EVT9744_-_Construction_Plans.pdf
PDF 4 MB Posted
- Attached to
- GELR - Boller Point Boat Ramp
- Solicitation number
- EVT0009744
- Issued by
- Meade County, Chanute City, Kansas
About this file
This document contains the construction plans for the Boller Point Boat Ramp to serve the Glen Elder Wildlife Area in Cawker City, Kansas. The plans include a title sheet, existing conditions, site plans, grading plans, and detail sheets for three alternates. The construction plans detail the estimated quantities for items such as seeding/site restoration, excavation, erosion control, pavement removal, various rip rap, concrete ramp, concrete sidewalk, and filter course. No specific response due dates, award dates, or contract term information is provided in the document.
The construction plans provide estimated quantities for the base bid as well as three alternates. The alternates vary in the quantity of items such as rip rap and filter course. No pricing terms, set asides, incumbents, funding requirements, or other salient commercial details are included in the construction plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EVT0009744_-_GELR_Boller_Point_Boat_Ramp_-_RFQ.docx | DOCX document | |
| EVT9744_-_Specifications.pdf | ||
| Amendment_1_-_Boat_Ramp_Plans.docx | DOCX document | |
| GELR_-_Boller_Point_Boat_Ramp.pdf | ||
| Boat_Ramp_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B O
LL
ER
P O
IN
T
B O
A T
R A
M P
G
LE
N E
LD
ER
W
IL
D
LI
FE
A
R
EA
C A
W K
ER
C
IT
Y, K A
N S
A S
C O
N S
TR
U
C
TI
O N
P
LA
N S
TI
TL
E S
H
EE
T
CONSTRUCTION PLANS
FOR
BOLLER POINT BOAT RAMP
TO SERVE
GLEN ELDER WILDLIFE AREA
CAWKER, KANSAS
TABLE OF QUANTITIES
ITEM
ESTIMATED
QUANTITY UNIT
AS-BUILT
QUANTITY
SEEDING/SITE RESTERATION 1 L.S.
EXCAVATION 685 C.Y.
EROSION CONTROL 1 L.S.
PAVEMENT REMOVAL 3,251 S.Y.
1/2 TON RIP RAP 1,576 TONS
D50=12" RIP RAP 2,544 TONS
CONCRETE RAMP 331 S.Y.
CONCRETE SIDEWALK 131 S.Y.
6" FILTER COURSE 237 TONS
TABLE OF QUANTITIES - ALTERNATE 1
ITEM
ESTIMATED
QUANTITY UNIT
AS-BUILT
QUANTITY
SEEDING/SITE RESTERATION 1 L.S.
EXCAVATION 610 C.Y.
EROSION CONTROL 1 L.S.
1/2 TON RIP RAP 1361 TONS
6" FILTER COURSE 230 TONS
TABLE OF QUANTITIES - ALTERNATE 3
ITEM
ESTIMATED
QUANTITY UNIT
AS-BUILT
QUANTITY
SEEDING/SITE RESTERATION 1 L.S.
EROSION CONTROL 1 L.S.
1/2 TON RIP RAP 4,028 TONS
4" FILTER COURSE 55 TONS
6" FILTER COURSE 321 TONS
TABLE OF QUANTITIES - ALTERNATE 2
ITEM
ESTIMATED
QUANTITY UNIT
AS-BUILT
QUANTITY
SEEDING/SITE RESTERATION 1 L.S.
EXCAVATION 625 C.Y.
EROSION CONTROL 1 L.S.
1/2 TON RIP RAP 1511 TONS
6" FILTER COURSE 252 TONS
EXCAVATION 265 C.Y.
D50=12" RIP RAP 186 TONS
LL
ER
P O
IN
T
B O
A T
R A
M P
G
LE
N E
LD
ER
W
IL
D
LI
FE
A
R
EA
C A
W K
ER
C
IT
Y, K A
N S
A S
C O
N S
TR
U
C
TI
O N
P
LA
N S
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
O
LL
ER
P O
IN
T
B O
A T
R A
M P
G
LE
N E
LD
ER
W
IL
D
LI
FE
A
R
EA
C A
W K
ER
C
IT
Y, K A
N S
A S
C O
N S
TR
U
C
TI
O N
P
LA
N S
S
IT
E P
LA
N
LL
ER
P O
IN
T
B O
A T
R A
M P
G
LE
N E
LD
ER
W
IL
D
LI
FE
A
R
EA
C A
W K
ER
C
IT
Y, K A
N S
A S
C O
N S
TR
U
C
TI
O N
P
LA
N S
G R
A D
IN
G
P
LA
N melanie.levering Highlight
LL
ER
P O
IN
T
B O
A T
R A
M P
G
LE
N E
LD
ER
W
IL
D
LI
FE
A
R
EA
C A
W K
ER
C
IT
Y, K A
N S
A S
C O
N S
TR
U
C
TI
O N
P
LA
N S
D
ET
A
IL
S H
EE
T
CONCRETE COVER FOR REINFORCEMENT (ACI 318)
(UNLESS NOTED OTHERWISE ON THE DRAWINGS)
LOCATION MINIMUM COVER
CONCRETE CAST AGAINST AND
3"
PERMANENTLY EXPOSED TO EARTH
CONCRETE EXPOSED TO EARTH OR WEATHER
#6 AND LARGER 2"
#5 AND SMALLER 1 1/2"
CONCRETE NOT EXPOSED TO WEATHER
OR IN CONTACT WITH THE GROUND:
SLABS, WALLS, AND JOISTS
#14 AND LARGER 1 1/2"
#11 AND SMALLER 3/4"
BEAMS AND COLUMNS 1 1/2"
LL
ER
P O
IN
T
B O
A T
R A
M P
G
LE
N E
LD
ER
W
IL
D
LI
FE
A
R
EA
C A
W K
ER
C
IT
Y, K A
N S
A S
C O
N S
TR
U
C
TI
O N
P
LA
N S
D
ET
A
IL
S H
EE
T
| Sheets and Views |
| 1 TITLE SHEET |
| 2 EXISTING CONDITIONS |
| 3 SITE PLAN |
| 4 GRADING PLAN |
| 5 SITE PLAN - ALTERNATE 1 |
| 6 GRADING PLAN - ALTERNATE 1 |
| 7 CROSS SECTION - ALTERNATE 1 |
| 8 SITE PLAN - ALTERNATE 2 |
| 9 GRADING PLAN - ALTERNATE 2 |
| 10 CROSS SECTION - ALTERNATE 2 |
| 11 SITE PLAN - ALTERNATE 3 |
| 12 GRADING PLAN - ALTERNATE 3 |
| 13 CROSS SECTION - ALTERNATE 3 |
| 14 DETAIL SHEET |
| 15 DETAIL SHEET |
File details come from the government source that posted it. Updated .