractor shall provide 2 copies of each submittal for Owner’s records plus the number of copies needed by Contractor.
E. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.
Time for review shall commence on Project Manager’s receipt of submittal.
1. Initial Review: Allow 7 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Project Manager will advise Contractor when a submittal being processed must be delayed for coordination.
2. Resubmittal Review: Allow 5 days for review of each resubmittal.
1.12 GENERAL GUARANTEE:
A. The Contractor shall remedy and make good all defective workmanship and materials and pay for any damage to other work or property resulting therefrom, which appear within a period of one year from the date of final project completion, providing such defects are not clearly due to abuse or misuse by Owner. The Owner will give notice of observed defects with reasonable
PG 6 OF 28
promptness. The one (1) year period will not apply to defective workmanship and materials not discovered within the one-year period.
B. Neither the final certificate for payment nor any provision in the Contract Documents nor partial or entire occupancy of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any expressed warranties or responsibility for faulty materials or workmanship.
C. The guarantee on all work covered under this contract shall begin on the date of Final Project Completion or substantial completion if applicable. Any additional work in this area shall be considered warranty work by the Contractor.
D. Where guarantees or warranties are required in sections of specifications for period more than one year, such longer terms shall apply.
E. Within nine months after official acceptance of the Project, the Owner, the Contractor, the
Project Manager shall conduct a full inspection of the completed project and the Contractor shall promptly correct all items noted.
F. If, within one year after the date of Final Completion of the Work or designated portion thereof, or after the date for commencement of warranties, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found not to be in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Project Manager to do so unless the Project Manager has previously given the Contractor a written acceptance of such condition.
G. Nothing contained in this Article shall be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Documents.
Establishment of time period of one year as described in this Article relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time with which the obligation to comply with the Contract documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor’s liability with respect to his obligations other than specifically to correct the Work.
1.13 GUARANTEES AND WARRANTIES:
A. General: Provide guaranties and warranties in accordance with the General Conditions of the Contract and as required by the Specifications.
B. Submittal: Warranties and guarantees shall be addressed and submitted to:
Chris Lecuyer Wildlife Area Manager
KDWP
(785) 342-3680 chris.lecuyer@ks.gov
1.14 MATERIAL, EQUIPMENT, AND SUBSTITUTIONS:
PG 7 OF 28
A. Materials and Products: In general, the Contract Documents identify the required materials and equipment by naming one or more manufacturer’s brand name, model number, catalog number, or other similar proprietary identification. Where one or more proprietary identifications or manufacturers is listed for a category of material and equipment, the intent is that the Contractor may provide any of those listed. Bids shall be based on Contractor providing only those materials and equipment named and identified in the Contract Documents.
B. Material Quality: Contractor provided material and equipment shall be new, unused, and undamaged when delivered to the site.
C. Substitutions: Materials and equipment not named in the Contract Documents which the
Contractor wishes to provide will be considered as a substitution in accordance with the following procedures and conditions and may be provided only when approved by the Owner.
1. Substitution Requests: When request for substitution is made after execution of the
Contract, Contractor shall request substitution in writing and such request shall be accompanied by complete information to allow Owner’s and/or Engineer’s analysis including, manufacturer’s and product identification, technical data including performance, dimensional and operational characteristics, cost data impact on time for completion, samples, and other information necessary for analysis. Include an itemized comparison of the qualities and characteristics of the specified item versus those of the substitution item. Submit 2 copies of request and accompanying information and clearly identify as “Request for Substitution” followed by appropriate Project Number.
2. Conditions: Owner will consider substitutions only under one or more of the following conditions.
a. Required for compliance with subsequent interpretations of code requirements.
b. Unavailability of a specified item, through no fault of Contractor.
c. Subsequent information discloses inability of specified item to perform properly or fit in designated space.
d. Manufacturer of fabricator refuses to certify, guarantee, or warranty performance of specified item.
3. When the Owner determines that in his judgment a substitution would be substantially to the Owner’s best interest in terms of cost, time, or other considerations.
4. Contractor’s Representations: By submitting a request for substitution, Contractor represents the following:
a. Proposed substitution has been personally investigated by Contractor.
b. The substitution material or equipment carries the same or better warranty or guarantee as the specified item.
c. Cost data presented is complete and includes all related costs under the Contract, and
Contractor waives all claims for additional costs related to the substitution and the Project which subsequently become apparent.
PG 8 OF 28
d. Installation of an approved substitution shall be coordinated with all portions of the work, and that changes as may be necessary shall be made so that the Work is complete in all respects.
1.15 TEMPORARY FACILITIES AND CONTROLS:
A. General: Contractor shall provide temporary facilities and controls necessary to complete the Work. Remove Contractor provided temporary facilities and controls upon completion of the Work and sooner when no longer needed.
B. Contractor’s Field Office and Storage: Space for a field office within the work area is acceptable. An exterior area to accommodate a field office or material storage at the work site, if requested by Contractor, will be provided at a location to be designated by the Owner. Owner is not responsible for safe keeping or protection of materials of equipment stored on Owner’s property.
C. Toilet Facilities: as available.
D. Water: as available.
E. Electric and Lighting: as available.
F. Telephone: Not provided.
1.16 ADDITIONAL REQUIREMENTS:
A. Existing Facilities: The Contractor shall take all necessary precautions to insure against damage to existing facilities and their contents. Any damaged items shall be repaired or replaced by the Contractor at no additional cost to the Owner.
B. Protection of Work: The Contractor shall take all necessary precautions to insure against damage to Products and Work. Any damaged items shall be replaced, or repaired, so as to eliminate evidence of repair, at no additional cost to the Owner.
C. Project Maintenance: Remove debris and rubbish from the work site as frequently as necessary to avoid safety hazards and unsightliness, and at the end of each workday.
1.17 INSPECTIONS:
A. Inspections: Inspections will be conducted by KDWP Project Manager or Engineer and/or their representative as frequently as deemed necessary.
B. Notifications: The Contractor shall give KDWP personnel a minimum of 48 (forty-eight) hours’ notice prior to any concealment or covering for inspection purposes.
C. Inspections conducted by KDWP personnel does not relieve Contractor from compliance of Contract Documents.
- - END OF SECTION 01010 - -
PG 9 OF 28
SECTION 02200 – EARTHWORK
1.01 DEFINITION:
A. Earthwork is defined as all excavation, trenching, fill, backfill, site preparation, subgrade preparation and other appurtenant work.
1.02 CLASSIFICATION:
A. Excavation will be unclassified, and the term "excavation" shall include all material encountered without regard to its physical properties, characteristics, or composition.
1.03 LIMITS OF THE WORK:
A. Earthwork shall not extend beyond the areas of excavation, embankment or other construction shown on the drawings.
B. Blasting will not be permitted.
1.04 SAFETY AND PROTECTION:
A. Shoring, sheeting, and bracing shall be provided as required to protect the work and workmen from damage or injury by caving or sloughing.
B. Laws and ordinances regulating health and safety measures shall be strictly observed.
1.05 ACCESS:
A. Representatives from the Department of Wildlife & Parks and other State agencies as appropriate shall be provided access to the construction site for inspection purposes.
1.06 WORK INCLUDED:
A. Provide all labor, materials, and equipment necessary to complete clearing, grubbing, topsoil removal, excavation, embankment, preparation of subgrade, riprap, structural excavation, backfilling, sloping, topsoil placement and finish grading. Work also includes removal of water and disposal of excess material, vegetation, and rubbish.
B. Construct and maintain all temporary drainage swales, berms, and diversions; furnish, operate, and maintain all necessary pumping and other equipment for dewatering. After above items serve their purpose, remove them, and restore site.
C. Conform to all applicable federal, state, and local laws and regulations regarding erosion and pollution control.
PG 10 OF 28
1.07 REFERENCES:
A. Kansas Department of Transportation (KDOT), Standard Specifications for State Road and Bridge Construction – latest edition.
B. American Society for Testing and Materials (ASTM);
1. D 698 Moisture-Density Relations of Soils using 5.5 lb. (2.49 kg) Rammer and a 12-inch
(305 mm) Drop.
2. D 1556 Density of Soil in Place by the Sand-Cone Method.
3. D 2167 Density of Soil in Place by the Rubber Balloon Method.
4. D 2922 Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth).
PART 2 – PRODUCTS
2.01 EXCAVATED MATERIALS:
A. Topsoil obtained by stripping and suitable for finish grading where topsoil is required shall be stockpiled for future use.
B. Excavated material suitable for embankment, fill or backfill, shall be placed in areas receiving embankment or stored for future use.
C. Borrow area excavations shall be limited to a maximum net depth of 24 inches. This would generally include 6 inches of topsoil stripping, 18 inches of removed material and the replacement of the stripping. After all borrow material is removed, all borrow areas shall be sloped into the surrounding contour and graded to drain.
2.02 MATERIAL FOR BACKFILL AND EMBANKMENTS:
A. Material for backfill and embankments shall generally be impermeable materials classified as CL, CH, or CL-CH as defined by the Unified Soil Classification System. These materials shall be free of organic matter, roots, debris, and particles larger than 1-inch in greatest dimension. Borrow materials for embankments may be obtained from locations as indicated on the Plans.
PART 3 – EXECUTION
3.01 PREPARATION, CLEARING AND GRUBBING:
A. Verify all utility depths and locations prior to construction.
B. Protect existing improvements to remain from damage during construction.
C. Make provisions for protection of all disturbed areas from erosion until project substantial completion.
PG 11 OF 28
3.02 TOPSOIL AND ROCK SURFACING:
A. Excavate topsoil and rock surfacing from construction areas. Topsoil shall be stockpiled for use in finishing operations. Rock surfacing shall be stockpiled for reuse as applicable.
B. In general, topsoil shall be removed to a depth of six to twelve inches. The depth of topsoil may vary throughout the project. Topsoil shall be spread evenly to a depth of at least 6-inches over all cut and fill areas not covered by structures, gravel surfacing, or riprap.
3.03 OPEN EXCAVATIONS AND STOCKPILES:
A. Control excavation to prevent water from running in. Do not obstruct surface drainage or existing waterways with stockpiles.
3.04 DEWATERING:
A. Provide and maintain devices at all times during construction to remove and dispose of all water from any source from all excavations. Use methods which will ensure dry excavations and preserve the final lines and grades of the excavation. Methods used may include well points, sump pumps, suitable rock or gravel drains, temporary pipelines, or other acceptable means.
B. Commence dewatering when water is first encountered and continue until construction is complete.
Dewater so that floor or footing concrete will not be placed in water. Do not allow water to rise against walls or above footings and slabs.
3.05 EXCAVATION AND TRENCHING:
A. General: Perform all material conditioning and excavations required. Excavation includes the removal and selected disposal of all excess or unsuitable materials of whatever nature.
B. Stockpile satisfactory excavated materials until required for fill or backfill. Stockpile in area(s) on-site where it will not interfere with drainage, construction, or utility operations. Obtain composite sample for laboratory testing.
C. Remove from site and legally dispose of all excavated materials unsatisfactory for use as fill or backfill.
D. Placement of Materials: Excavated material which meets required specifications may be used in embankments or backfill when approved and accepted.
E. Disposal of unsuitable and excess material. Unsuitable materials are defined as large rocks, excessive organic materials, and excess excavation material. See Articles 3.15 and 3.16 for disposal of unsuitable and excess material.
3.06 EMBANKMENTS:
A. General: Place all embankments to the lines and grades shown in the plans. Areas to be covered with topsoil shall be underfilled so the finished lines conform after topsoil placement. Protect and
PG 12 OF 28
maintain embankments during construction. Replace all materials lost due to storm or flood damage. Use materials obtained during excavation or borrow materials. Do not use brush, sod, or other unsuitable materials in embankments.
B. All sod and vegetable matter shall be removed from the surface upon which an embankment is to be placed and the cleared surface shall be completely broken up by plowing, scarifying, or stepping to a minimum depth of 6-inches.
C. When an embankment is to be placed against an existing embankment whose slopes are steeper than 5:1, the existing slope shall be continuously benched, and the new embankment constructed in uniform lifts. Benching shall be of sufficient width to permit operations of placing and compacting equipment. Each horizontal cut shall begin at the intersection of the original ground and the vertical sides of the previous cuts. Material thus cut out shall be recompacted along with the new embankment material.
D. No embankment shall be constructed on or of frozen material, nor shall organic material be used for embankment.
E. Placement: Place material in loose lifts not exceeding 9 inches, brought to within 0% to +4% of optimum moisture content. Bring up each lift uniformly over the entire area being filled. Compact each layer to 95% of maximum dry density as determined by ASTM D698 as it is placed.
F. Make provisions for proper drainage during construction on the surface by sloping at approximately
2%. Maintain this slope during the entire construction procedure and maintain the proper moisture content in the uppermost layer. If placing of materials is interrupted and the material dries, bring to proper moisture content before resuming by sprinkling, cultivating, and rolling to the required compaction. Do not place or roll material during rainfall of sufficient intensity to materially increase the moisture content. If any material placed in embankment acquires a greater moisture content than is suitable for compaction, allow to dry or remove. If removed, recondition the new surface before placing new material. Repair any irregularities caused by erosion by excavating, cultivating, filling, and compacting.
3.10 STRUCTURAL EXCAVATION:
A. General: Structural excavation is the removal of all materials of whatever nature to approved structural subgrade and as necessary for construction of structures and foundations. Approved structural subgrade is that material which has been observed by the Engineer and upon which structural foundations or other materials may be placed.
B. Locate limits of excavation for structures with formed vertical surfaces at least 5 feet from the extreme outside of the structure to the toe of the cut slope. Where excavation is inadvertently carried beyond the design elevations or approved structural subgrade, adjust the construction as directed to meet the structural requirements.
C. Rectify over depth excavation in such locations by backfilling with crushed rock bedding material compacted to 95% maximum density or concrete as required by the Engineer.
D. Design and install shoring if necessary. Side slopes of excavation shall be only as steep as is safe
PG 13 OF 28
for material to stand. Avoid unnecessary disturbance of adjacent ground.
3.11 SUBGRADE FOR STRUCTURES:
A. Removal all existing loose natural clays, sand, and compressible materials under proposed structures. Excavate to depths indicated.
B. Following excavation, scarify next 8 inches of soil, moisture condition, and recompact to 95% of maximum density at a moisture content of 0% to +4% of optimum.
C. Fill all voids with aggregate material. Remove any disturbed or unacceptable materials at excavated foundation levels and replace with aggregate material. Carefully make excavations to avoid ponding of water.
D. Exercise careful excavation procedures to provide a relatively smooth subgrade.
3.12 BACKFILL AROUND STRUCTURES:
A. Use native materials for backfill material around structures as indicated on drawings. Place backfill in 9-inch loose lifts and compact to 95% of maximum density at a moisture content within 0% to +4% of optimum in accordance with ASTM D 698.
B. Do not use any axle-driven or tractor-drawn compaction equipment within five (5) feet of any structure.
3.13 COMPACTION:
A. Obtain compaction of backfill and embankment by mechanical means with compaction equipment or other equipment approved by the Project Manager. Pad foot rollers on an excavator, walk behind or remote trench compactors, and jumping jack type compactors are all acceptable means of compaction for this project. Do not use water jetting, hydraulic fill, or flooding. Compact each layer with mechanical tampers. Do not place backfill against concrete walls until design strength of concrete has been reached.
3.14 DISPOSAL OF UNSUITABLE MATERIAL:
A. Material not suitable for embankment, fill or backfill may be disposed of on-site at a location determined by the Owner. Transportation of such material shall be provided by the Contractor.
3.15 DISPOSAL OF EXCESS SUITABLE MATERIAL:
A. Material in excess of requirements for embankment, fill or backfill may be disposed of on-site at locations determined by Owner. Transportation of such material shall be provided by the Contractor.
3.16 CLEAN-UP:
A. Completely remove from site and legally dispose of all excess materials and debris, unless
PG 14 OF 28
otherwise specified.
B. Excess soil not being re-used, may be uniformly spread in areas approved by the Engineer and in a manner to facilitate site drainage.
3.17 CONSTRUCTION STAKING
A. All construction staking shall be provided by the Contractor.
- - END OF SECTION 02200 - -
PG 15 OF 28
SECTION 03 3000 – CAST-IN-PLACE CONCRETE
1.1 SCOPE OF WORK:
A Provide all labor, materials, and equipment necessary for performing all concrete Work as shown on Drawings and specified herein.
B. This Section shall apply to all footings, foundations, steps, curbs, walls, flatwork, and other incidental concrete Work.
1. Other individual Specification Sections may be included that address some of the above types of concrete improvements. If a conflict is found between Section 03 3000 and any of the other such Sections, the other Section shall prevail.
C. All concrete Work shall meet the requirements of the ADA (Americans with Disabilities Act).
1.2 SECTION INCLUDES:
A Concrete sidewalks, ramps, curbs, and exterior slabs including formwork, reinforcement, accessories, cast-in-place concrete, finishing, and curing.
1.3 SCHEDULE:
A Perform Work under environmental conditions conducive for the specified Work. Protect Work when such conditions do not occur.
B. Coordinate Work with all other contractors performing work on the jobsite.
1.4 QUALITY
A Contractor shall employ certified independent testing agency approved by the Engineer for testing concrete work.
B. Construct and erect concrete formwork in accordance with ACI 301, and 318, unless specified otherwise in this Section.
C. Perform concrete reinforcing Work in accordance with ACI 301, 318 and CRSI 63, 65 unless specified otherwise in this Section.
D. Perform cast-in-place concrete Work in accordance with ACI 301, 318, 304, 305, and 306, unless specified otherwise in this Section.
1.5 SUBMITTALS
A. Submit concrete mix designs with certifications at least 14 days prior to start of Work.:
PG 16 OF 28
B. Product Data: Submit manufacturer’s product data for the following:
1. Concrete admixtures.
2. Grout.
3. Curing compound.
4. Bonding compound.
5. Epoxy bonding system.
C. Aggregates: Submit test reports showing compliance with specified quality and gradation.
D. Quality Control Submittals: Submit the following information related to quality assurance requirements specified.
1. Design data: Submit proposed mix designs and test data before concrete operations begin.
Identify for each mix submitted the method by which proportions have been selected.
a. For mix designs based on field experience, include individual strength test results, standard deviation, and required average compressive strength f(cr) calculations.
b. For mix designs based on trial mixtures, include trial mix proportions, test results, and graphical analysis and show required average compressive strength f(cr).
c. Indicate quantity of each ingredient per cubic yard of concrete.
d. Indicate type and quantity of admixtures proposed or required.
2. Test reports: Submit laboratory test reports for all testing agency certifying that all materials furnished under this section conform to specifications.
3. Certifications: Submit affidavits from an independent testing agency certifying that all materials furnished under this section conform to specifications.
4. Certifications: Provide certification from manufacturers of concrete admixtures that chloride content complies with specified requirements.
5. Certifications: Provide certification from an independent testing agency that mechanical connectors for reinforcing steel comply with specified requirements.
6. Delivery tickets: Submit copies of delivery tickets complying with ASTM C 94 for each load of concrete delivered to site.
a. Include on the tickets the additional information specified in the ASTM document.
7. Cold weather concreting: Submit description of planned protective measures.
PG 17 OF 28
PART 2 - PRODUCTS
2.1 FORMS
A Plywood: PS 1, C Grade Douglas Fir or Spruce species; CD grade; sound, undamaged sheets with clean true edges.
B. Lumber: Pine or Fir species; construction grade.
C. Prefabricated Steel or Fibrous Glass Reinforced Resin Type: matched, tight fitting, stiffened to support weight of concrete.
D. Form Ties: Snap-off metal type of adjustable length, cone type.
E. Form Release Agent: Colorless mineral oil which will not stain concrete or impair natural bonding of coatings specified to be applied to concrete surface.
F. Formed Construction Joints for Slab-on Grade: Galvanized steel or extruded plastic, tongue and groove type profile, knockout holes to receive dowelling.
2.2 REINFORCEMENT
A Reinforcing Steel: ASTM A615, 60 ksi yield grade; deformed billet steel bars, plain finish.
B. Steel Dowels: ASTM A615, 60 ksi yield grade. deformed billet steel bars.
1. Construction Joints: Deformed billet steel bars.
2. Expansion Joints: Smooth billet steel bars.
3. Dowel Caps: Rigid, heavy duty plastic, sized for the respective required dowel
C. Welded Steel Wire Fabric: ASTM A185, plain type, in flat sheets or coiled rolls, plain finish.
D. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for support of reinforcing.
E. Fabricate concrete reinforcing in accordance with ACI 318.
2.3 CONCRETE
A. Provide concrete with the following characteristics:
1. Cement: ASTM C150, Normal-Type I, Portland type or blended hydraulic cement, or blended supplemental cementitious materials complying with the KDOT Standard Specifications.
Specifications (KDOTSS), July 2015 edition, for the respective application.
2. If design substitutes fly ash for cement, no more that 10% of the cement by weight shall be substituted with Class C fly ash.
PG 18 OF 28
3. Minimum Compressive Strength: 4,000 psi, 28 days.
4. Slump:
a. Flatwork: 3-inches (+/- ¾-inch). Subject to review and acceptance by the Engineer, the allowable slump may be increased with use of water- reducing agents to improve workability.
b. Curbs : 2½-inches (+/- ¾-inch). Exterior
c. Steps: 4-inches (+/-) 1-inch
5. Mix and deliver concrete in accordance with ASTM C94.
6. Add air entraining (ASTM C260) agent to concrete mix for concrete exposed to exterior. (5-
7%)
B. Aggregates: Aggregates shall meet durability requirements of KDOT, Class I.
1. Fine Aggregates: ASTM C33.
2. Coarse Aggregates: ASTM C33, sieve size designation #67 (unless otherwise approved by the Engineer), severe weathering class designation.
C. Water: Clean and not detrimental to concrete.
D. Other Admixtures, as may be applicable (in accordance with ACI 301):
1. Water-reducing admixture: Add as required for placement and workability.
2. Water-reducing and retarding admixture: Add as required in concrete mixes to be placed at ambient temperatures above 90 degrees F.
3. Water-reducing and accelerating admixture: Add as required in concrete mixes to be placed at ambient temperatures below 50 degrees F.
4. Do not use admixtures not specified or approved.
2.4 COMPOUNDS, HARDENERS AND SEALERS:
A. Curing Compound: ASTM C309, Type 2, Class A; white
B. JOINT PROTECTION: Joints, COMPOUNDS AND HARDENERS:
1. EXPANSION AND ISOLATION JOINTS
a. Expansion joints shall be installed as needed or in locations as indicated on the Plans and in accordance with plan details.
PG 19 OF 28
b. Expansion joints shall utilize ¾" wide redwood lumber. The lumber shall be B Grade or better quality.
c. Expansion joints shall be sealed with a premium grade, two-component polyurethane based elastomeric sealant. The sealant shall be Sikaflex – 2c NS or approved equal. All concrete surfaces to be in contact with the sealant shall be primed with Sikaflex 429 Primer or approved equal. The installation of the sealant and primer shall be in strict accordance with the manufacturer’s recommendations
2. CONTRACTION JOINTS
a. Contraction joints shall be placed at locations as needed or as indicated on the plans.
Contraction joints may be hand tooled or saw cut at the Contractor’s option. The Contractor shall generally install contraction joints that will result in panels of concrete that are as near square as possible.
b. If the Contractor elects to saw cut contraction joints, the joints shall be sawed as soon as possible after finishing such that damage to the concrete will not occur. Sawed construction joints shall be thoroughly cleaned following sawing operations. If contraction joints are not installed in a timely manner, which results in uncontrolled cracking, the Contractor will be required to replace damaged concrete at his expense.
PART 3 - EXECUTION
3.1 FORMWORK ERECTION:
A. Erect formwork, shoring and bracing to achieve design requirements.
B. Forms shall be set to construct slabs, walks, steps, and ramps within the tolerances allowed by the applicable portions of the ADA
C. Camber slabs and framing to achieve ACI 301 tolerances.
D. Provide bracing to ensure stability of formwork.
E. Apply form release agent to formwork in accordance with manufacturer's instructions, prior to placing for accessories and reinforcement.
F. Do not apply form release agent where concrete surfaces will receive special finishes, which are affected by agent.
G. Clean forms as erection proceeds, to remove foreign matter.
H. Forms shall be set plumb, properly aligned, to provide smooth, even layout.
3.2 INSERTS, EMBEDDED COMPONENTS, AND OPENINGS:
A. Provide formed openings where required for Work to be embedded in and passing through
PG 20 OF 28
concrete members.
B. Coordinate Work of other Sections in forming and setting openings, slots, recesses, chases, sleeves, bolts, anchors, and other inserts.
C. Install concrete accessories at proper elevation, straight, level, and plumb.
D. Place formed construction joint device in slab pattern pouring sequence.
E. Install void forms in accordance with manufacturer's instructions. Protect forms from moisture before concrete placement and from crushing during concreting operations.
3.3 REINFORCEMENT
A. Place reinforcement, supported and secured against displacement. Use the appropriate chairs, spacers, and other devices to support reinforcement.
B. Ensure reinforcing is clean, free of loose scale, dirt, or other foreign coatings.
3.4 PREPARATION:
A. Verify that compacted subgrade is at required moisture levels, stable and ready to support imposed loads.
B. Verify gradients and elevations of subgrade are correct.
C. Remove loose and organic materials prior to concrete placement.
3.5 AGGREGATE BASE COURSE:
A. Concrete Base Course Shall Be AB-3. Graded crushed limestone aggregate, meeting the requirements of SCA-5 or SS-5 in KDOT Standard Specifications, acceptable equivalent, or may be substituted.
B. Place in layers not exceeding six (6”) inches in compacted thickness.
C. Compact to a minimum density of 95% (standard proctor) at optimum moisture. Maintain moisture content until concrete placement.
D. Finish base course to within 0.1 feet of required elevations.
3.6 EXPANSION JOINT PLACEMENT:
A. Pedestrian Pavements: Place joints at 50-foot intervals, unless otherwise specified, and at major directional changes/intersections of paving. Secure filler material to formwork, in straight lines and vertical position. Recess top of filler ¾-inch, unless otherwise specified, to allow for joint sealant.
B. Isolation Joints: Place isolation joints with filler material where pavements abut buildings, structures, curbs, existing rigid pavements, and other appurtenances. Secure filler material to
PG 21 OF 28
formwork, in straight lines and vertical position. Recess top of filler ¾-inch, unless otherwise specified, to allow for joint sealant.
3.7 PLACEMENT
A Place concrete in accordance with Section 03 3000 – CAST-IN-PLACE CONCRETE.
B. Do not disturb reinforcement or formwork components during concrete placement.
C. Place concrete continuously between predetermined joints.
D. Surface shall be uniform, without ridges and depressions, and able to drain.
E. Joint pavement as shown in the Drawings.
3.8 ADA DETECTABLE
A Coordinate and install all necessary forming, block-outs, inserts, and embedded components required for installation of ADA detectable warning surface system.
B. See Section 32 1726 – TACTILE WARNING SURFACING for installation requirements.
3.9 SEALANTS
A Apply joint sealant after curing to joints specified below. Prevent spillage and excess sealant.
Maintain top of sealant at ¼-inch below surface, unless otherwise specified. See Section 32 1373-
RIGID PAVEMENT JOINT PROTECTION
3.10 PLACING CONCRETE:
A Separate slabs-on-grade from vertical surfaces with joint filler, extended from bottom of slab to within ¾-inch (unless otherwise specified) of finished slab surface.
B. Place concrete continuously between predetermined expansion, control, and construction joints. Do not break or interrupt successive pours such that cold joints occur.
C. Where new concrete is dowelled to existing work, drill holes in existing concrete, insert steel dowels and pack with non-shrink grout.
D. Screed floors and slabs-on-grade uniformly, maintaining surface flatness of maximum ¼-inch in 10
ft. to prevent unevenness and the formation of "birdbaths."
E. Consolidate concrete as required by mechanical vibrator supplemented by rodding, spading, or tamping. Do not vibrate forms or reinforcement. Do not over-vibrate, segregate concrete mix, or transport concrete in forms by use of vibrator.
3.11 FORMS
PG 22 OF 28
A Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads.
B. Remove formwork progressively and in accordance with code requirements.
3.12 CONCRETE FINISHING:
A Finish concrete floor surfaces in accordance with ACI 301.
B. Uniformly spread, screed, and float concrete.
C. Heavy broom finish exterior slab surfaces. *Unless Otherwise Noted On Drawings.
D. Maintain surface flatness, with maximum variation of ¼-inch in 10 ft.
E. Finish shall comply with applicable portions of the ADA.
F. Grout voids left after form removal where acceptable to Engineer.
3.13 CURING:
A Place absorptive matting and dampen as required.
B. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical damage.
C. Apply curing compound in accordance with the manufacturer's recommendations.
D. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.
E. Prior to sealant application, clean all joints by lightly sandblasting and/or another acceptable method to remove curing compound, loose material, and other deleterious substances hindering proper sealant application. Do not damage appearance of joint finish.
F. Apply joint sealants in accordance with RIGID PAVEMENT JOINT PROTECTION and manufacturer’s recommendations. Any such spillage shall be cleaned up immediately.
3.14 TESTING:
A Compressive Strength: Test cylinders in accordance with ASTM C31 and ASTM C39. Minimum four specimens per sample.
B. Frequency: Compression test samples shall be taken for each day's pour exceeding five (5) cu. yds.
plus additional for each 50 cu. yds. over and above the first 25 cu. yds. of each concrete class placed in one day. Test samples shall be taken in middle of a loading during concrete placement (not at
PG 23 OF 28
beginning). Of each sample, one specimen shall be tested at 7 days, two specimens tested at 28 days, and one retained in reserve or later testing if required.
C. One slump test shall be taken for each set of test samples taken. Perform in accordance with ACI 301.
D. Remove and replace defective concrete
3.15 FINISHING
A Sidewalk and Pedestrian Pavement Surfaces: Light broom finish with radius and troweled joint edges and joints. Produce slip-resistant finish in accordance with the ADA.
B. Curb Ramp Surfaces: Light rake or heavy broom finish. Produce slip-resistant finish in accordance with the ADA.
C. Apply curing compound on exposed concrete surfaces immediately after finishing. Apply in accordance with manufacturer's recommendations.
D. Protect finish from damage due to premature drying, excessive hot or cold temperatures, and mechanical damage and from cosmetic damage resulting from discoloration.
3.16 TOLERANCES:
A Maximum variation in surface flatness/uniformity shall be ¼-inch measured along a 10-foot straight edge.
B. Finish elevations shall be within ½-inch of the elevations shown on the Drawings, unless otherwise specified or directed by the Engineer.
C. Maximum slope tolerances in accordance with the ADA:
1. Max. ¼-inch per ft.: Walk cross-slopes, ramp cross-slopes, landings, building entrance approaches, and at ADA parking and loading facilities.
2. Max. 1-ft. per 20-ft.: Sidewalk profile slopes.
3. Max. 1-ft. per 12-ft.: Ramps and curb ramps.
- - END OF SECTION 32 1300 - -
PG 24 OF 28
SECTION 32 1373 – RIGID PAVEMENT JOINT PROTECTION
1.1. SCOPE OF WORK:
A Provide all labor, materials, tools, and equipment necessary to complete concrete pavement joint sealant Work.
B. Joints of a nature similar to that of joints indicated on the schedule shall be sealed with same sealer, whether indicated on drawings to be sealed or not.
1.2. SECTION INCLUDES:
A Preparing sealant substrate surfaces.
B. Placement of joint fillers, backing, and sealants.
1.3. SUBMITTALS
A Product data.
1.4. PROJECT CONDITIONS:
A Environmental Limitations: Do not install sealers if any of the following conditions exist:
1. Air or substrate temperature exceeds the range recommended by sealer manufacturers.
2. Substrate is wet, damp, or covered with snow, ice, or frost.
B. Dimensional Limitations: Do not install sealers if joint dimensions are less than or greater than that recommended by sealer manufacturer; notify the architect and get sealer manufacturer's recommendations for alternative procedures.
1.5. QUALITY
A Perform Work in accordance with sealant manufacturer's written requirements for surface preparation and materials installation.
B. Use personnel experienced with installation of the types of sealants specified.
1.6. WARRANTY
A Submit a written warranty signed by the Contractor guaranteeing to correct failures in sealer work that occur within 12 months after substantial completion, without reducing or otherwise limiting any other rights to correction which the owner may have under the contract documents. Failure is defined as failure to remain weathertight due to faulty materials or workmanship. Correction is limited to replacement of sealers.
PG 25 OF 28
PART 2 - PRODUCTS
2.1. MATERIALS -
A General: Provide only products which are recommended and approved by their manufacturer for the specific use to which they are put, and which comply with all requirements of the contract documents.
1. Provide only materials which are compatible with each other and with joint substrates.
2. Colors of exposed sealers: As selected by the Engineer from manufacturer's standard colors.
2.2. COLD-APPLIED SEALANTS - PEDESTRIAN
A Non-Sag Polyurethane: Single or multi-part, traffic grade complying with ASTM C920, Type S or M, Class 25 or higher, Grade NS, Class Use T, suitable for substrate Class M and O. Provide one of the following, or acceptable equivalent:
1. W.R. Meadows Sealtight “Pourthane NS.”
2. Pecora “DynaTred.”
B. Self-Leveling Polyurethane: Single or multi-part, traffic grade complying with ASTM C920, Type S or M, Class 25 or higher, Grade P, Class Use T, suitable for substrate Class M and O. Provide one of the following, or acceptable equivalent:
1. W.R. Meadows Sealtight “Pourthane SL.”
2. Pecora “Urexpan NR-200.”
C. Self-Leveling Polyurethane (for Sloping Applications): Single or multi-part, traffic grade complying with ASTM C920, Type S or M, Class 25 or higher, Grade P, Class Use T2,…