About this file
This document contains construction documents for the Evolution program, which is an interior modifications project for a tenant space owned by the Assabet Valley Collaborative, the Awarding Authority. The project is located at 28 Lord Road, 2nd level suite in Marlborough, MA, within Middlesex County and Lowell City. The Awarding Authority is inviting bids from Flooring Contractors and Filed Sub-Bid Contractors for this project. The document does not provide details on item quantities, response dates, due dates, site visits, bidder's meetings and conferences, award dates, or the term of the contract including any renewal options.
The document does not contain information on pricing terms, set asides, incumbents, the current environment, funding requirements and sources, amounts and sources, or any other salient information.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTROL SCHEMATIC LEGEND
UH UNIT HEATER (WATER OR STEAM)
AIR HANDLING UNITAHU
AIR FLOW STATION
AIR COOLED CONDENSING UNITACCU
AFS
REVISION CLOUD
CAP EXISTING
CONNECT TO EXISTING
DRAWING REVISION NOTE
DEMOLITION WORK NOTE
EQUIPMENT DESIGNATIONACCU-1
EQUIPMENT TAGS
AIR CONDITIONING UNITAC
DRAWING NOTES
HEAT/COOL THERMOSTAT
SUPPLY DIFFUSER
SUPPLY DIFFUSER OR REGISTER BELOW DUCT
RETURN GRILLE
RETURN REGISTER OR GRILLE BELOW DUCT
VOLUME DAMPER
DUCTWORK LEGEND
AIR DEVICE LEGEND
RG
RG
SD/R
SD
DAMPER LEGEND
VD
LIMIT OF DEMOLITION
EXHAUST REGISTER OR GRILLEEG
EXHAUST REGISTER OR GRILLE BELOW DUCTEG
EXHAUST GRILLEEG
RG RETURN GRILLE
SD SUPPLY DIFFUSER
SR SUPPLY REGISTER
EXHAUST REGISTERER
RR RETURN REGISTER
SG SUPPLY GRILLE
SIDEWALL SUPPLY REGISTER SG
EG/RG SIDEWALL EXHAUST/RETURN REGISTER
QUANTITY
NECK SIZE OR LENGTH IF LINEAR DIFFUSER
AIR VOLUME (CFM)
SUPPLY/RETURN/EXHAUST REGISTER OR GRILLE
QUANTITY
NECK SIZE OR LENGTH IF LINEAR DIFFUSER
AIR VOLUME (CFM)
SUPPLY DIFFUSER DESIGNATION
TOILET EXHAUST FANTF
DEMOLITION SCOPE
HEAT PUMPHP
1. MECHANICAL WORK INDICATED (PIPING, DUCT, ETC.) IS DIAGRAMMATIC. EXACT LOCATIONS OF ALL COMPONENTS ARE TO BE DETERMINED IN THE FIELD (SPACING SUBJECT TO ARCHITECT'S REVIEW AND APPROVAL) TO AVOID CONFLICT WITH OTHER TRADES
AND EXISTING SITE CONDITIONS.
2. THE CONTRACTOR SHALL VISIT AND CAREFULLY EXAMINE THE SITE TO IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE WORK OF THIS SECTION. REPORT IN WRITING (THROUGH THE GENERAL CONTRACTOR) TO THE OWNER AND ARCHITECT ANY CONDITIONS WHICH MIGHT ADVERSELY AFFECT WORK. NO EXTRA PAYMENT WILL BE PROVIDED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY AN EXPERIENCED OBSERVER.
3. WORK REQUIRING INTERRUPTION OF BUILDING SERVICES SHALL BE CAREFULLY REVIEWED AND COORDINATED WITH THE OWNER TO
MINIMIZE FREQUENCY AND DURATION OF SERVICE INTERRUPTIONS.
4. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION OF CEILING GRID, DIFFUSERS, AND GRILLES.
5. ALL INSTALLATIONS SHALL PERMIT AND PROVIDE ACCESSIBILITY FOR SERVICE AND REPLACEMENT OF ALL NEW EQUIPMENT AND
EXISTING EQUIPMENT IMPACTED BY THIS WORK.
6. COORDINATE ALL OPENINGS IN FLOORS WITH STRUCTURAL DRAWINGS AND GENERAL CONTRACTOR.
7. COORDINATE ALL ROOF OPENINGS WITH ARCHITECT AND STRUCTURAL ENGINEER.
8. ALL MECHANICAL EQUIPMENT, PIPING, AND DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING LOCAL, STATE, AND FEDERAL SEISMIC CODES. PARTICULAR ATTENTION SHALL BE MADE TO VIBRATION ISOLATION, ANCHORING, AND BALANCING REQUIREMENTS.
9. ALL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH CODES AND STANDARDS SET FORTH IN NFPA, SMACNA, AND ASHRAE
FOR MEDIUM AND LOW PRESSURE DUCTWORK SYSTEMS.
10. PROVIDE MANUAL VOLUME DAMPERS AT ALL BRANCH DUCTS FOR AIR BALANCING. ALL VOLUME DAMPERS LOCATED ABOVE INACCESSIBLE CEILING OR BEHIND INACCESSIBLE WALL SHALL BE PROVIDED WITH REMOTE WIRE DAMPER AT THE AIR OUTLETS.
11. RUN-OUTS TO RETURN AND EXHAUST REGISTERS, OR GRILLES ABOVE GYP BOARD CEILINGS, SHALL BE RIGID DUCTED. NO FLEXIBLE
DUCT WORK SHALL BE ALLOWED ON RETURN OR EXHAUST REGISTERS.
12. ALL DUCTS, PIPES, AND EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM THE BUILDING STRUCTURE WITH PROPER
ALLOWANCES FOR CONTRACTION, EXPANSION, AND VIBRATION ELIMINATION.
13. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR FREE AREA REQUIRED.
14. ALL DIFFUSER, REGISTER, AND GRILLE SIZES INDICATED ON FLOOR PLANS ARE NECK SIZE REQUIRED.
15. NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED ON THIS PROJECT.
16. COORDINATE ENTIRE INSTALLATION WITH THE WORK OF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATIONS.
17. OBTAIN ALL REQUIRED PERMITS AND PAY ALL FEES RELATED TO SAME.
18. REVIEW ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, ELECTRICAL, FIRE PROTECTION AND SITE DRAWINGS BEFORE STARTING ANY WORK TO BECOME FAMILIAR WITH THE DETAILS OF CONSTRUCTION, AND COORDINATE WITH OTHER TRADES.
19. PROVIDE ALL NECESSARY PIPING, EQUIPMENT AND SUPPORTS AS WELL AS ANY ADDITIONAL EQUIPMENT, ETC. NOT SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS BUT NECESSARY TO PROVIDE COMPLETE AND WORKABLE SYSTEMS.
20. PROVIDE ACCESS TO ALL EQUIPMENT REQUIRING PERIODIC SERVICE AND MAINTENANCE.
21. DO NOT SCALE THESE DRAWINGS. TAKE ALL MEASUREMENTS IN THE FIELD IN COORDINATION WITH ALL EQUIPMENT AS APPROVED
AND WITH ALL OTHER TRADES.
22. FOR EQUIPMENT SCHEDULES, SEE SHEET H.002
23. ALL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA
24. DETAILS SHOWN ON SHEET H.002 ARE APPLICABLE TO ALL EQUIPMENT, EXCEPT WHERE INDICATED.
25. CONTRACTOR SHALL VERIFY DUCT, PIPING AND EQUIPMENT LOCATIONS FOR INTERFERENCES BEFORE INSTALLATION.
26. REFERENCE SHEET H.002 FOR SEQUENCE OF OPERATION OF NEW EQUIPMENT.
27. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.
GENERAL NOTES
DEMOLITION NOTES
1. PRIOR TO COMMENCING WORK OF THIS SECTION, EXAMINE SITE AND CONDITIONS UNDER WHICH WORK WILL BE PERFORMED.
DETERMINE EXACT LOCATIONS OF EXISTING EQUIPMENT, PIPING AND CONTROLS. REPORT TO OWNER ANY CONDITIONS THAT MIGHT ADVERSELY AFFECT WORK. COMMENCEMENT OF WORK SHALL BE CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS
AND PREPARATORY WORK.
2. ABANDONING OF DUCTWORK, PIPING OR EQUIPMENT IN PLACE SHALL NOT BE ALLOWED. COMPLETE REMOVAL REQUIRED UNLESS NOTED
OTHERWISE.
3. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED & CAP REMAINING DUCTS WITH SAME OR
COMPATIBLE DUCTWORK MATERIAL.
4. EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT.
5. EQUIPMENT TO BE SALVAGED: DISCONNECT, CAP SERVICES, REMOVE EQUIPMENT, DELIVER TO OWNER.
6. COMPLY WITH ALL STATE & LOCAL CODES AS TO REMOVAL & DISPOSAL OF EQUIPMENT FROM SITE.
7. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING SELECTIVE DEMOLITION.
8. REMOVE PREVIOUSLY ABANDONED WORK IN THE WAY OF EXISTING CONSTRUCTION, OR AS NOTED.
9. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
10. PERMITS: GIVE ALL REQUIRED NOTICES, FILE ALL REQUIRED PLANS AND SPECIFICATIONS RELATING TO THE WORK OF THIS SECTION
WITH THE PROPER AUTHORITIES AND PAY FOR ANY REQUIRED PERMITS.
11. ALL AIR-CONDITIONING EQUIPMENT AND SYSTEMS SHALL BE REMOVED OR DEMOLISHED WITHOUT RELEASING REFRIGERANTS.
REFRIGERANT RECOVERY IS TO BE PERFORMED BY A REFRIGERANT RECOVERY TECHNICAL CERTIFIED BY AN EPA-APPROVED
CERTIFICATION PROGRAM.
12. ALL EQUIPMENT AND SYSTEMS TO BE REMOVED OR DEMOLISHED UNDER THIS SECTION AND NOT DESIRED BY OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE ALL SUCH EQUIPMENT FROM THE SITE PROMPTLY AFTER
DETACHMENT FROM BUILDING STRUCTURE.
WB WET BULB TEMPERATURE (°F)
ETBR
ETR
EXISTING TO BE REMOVED
EXISTING TO REMAIN
EXH
EX. EXISTING
EXHAUST
GALLONS PER MINUTE
GENERAL CONTRACTORGC
GPM
HP HORSE POWER
KILOWATTSKW
ID
IN
HVAC HEATING, VENTILATION AND AIR CONDITIONING
INCHES
INSIDE DIAMETER
MECHANICALMECH
MBH
LAT LEAVING AIR TEMPERATURE
THOUSANDS OF BRITISH THERMAL UNITS PER HOUR
FEET
COMBINATION FIRE AND SMOKE DAMPER
FEET PER MINUTEFPM
FT
FSD
GAL GALLONS
POUNDS PER SQUARE INCH
PRESSURE DROP
PSI
PD
RA RETURN AIR
RM ROOM
PLUMBING CONTRACTOR
OUTSIDE DIAMETEROD
PC
OUTSIDE AIR TEMPERATUREOAT
NTS NOT TO SCALE
STATIC PRESSURESP
SPD SPEED
SS STAINLESS STEEL
SUPPLY AIRSA
SAT SUPPLY AIR TEMPERATURE
EACHEA.
DRAWINGDWG
ENTERING AIR TEMPERATURE
EXHAUST AIREA
EAT
DIA.
DN
DB DRY BULB TEMPERATURE (°F)
DIAMETER
DOWN
CONTR CONTRACTOR
CONNECTCONN.
ABBREVIATIONS
DRAINDR
ELECTRICAL CONTRACTOREC
EXTERNAL STATIC PRESSUREESP
HEATING COILHC
SQUARE FEETSF
WMS WIRE MESH SCREEN
TYPICALTYP
OA OUTSIDE AIR
EXHAUST FANEF
OPEN END DUCTOED
TF TOILET EXHAUST FAN
CUBIC FEET PER MINUTECFM
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BTUH
BTU
CONDENSATE DRAINCD
ACOUSTICALLY LINED DUCTWORK - SINGLE LINE
DUCTWORK TRANSITION - SINGLE LINE
FLEXIBLE DUCTWORK - SINGLE LINE (MAX. LENGTH 5'-0")
RECTANGULAR SUPPLY DUCTWORK UP - SINGLE LINE
RECTANGULAR SUPPLY DUCTWORK DOWN - SINGLE LINE
RECTANGULAR RETURN/EXHAUST DUCTWORK UP - SINGLE LINE
ROUND DUCTWORK DOWN - SINGLE LINE
ROUND DUCTWORK UP - SINGLE LINE
RECTANGULAR RETURN/EXHAUST DUCTWORK DOWN - SINGLE LINE
EXISTING DUCTWORK - SINGLE LINE
EXISTING DUCTWORK TO BE REMOVED - SINGLE LINE
NEW RETURN/EXHAUST DUCTWORK - SINGLE LINE
NEW SUPPLY DUCTWORK - SINGLE LINE
1/2" WIRE MESH SCREEN (ON OPEN END DUCT)
VD
FAN SCHEDULE
TYPETAG No. SERVED
LOCATION(S)
(AS STANDARD)(AS STANDARD)
MANUFACTURER MODEL No. ELECTRICAL DATA
PHASE
FAN DATA
LOW CFM HIGH CFM SP(IN) VOLTS
REMARKS
WATTS
WEIGHT
TF-1 PANASONIC CEILING MOUNT - 75 0.0 120 1 6 PROVIDE WITH DISCONNECT-SINGLE TOILET RESTROOM FV-0511VF1
(LBS)
DUCT
DUCT
DUCT
DUCT
HANGER
LIGHT PIPE
AS USED FOR
W/ ACCESSORIES
HANGER ROD
ALL-THREAD
GAUGE AS DUCT
OF SAME METAL
1" (25.4-MM) WIDE
SHEET METAL BAND
GAUGE AS DUCT
OF SAME METAL
1" (25.4-MM) WIDE
SHEET METAL STRAP
1"
SHEET METAL STRAP
OF SAME METAL
GAUGE AS DUCT
1" (25.4-MM) WIDE
ANGLE - NOT LESS THAN
1" X 1" X 1/8" (25.4 X
25.4 X 3 MM), SIZED TO
MATCH DUCT.
SHEET METAL DUCT HANGERS
PARTITION
PARTITION
NOTE 1
NOTE:
DUCT PENETRATION
SHOWN IS WHERE
FIRE DAMPER IS
NOT REQUIRED BY
CODE.
NOTES:
1. AT FIRE RATED PARTITIONS, ADD ADDITIONAL LAYER OF FIRE SAFING
INSULATION AROUND PENETRATION SO AS TO FILL CAVITY.
2. DUCT AND PIPE PENETRATIONS THRU CORRIDOR WALLS ABOVE THE
CEILING ARE TO BE FIRE STOPPED AROUND THE PENETRATION.
PIPE SLEEVE
STEEL FRAME OF
ANGLE 1 1/4" X 1 1/4" X 1/8"
AROUND DUCT PERIMETER
1/2" MAX (TYP)
1/2" MAX (TYP)
NO SCALE NO SCALE
HVAC SEQUENCE OF CONTROLS
HVAC SCHEDULE
HVAC DETAILS
THE EXHAUST FAN SHALL BE INTERLOCKED WITH THE SPACE LIGHT SWITCH.
THE SEQUENCE LISTED BELOW IS REVERSIBLE UNLESS NOTED OTHERWISE.
WHEN THE SWITCH IS IN THE "ON" POSITION, THE EXHAUST FAN SHALL
INCREASE TO MAX SPEED 75 CFM. WHEN THE SWITCH IS IN THE "OFF"
POSITION THE FAN SPEED SHALL DECREASE BACK TO MINIMUM SPEED.
APPLICATION TABLE
TOILET EXHAUST FAN
TF-1
TOILET EXHAUST FAN
SEQUENCE OF OPERATION
LIGHT SWITCHSEXHAUST
EXHAUST FAN
DUCT AND PIPE PENETRATIONS
NEW WORK NOTE
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a v i s
A .I
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st
.n et
V isi t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V I
S
R C
H I
T E
C T
S
O ur
9t h Ye ar
(2
2-se rv in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
H.001
H
VA
C Le ge nd
, S ch ed ul e, D et ai ls
S eq ue nc e of
C on tr ol
AutoCAD SHX Text T
AutoCAD SHX Text 10"%%C, 12"x12" SG-A, RG-A or EG-A
AutoCAD SHX Text
200 CFM
AutoCAD SHX Text
(TYP. OF 3)
AutoCAD SHX Text 12"x12", SD
AutoCAD SHX Text
200 CFM
AutoCAD SHX Text
(TYP. OF 3)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RETURN GRILLE
E.T.R.
SUPPLY DIFFUSER
E.T.R.
SUPPLY DIFFUSER
E.T.R.
RETURN GRILLE
E.T.R.
SUPPLY DIFFUSER
E.T.R.
SUPPLY DIFFUSER
E.T.R.
SUPPLY DIFFUSER
E.T.R.
SUPPLY DIFFUSER
E.T.R.
RETURN GRILLE
E.T.R.
EXISTING
CEILING CASSETTE
EXISTING
CEILING CASSETTE
EXISTING
SUPPLY DIFFUSER
EXISTING
SUPPLY DIFFUSER
EXISTING
SUPPLY DIFFUSER
EXISTING
SUPPLY DIFFUSER
EXISTING
SUPPLY DIFFUSER
EXISITNG
SUPPLY DIFFUSER
EXISTING
RETURN GRILLE
SCALE: 1/8"=1'-0"1 Second Floor Demolition Plan
HVAC DEMOLITION NOTES
1. HVAC EQUIPMENT UNCHANGED IN THIS PHASE.
2. EXISTING SUPPLY DIFFUSER TO BE RELOCATED. REMOVE, CLEAN AND STORE FOR FUTURE USE.
3. EXISTING FAN COIL TO BE RELOCATED. MAKE SAFE AND RECLAIM ALL REFRIGERANT IN SYSTEM.
STORE FOR FUTURE USE. DISCONNECT ALL REFRIGERANT AND CONDENSATE PIPING, CONTROL
WIRING, ELECTRICAL WIRING ETC.
4. EXISTING RETURN GRILLE TO BE RELOCATED. REMOVE, CLEAN AND STORE FOR FUTURE USE.
2 4
W.
Dryer
EXISTING
RETURN
GRILLE
EXISTING
SUPPLY
DIFFUSER
EXISTING
SUPPLY DIFFUSER
RETURN GRILLE
E.T.R.
EXISTING
SUPPLY DIFFUSER
EXISTING
SUPPLY DIFFUSER
EXISTING
SUPPLY DIFFUSER
RETURN GRILLE
E.T.R.
EXISTING
CEILING CASSETTE
MOVED FROM
PREVIOUS
LOCATION
EXISTING SD
MOVED FROM
PREVIOUS LOCATION
EXISTING SD
MOVED FROM
PREVIOUS LOCATION
SCALE: 1/8"=1'-0"2 Second Floor New Work Plan
HVAC NEW WORK NOTES
1. EXISTING SUPPLY DIFFUSER NEW LOCATION.
2. USE EXISTING DUCT AND EXISTING VOLUME DAMPER, WHERE APPLICABLE, OR NEW DUCT AND
NEW VOLUME DAMPER (12"Ø), WHERE NEEDED. FLEXDUCT NOT TO EXCEED 5'-0" IN LENGTH.
3. CONNECT EXHAUST DUCT FROM TF-1 TO EXISTING HALLWAY BATHROOM EXHAUST DUCT.
4. EXISTING FAN COIL NEW LOCATION. EXTEND ALL REFRIGERANT AND CONDENSATE PIPING AS
NEEDED AND CONNECT TO EXISTING FAN COIL. EXTEND ALL CONTROL WIRING AND ELECTRICAL
WIRING AS NEEDED AND CONNECT TO EXISTING FAN COIL.
5. EXISTING RETURN GRILLE NEW LOCATION.
EXISTING SD
MOVED FROM
PREVIOUS
LOCATION
TF-1
4" Ø
EA
EXISTING SD
MOVED FROM
PREVIOUS LOCATION
EXISTING SD
MOVED FROM
PREVIOUS LOCATION
EXISTING SD
MOVED FROM
PREVIOUS LOCATION
EXISTING RG
MOVED FROM
PREVIOUS
LOCATION
EXISTING
CEILING CASSETTE
MOVED FROM
PREVIOUS LOCATION
SUPPLY
DIFFUSER
E.T.R.
24x24 RETURN GRILLE
TO PLENUM SPACE
24x24 RETURN GRILLE
TO PLENUM SPACE
VD VD
VD
VDVD
VD
T
T
T
T
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V
C
H I
T E
C T
S
O ur
9t h
2-in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
H.101
H
VA
C Se co nd
F lo or D em ol iti on a nd
N ew
W or k Pl an s
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
T
DANDY (RISER) CLEANOUTDCO
GENERAL NOTES
OR RISER DIAGRAMS, THE LARGER PIPE SIZE SHALL BE FOLLOWED.
IN THE EVENT THAT THERE ARE DISCREPANCIES BETWEEN PIPE SIZES SHOWN ON THE PLANS VERSUS THAT SHOWN ON THE DETAILS28.
IN THE FIELD AND IN CONJUNCTION WITH COORDINATION BETWEEN ALL OTHER TRADES AT THE SIGHT.
WH NON-FREEZE WALL HYDRANT
DN DOWN
SANITARY
WASTE
INDIRECT WASTE
NOT TO SCALE
WASTE & TRAP
HOT WATER
TYP
FCO
P-#
GC
TYPICAL
GENERAL CONTRACTOR
FLOOR CLEANOUT
FIXTURE NUMBER
NTS
W&T
S
IW
W
HW
V VENT
VENT THROUGH ROOFAFF
BV
ABBREVIATIONS
CTE NEW CONNECTION TO EXISTING
ABOVE FINISH FLOOR
BOW VENT
VTR
BV BOW VENT
AND CUT SHEETS TO THE LOCAL WATER AUTHORITY FOR APPROVAL. NO BACK FLOW PREVENTION DEVICE SHALL BE INSTALLED UNTIL WRITTEN APPROVAL OF ALL BACK FLOW PREVENTION DEVICES HAS BEEN OBTAINED BY THE PLUMBING CONTRACTOR FROM THE LOCAL WATER AUTHORITY.
PREVENTION DEVICES AND SHALL INDICATE THE SIZES AND MODEL NUMBERS BEING USED. THE PLUMBING CONTRACTOR SHALL SUBMIT THESE DRAWINGS AND DETAILS OF THEIR INSTALLATION METHODS. THE PLUMBING CONTRACTOR SHALL ALSO OBTAIN MANUFACTURER CUT SHEETS OF ALL BACK FLOW THE PLUMBING CONTRACTOR SHALL CREATE A SCALE DRAWING FOR THE BUILDING SHOWING THE LOCATIONS OF ALL BACK FLOW PREVENTION DEVICES
PLUMBER SHALL FURNISH AND INSTALL ALL TRAPS, ANGLE STOPS, WASTE ARMS, STRAINERS, TAILPIECES, FIXTURE SUPPLIES AND ALL PLUMBING CONNECTIONS TO ALL PLUMBING FIXTURES REQUIRING PLUMBING AND AS REQUIRED FOR A COMPLETE PLUMBING SYSTEM.
ARCHITECT FOR ALL PLUMBING FIXTURE TYPES, QUANTITIES AND LOCATIONS PRIOR TO PURCHASE ALL PLUMBING FIXTURE TYPES AND LOCATIONS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL HAVE THE APPROVAL OF THE
THE TERM "CONTRACTOR" SHALL MEAN PLUMBING CONTRACTOR
26.
27.
25.
24.
ALL PIPING MATERIALS, FITTINGS VALVES UNIONS, HANGERS, EQUIPMENT, INSTALLATION AND ALL ASPECTS OF THE PLUMBING WORK
THE INFORMATION SHOWN ON THE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTES OF PIPING OR LOCATIONS OF VALVES, DRAINS, EQUIPMENT, FIXTURES OR FINAL CONNECTIONS. IT SHALL BE THE
ALL NEW SYSTEMS SHALL BE TESTED, BALANCED AND ADJUSTED TO ENSURE PROPER OPERATION AND CODE COMPLIANT INSTALLATION
THE CONTRACTOR SHALL BE CAREFUL TO ENSURE THAT NO CROSS CONNECTIONS ARE MADE BETWEEN THE POTABLE WATER SUPPLY AND
EQUIPMENT. CONTRACTOR SHALL PATCH ALL SURFACES TO MATCH THE EXISTING CONDITIONS AND TO THE SATISFACTION OF THE ARCHITECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF WALLS AND FLOORS TO ACCOMMODATE INSTALLATION OF NEW PIPING AND
PLUMBING CONTRACTOR SHALL PROVIDE FIRE STOPPING FOR ALL PENETRATIONS THROUGH ALL FLOORS, FIRE WALLS AND FIRE RATED SEPARATIONS. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR THESE AREAS AND PROVIDE LINK SEAL FIRE STOPPING KITS.
IN THE FIELD. ALL NEW SYSTEMS SHALL BE COORDINATED WITH ALL EXISTING CONDITIONS AND TRADES. EXACT LOCATIONS
PRIOR TO BID, THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH ALL TRADE DRAWINGS AND ALL ASPECTS OF THE WORK AND
PLUMBING CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN ALL SCAFFOLDING, HOISTING
ALL PLUMBING PIPING AND DRAINS SHALL BE KEPT CLEAR OF BLOCKAGE WHILE CONSTRUCTION IS UNDERWAY.
ALL CONDITIONS TO WHICH THE WORK WILL BE INSTALLED. ANY DISCREPANCIES BETWEEN THE WORK SHOWN
RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO DETERMINE THE BEST ROUTES OF PIPING AND LOCATIONS OF PIPING CONNECTIONS
SHALL BE AS APPROVED BY THE MASSACHUSETTS STATE PLUMBING CODE
DIELECTRIC INSULATING FITTINGS SHALL BE USED WHERE PIPES OF DISSIMILAR METALS
PIPING AND EQUIPMENT SHALL BE TESTED IN ACCORDANCE WITH THE STATE PLUMBING CODE
ALL EXISTING CONDITIONS SHOWN ARE APPROXIMATE ONLY. ALL EXISTING CONDITIONS SHALL BE VERIFIED
OF ALL CONNECTIONS TO EXISTING SYSTEMS AND EQUIPMENT SHALL BE DETERMINED IN FIELD.
ON THE DRAWINGS AND ANY CONDITIONS SHALL BE SUBMITTED TO THE ARCHITECT IN WRITING.
ALL PLUMBING WORK SHALL BE DONE IN ACCORDANCE WITH THE MASSACHUSETTS STATE PLUMBING AND FUEL GAS CODE
NO STRUCTURAL MEMBERS SHALL BE CUT
PROVIDE DRAW OFFS WITH BALL VALVE, HOSE END VACUUM BREAKER, CAP & CHAIN AT ALL
PROVIDE ACCESSIBLE CLEANOUTS AT THE BASE OF ALL STACKS, AS SHOWN, AND AS REQUIRED.
ALL PIPING SHOWN DIAGRAMMATICALLY AND ALL EXACT LOCATIONS SHALL BE DETERMINED IN THE FIELD
ALL PIPING SHALL BE RUN CONCEALED ABOVE CEILINGS, IN WALLS AND IN CHASES WHEREVER POSSIBLE
RUN WATER PIPE ON THE WARM SIDE OF BUILDING INSULATION. NO WATER PIPING SHALL BE RUN IN EXTERIOR WALLS
ALL PIPING SHALL BE NEW, INSTALLED PARALLEL TO BUILDING LINES AND PITCHED TO LOW POINTS
13.
ALL SOURCES OF CONTAMINATION OR CROSS CONNECTION.
EQUIPMENT, DERRICKS, ETC., NECESSARY FOR INSTALLATION OF WORK.
ALL PLUMBING PIPING SHALL BE DEBURRED BEFORE JOINTS ARE MADE.
ARE CONNECTED, AND AT THE WATER HEATER.
PROVIDE SERVICE STOPS FOR ALL FIXTURES23.
19.
20.
22.
21.
18.
17.
15.
16.
14.
DOMESTIC WATER LOW POINTS AND PITCH PIPING TO DRAIN.
ALL PIPING SHALL BE SUPPORTED FROM BUILDING STRUCTURE.
CAREFULLY COORDINATE LOCATION OF PIPING WITH ALL OTHER TRADES AND ALL EXISTING CONDITIONS
12.
11.
9.
10.
8.
7.
6.
5.
4.
2.
3.
1.
FAILURE OF THE CONTRACTOR TO DO SO SHALL NOT CONSTITUTE AN EXTRA COST TO THE CONTRACT.
ALL WATER PIPING MAINS AND BRANCH RUNOUTS THAT ARE EXPOSED SHALL BE COVERED WITH WHITE PVC PIPE COVERS. THIS SHALL INCLUDE ALL FITTINGS AND VALVES. ALL FITTINGS AND VALVES SHALL BE PROVIDED WITH INSULATION AND WHITE PREMOLDED PVC INSULATION COVERS
ARE CONNECTED, AND AT THE WATER HEATERS
ALL SOURCES OF CONTAMINATION OR CROSS CONNECTION.
ALL VALVES INDICATED SHALL BE BY CONBRACO.
DAMAGE TO THE PIPE INSULATION. 3/8" RODS SHALL BE USED.
PURCHASE AND INSTALLATION OF ANY PLUMBING SYSTEMS.
PROVIDE "P" TRAPS FOR ALL PLUMBING FIXTURE DRAINS
SHALL BE APPROVED BY THE ARCHITECT PRIOR TO PURCHASE.
ALL CLEANOUTS SHALL BE BY ZURN WITH BRONZE PLUGS. ALL CLEANOUTS SHALL BE TURNED UP INTO THE TENANT SPACE.
PROVIDE SERVICE STOPS FOR ALL FIXTURES
FLOOR DRAINS, CLEANOUTS, PUMPS, ETC. ALL SHOP DRAWINGS SHALL HAVE THE APPROVAL OF THE ENGINEER PRIOR TO
INTERFERENCES BETWEEN ANY EXISTING OR NEW CONDITIONS AND ANY OTHER TRADES.
THE DRAWINGS ARE DIAGRAMMATICAL ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT ROUTE OF ALL PIPING, IN THE FIELD AND IN CONJUNCTION WITH COORDINATION OF ALL EXISTING CONDITIONS, NEW CONSTRUCTION, AND COORDINATION WITH ALL OTHER TRADES TO ENSURE THE ALL OF THE PLUMBING SYSTEMS WILL FIT INTO THE SPACE WITH NO
ALL SHOCK ABSORBERS AND TRAP PRIMERS SHALL BE BY PRECISION PLUMBING PRODUCTS
HOSE BIBBS SHALL BE 1/2" CHROME FINISH WITH LOOSE KEY HANDLE AND 3/4" VACUUM BREAKER HOSE END CONNECTION.
SUBMIT SHOP DRAWINGS FOR ALL FIXTURES, TRIM, FAUCETS, VALVES, PIPING, INSULATION, WATER HEATERS
ALL PIPING MATERIALS, FITTINGS VALVES UNIONS, HANGERS, EQUIPMENT, INSTALLATION AND ALL ASPECTS OF THE PLUMBING WORK
SHALL BE AS APPROVED BY THE MASSACHUSETTS PLUMBING AND FUEL GAS CODES
THE CONTRACTOR SHALL BE CAREFUL TO ENSURE THAT NO CROSS CONNECTIONS ARE MADE BETWEEN THE POTABLE WATER SUPPLY AND
ALL EXPOSED PIPING, VALVES AND FITTINGS AT THE FIXTURES SHALL BE CHROME FINISH
ALL VALVES SHALL BE PROVIDED WITH TAGS, ALL PIPING SHALL BE LABELED WITH ADHESIVE DECALS PER ASME AND STATE PLUMBING CODE STANDARDS.
PROVIDE ACCESS PANELS BY MILACRON. ACCESS PANELS SHALL BE 18" X 18" AND SHALL BE WITH A PRIMED FINISH FOR PAINTING BY OTHERS. ACCESS PANELS SHALL BE GIVEN TO THE G.C. FOR INSTALLATION. ALL ACCESS PANELS
INSTALL SHOCK ABSORBERS BY PRECISION PLUMBING PRODUCTS AT ENDS OF HOT AND COLD WATER PIPING RUNS BELOW THE LAST FIXTURE
WITH NEOPRENE GASKET. DRAIN PIPING BELOW GROUND SHALL BE AS ABOVE EXCEPT FOR MECHANICAL JOINT WITH PUSH ON FITTINGS AND RESILIENT GASKET.
DRAIN AND VENT PIPING ABOVE GROUND LARGER THAN 2" SHALL BE SERVICE WEIGHT CAST IRON WITH STAINLESS STEEL HUBLESS FITTINGS AND COUPLINGS
EQUIPMENT. CONTRACTOR SHALL PATCH ALL SURFACES TO MATCH THE EXISTING CONDITIONS AND TO THE SATISFACTION OF THE ARCHITECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF WALLS AND FLOORS TO ACCOMMODATE INSTALLATION OF NEW PIPING AND
ALL PIPING SHALL BE NEW, INSTALLED PARALLEL TO BUILDING LINES AND PITCHED TO LOW POINTS PROVIDE ACCESSIBLE CLEANOUTS AT THE BASE OF ALL STACKS, AS SHOWN, AND AS REQUIRED.
DIELECTRIC INSULATING FITTINGS SHALL BE USED WHERE PIPES OF DISSIMILAR METALS
CAREFULLY COORDINATE LOCATION OF PIPING WITH ALL OTHER TRADES AND ALL CONDITIONS AT THE SITE.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL CONDITIONS AND COORDINATE BEST ROUTE OF NEW PIPING AND LOCATIONS OF NEW EQUIPMENT IN COORDINATION WITH THE WORK OF ALL OTHER TRADES AND ALL
CONDITIONS TO ENSURE THAT ALL WORK WILL FIT IN THE SPACE WITH NO INTERFERENCE'S
ALL NEW SYSTEMS SHALL BE TESTED, BALANCED AND ADJUSTED TO ENSURE PROPER OPERATION AND CODE COMPLIANT INSTALLATION.
BAND HANGERS SHALL BE USED TO SUPPORT PIPING, PIPE SHIELDS SHALL BE INSTALLED TO PROTECT AGAINST
ALL COLD WATER, HOT WATER, HOT WATER RETURN PIPING SHALL BE INSULATED WITH 1" FIBERGLASS INSULATION WITH FACTORY APPLIED JACKET. ALL FITTINGS AND VALVES SHALL BE PROVIDED WITH INSULATION AND WHITE PREMOLDED PVC INSULATION COVERS
ABOVE GROUND WATER PIPING SHALL BE TYPE "L" COPPER WITH SOLDER JOINTS USING 95/5 SOLDER. DRAIN AND VENT PIPING 2" AND SMALLER SHALL BE TYPE "L" COPPER WITH SOLDER JOINTS AND DRAINAGE PATTERN FITTINGS. BELOW GROUND WATER PIPING SHALL BE TYPE "K" COPPER WITH
BALL VALVES SHALL BE FULL PORT WITH STAINLESS STEEL BALL AND STEM WITH SOLDER OR THREADED FITTINGS AS APPLICABLE
PIPING AND EQUIPMENT SHALL BE TESTED IN ACCORDANCE WITH THE STATE PLUMBING CODE
SILVER SOLDER JOINTS, FLARED END JOINTS OR OTHER MASSACHUSETTS PLUMBING CODE APPROVED FITTINGS.
SPECIFICATIONS
27.
25.
24.
26.
18.
22.
23.
21.
20.
19.
16.
17.
15.
14.
11.
12.
13.
10.
8.
6.
7.
3.
5.
4.
2.
1.
THE PLUMBING CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE INSTALLATION OF ALL KITCHEN SINKS, FAUCETS AND ALL EQUIPMENT REQUIRING PLUMBING CONNECTIONS28.
ALL WATER PIPING SHALL BE TESTED FOR COLIFORM BY A LICENSED TESTING LAB. A CERTIFIED REPORT FROM THE LAB SHALL BE SUBMITTED TO THE STATE PLUMBING INSPECTOR FOR REVIEW AND APPROVAL.29.
THE PLUMBING CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE INSTALLATION OF ALL KITCHEN SINKS, FAUCETS29.
AND ALL EQUIPMENT REQUIRING PLUMBING CONNECTIONS
THIS SHALL BE DONE AND APPROVAL SHALL BE OBTAINED FROM THE INSPECTOR PRIOR TO FINAL ACCEPTANCE OF THE PLUMBING WORK
THE PLUMBING CONTRACTOR SHALL SUBMIT MANUFACTURERS SHOP DRAWINGS FOR ALL PROPOSED PLUMBING FIXTURES, MATERIALS, VALVES AND EQUIPMENT SHALL BE SUBMITTED TO THE PLUMBING ENGINEER FOR APPROVAL.30.
WRITTEN APPROVAL OF ALL PROPOSED PLUMBING FIXTURES, MATERIALS, VALVES AND EQUIPMENT SHALL BE RECEIVED FROM THE PLUMBING ENGINEER PRIOR TO THE COMMENCEMENT OF ANY PLUMBING WORK.
9. THE PLUMBING CONTRACTOR SHALL OBTAIN PERMITS FOR ALL HOT WORK PRIOR TO ANY HOT WORK AT THE SITE.
GREASE WASTEGW
CW COLD WATER
ALL SANITARY PIPING INSTALLED BELOW THE FLOOR THAT IS ASSOCIATED WITH THE DRAINS FROM ALL ICE MAKERS, ICE MACHINES, ICE BINS AND SODA DISPENSERS SHALL BE PROVIDED WITH INSULATION THAT SHALL31.
INCLUDE THE P-TRAP, FLOOR DRAIN BODY AND TAILPIECE AND 10 LINEAR FEET OF DRAIN PIPE INCLUDING ALL FITTINGS. INSULATION SHALL BE 1" THICK FIBERGLASS WITH MANUFACTURERS APPLIED VAPOR BARRIER JACKET.
ALL PIPE PENETRATIONS THROUGH THE FLOOR SLAB SHALL BE MADE WITH METAL PIPE SLEEVES THAT SHALL EXTEND A MINIMUM OF 2" ABOVE THE FINISH FLOOR. THE SPACE BETWEEN THE PENETRATION AND THE32.
SLEEVE SHALL BE PROVIDED WITH UL-APPROVED FIRE STOPPING. FOR MEMBRANE FLOORS, FLASHING SHALL BE PROVIDED AND SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOOR LEVEL. COORDINATE WITH ARCHITECT FOR FLOOR TYPES
ALL FLOOR DRAINS, FLOOR SINKS AND PIPE SLEEVES SHALL BE GROUTED SOLID.
THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE PLUMBING INSPECTOR FOR ALL PLUMBING INSPECTIONS
1/4" FOR PIPING UP TO 3". ALL VERTICAL SANITARY LINES & DRAIN LINES ASSOCIATED WITH ICE MAKERS, SODA DISPENSERS ETC ALL SANITARY WASTE PIPING SHALL PITCH A MIN. OF 1/8" PER FT. FOR PIPING 4" & LARGER, TO BE INSULATED, INSULATION AS SPECIFIED.
FCO
PLUMBING GENERAL LEGEND
CAPPED PIPE
UNION
FCO NEW FLUSH FLOOR CLEANOUT
NEW FLOOR DRAIN OR FLOOR SINK AS NOTEDFD or FS
NEW CONNECTION TO EXISTING PIPING
CW COLD WATER ABOVE FLOOR
CO END CLEANOUT ABOVE FLOOR
NEW SANITARY PIPING ABOVE THE FLOOR
NEW INDIRECT WASTE PIPING ABOVE FLOORIWIW
G
PIPE BREAK
GAS SHUT-OFF VALVE
NATURAL GAS PIPING ABOVE FLOORG
WATER SERVICE BALL VALVE
BUTTERFLY VALVE WITH MEMORY STOP
CHECK VALVE
SHOCK ABSORBER / WATER HAMMER ARRESTOR
SHUT-OFF VALVE & FLEXIBLE GAS CONNECTION
NEW VENT ABOVE FLOORV
HB HOSE BIBBHB
CO SENSOR
GAS DETECTION SYSTEM
140°F HOT WATER ABOVE FLOOR
140°F HOT WATER RETURN ABOVE FLOOR
HW
HWR
ELBOW DOWN OR DROP
PIPING UP THROUGH FLOOR ABOVE
PIPING DOWN THROUGH FLOOR
TP TRAP PRIMER PIPING ABOVE FLOORTP
DRAIN VALVE
SOLENOID VALVE
CO PANEL
REDUCED PRESSURE ZONE ASSEMBLY (WATTS 009)
DOUBLE CHECK VALVE (WATTS 007)
RPZ
DCV
TEE DROP OR RISE
NEW SANITARY PIPING BELOW SLABS
S
NEW VENT BELOW FLOORV
TP TRAP PRIMER PIPING BELOW SLABTP
GREASE WASTE & TRAPGW&T
CTE
ALL BUILDING SHUT-DOWNS ARE TO BE COORDINATED WITH THE OWNER/LANDLORD.33.
ETR EXISTING TO REMAIN
CONNECT TO EXISTINGCTE
WATER HAMMER ARRESTORS / SHOCK ABSORBERS TO PROVIDED AT ALL EQUIPMENT WITH QUICK ACTING VALVES AND AT THE TOILET ROOMS WITH FLUSH VALVES.34.
ETBR EXISTING TO BE REMOVED
PLUMBING FIXTURE NOTES:
1. PLUMBING FIXTURES ARE TO BE FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR OFF OF SPECIFICATIONS AND SCHEDULES ON THE ARCHITECTURAL SET OF DRAWINGS. PLUMBING CONTRACTOR IS TO COORDINATE WITH MANUFACTURER ON FIXTURE CODE COMPLIANCE AND MA APPROVAL. COORDINATE ALL FIXTURE INSTALLATION DIMENSIONS WITH THE DETAILS ON THE ARCHITECTURAL DRAWINGS AND PER MAAB
REQUIREMENTS.
2. ALL PLUMBING FIXTURES, FAUCETS, AND FLUSH VALVES SHALL BE FIELD ADJUSTED TO ENSURE PROPER CODE COMPLIANT OPERATION FOR
TEMPERATURE AND FLOW.
3. ALL HANDWASHING FIXTURES SHALL BE FIELD ADJUSTED TO LIMIT THE HOT WATER TEMPERATURE TO 110°F AS REQUIRED.
4. PROVIDE SERVICE STOPS FOR ALL NEW FIXTURES. ALL EXPOSED WATER & WASTE PIPING ASSOCIATED WITH FIXTURES SHALL BE CHROME FINISH.
PROVIDE ALL SUPPLIES, SERVICE STOPS, TAILPIECES, AND TRAPS FOR FIXTURES AS REQUIRED. PROVIDE ALL FINAL CONNECTIONS.
5. PROVIDE CONCEALED WALL CARRIERS FOR ALL WALL MOUNTED FIXTURES. CARRIERS SHALL BE BY ZURN OR APPROVED EQUAL.
6. PROVIDE PRE-MOLDED INSULATION KITS ON ALL WASTE & WATER PIPING, VALVES & FITTINGS DIRECTLY BELOW ACCESSIBLE FIXTURES. INSULATION KIT
TO BE BY TRUBRO.
ECO ECO NEW END CLEANOUT BELOW FLOOR
FURNISHED & INSTALLEDF&I
1. THE UNDERGROUND PIPING SHOWN SHALL BE USED FOR GENERAL REFERENCE ONLY AND
SHALL NOT BE USED BY THE PLUMBING CONTRACTOR TO INSTALL THE WORK.
2. PRIOR TO THE COMMENCEMENT OF ANY WORK AT THE SITE, THE PLUMBING CONTRACTOR
SHALL FIELD SURVEY ALL EXISTING CONDITIONS BELOW THE FLOOR AND SHALL DETERMINE
THE EXACT ROUTE OF PIPING AND THE LOCATIONS OF ALL DRAINS IN CONJUNCTION WITH
THE EXISTING BELOW FLOOR CONDITIONS AND OBSTRUCTIONS.
3. ALL PENETRATIONS THROUGH THE FLOOR AND ALL PIPING THAT WILL BE LOCATED
BELOW THE FLOOR SHALL BE CAREFULLY COORDINATED WITH THE OWNER
FOR APPROVAL PRIOR TO THE COMMENCEMENT OF ANY WORK AT THE SITE.
4. THE PLUMBING CONTRACTOR SHALL MAKE ADJUSTMENTS TO THE LOCATIONS AND ROUTING
OF DRAINS AND PIPING IN COORDINATION WITH THE EXISTING CONDITIONS AT THE SITE
BOTH ABOVE THE CEILINGS AND BELOW THE FLOOR AND SHALL DO SO AT NO
EXTRA COST TO THE CONTRACT.
UNDERFLOOR PIPING NOTES
5. ALL STRUCTURAL ELEMENT PENETRATIONS SHALL COORDINATED WITH STRUCTURAL ENGINEER PRIOR TO COMMENCEMENT OF WORK.
THE CONTRACTOR SHALL PROVIDE A SCALED SHOP DRAWING COMPLETE WITH ELEVATIONS, PIPE DIAMETERS AND/OR ANY RELEVANT INFORMATION NEEDED TO COORDINATE THE UNDERGROUND PIPING WITH STRUCTURE. THIS DRAWING
MUST BE APPROVED BY STRUCTURAL ENGINEER PRIOR TO COMMENCEMENT OF WORK
6. CONTRACTOR SHALL HAVE THE EXISTING PIPING SNAKE-CAMERA'D TO VERIFY CONDITION. IF BLOCKAGES EXIST IN THE PIPING, CONTRACTOR SHALL COORDINATE WITH LANDLORD/BUILDING OWNER TO GET THE PIPING HYDRO-JETTED
& ENSURE ALL BLOCKAGES HAVE BEEN REMOVED.
8. THE EXISTING SANITARY SYSTEM BELOW THE GROUND IS UNKNOWN. EXACT LAYOUT, SIZES & ELEVATIONS MUST BE DETERMINED BEFORE ANY WORK COMMENCES IN ORDER TO DETERMINE IF THE INVERT ELEVATIONS & SIZES
WILL BE ADEQUATE TO SUITE THE NEW INSTALLATION.
7. THE PLUMBING CONTRACTOR SHALL USE AN EXPERIENCED COMPANY TO X-RAY THE FLOOR SLAB
FOR ALL AREAS OF PROPOSED FLOOR PENETRATIONS. ALL LOCATION OF PROPOSED FLOOR
PENETRATIONS SHALL BE X-RAYED & SNAKE CAMERA'D AND VERIFIED TO BE FREE OF ANY OBSTRUCTION
PRIOR TO THE CORING OR CUTTING OF ANY FLOOR SLABS
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V
C
H I
T E
C T
S
O ur
9t h
2-in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
P.001
PL
U
M
BI
N G
Le ge nd , N ot es
S pe ci fic at io ns
AutoCAD SHX Text A
G
NOTES:
1. WATER SHALL BE PRODUCED AT MANUFACTURERS FACTORY SETTING
2. PROVIDE STARTUP BY FACTORY CERTIFIED TECHNICIAN AND STANDARD MANUFACTURERS WARRANTY.
3. WATER HEATER SHALL COME COMPLETE WITH TEMPERATURE AND PRESSURE RELIEF VALVE AND TANK DRAIN VALVE.
4. PROVIDE VACUUM BREAKER RELIEF VALVE(S) AS REQUIRED BY THE STATE PLUMBING CODE. INSTALL IN MULTIPLES IS REQUIRED.
5. ALL DOMESTIC WATER HEATING COMPONENTS SHALL COME ASME APPROVED.
HOT WATER HEATER SCHEDULE
TAG LOCATION MANUFACTURER MODEL TYPE RECOVERY LOAD
STORAGE
(GAL)
ELECTRICAL
COMMENTS
VOLT PH hZ
HWH BASEMENT JANITORS
CLOSET RHEEM POINT OF USE
EGSP20 ELECTRIC 15 GPH @ 80*F RISE 3.0 KW 20 208 1 60 120*F OUTPUT. WATER SHALL BE PRODUCED AT MANUFACTURERS
FACTORY SETTING
SUSPENDED ELECTRIC WATER HEATER DETAIL
NOT TO SCALE
HWH
1"
NOTES :
1. ELECTRIC WATER HEATER SHALL BE INSTALLED ON PLATFORM, ABOVE
JANITORS CLOSET. PROVIDE SUPPORT STRUCTURE AS REQUIRED.
2. PROVIDE 3 4" CD PLYWOOD UNDERNEATH SAFE WASTE PAN.
3. COORDINATE WATER DETECTION SYSTEM WITH ELECTRICAL CONTRACTOR.
4. IF HARD CEILING IS TO BE INSTALLED, COORDINATE ACCESS PANEL SIZE &
LOCATION IN FIELD WITH GENERAL CONTRACTOR & OWNER.
FLOOR
MOP BASIN
4"DRAIN TO MOP BASIN
3"S
SEE FLOOR PLAN
2"V
SEE FLOOR PLAN
AIR BREAK
2"DEEP GALVANIZED STEEL SAFE PAN
WITH 1"DRAIN TAP. PAN TO HAVE MIN
2"CLEARANCE ALL AROUND HWH
T&P RELIEF VALVE
CW SUPPLY
HW SUPPLY
T
AQUASTAT
HOT WATER RECIRCULATION
PUMP (HWCP)
CHECK VALVE (TYPICAL)
HWR FROM SYSTEM
EXPANSION TANK
AMTROL ST-5C
VACUUM RELIEF VALVE
WATER SENSOR
UNISTRUT STEEL FRAMING.
FABRICATE IN FIELD
BALL VALVE (TYP)
UNION (TYP)
WIRE TO WALL OUTLET
WIRE FROM WATER SENSOR
WIRE TO WATER HEATER
FLOODSAFE CONTROL UNIT
DRAIN
SECURE EACH TIE ROD SUPPORT TO BUILDING
STEEL. COORDINATE IN FIELD TEMPERATURE GAUGE
TYPICAL WASHING MACHINE BOX
NOT TO SCALE
BRACKET TO STUD
2" SANITARY OUTLET
3-1/2"
43" TO FL.
TOP OF MACHINE
TOP OF BOX
2" SANITARY TEE FITTING
2" P-TRAP
2"
SCREW MOUNTING
WOOD OR STEEL
FRAMING STUD
SANITARY RISER. SEE PLANS FOR SIZES
SANITARY TEE FITTING
2" VENT
SANITARY RISER. SEE PLANS FOR SIZES
1/2" HW & CW SUPPLIES
SHOCK ABSORBER INTEGRAL
WITH WASHING MACHINE BOX
WATER VALVE BOX
HW & CW HOSE CONNECTIONS
WITH INTEGRAL SHUT OFFS
1. THE WASHING MACHINE BOX WITH DRAIN AND WATER SUPPLY WITH MINI-ARRESTORS SHALL BE BY SIOUX CHIEF
PLUMBING FIXTURE SCHEDULE
TAG DESIGNATION
FIXTURE TRIM CONNECTIONS
REMARKS
MANUFACTURER MODEL MANUFACTURER MODEL COLD WATER HOT WATER SANITARY VENT
P-1 WATER CLOSET TOTO CT705ELNG TOTO ECOPOWER TET1LA32#CP
TOTO SEAT SC534 1" - 4" 2" COTTON, FLOOR MOUNTED, ADA COMPLIANT TOILET WITH CeFiONtect CERAMIC GLAZE. 1.28 GPF
ECOPOWER SENSOR ACTIVATED FLUSHOMETER
P-2 LAVATORY KOHLER K-12638-L-0 KOHLER K-103K37-SANA-CP 1
2" 1
2" 2" 2"
COTTON, VITREOUS CHINA SINK WITH K-13885 OFFSET DRAIN, OVERFLOW
CHROME, KINESIS SENSOR ACTIVATED FAUCET, AND BOBRICK (B-887) SOAP DISPENSER
P-3 KITCHEN SINK ELKAY ECTSRAD25226TBG ELKAY LK800GN08T6 1
2" 1
2" 2" 2" STAINLESS STEEL, 4 HOLE, SINGLE BOWL SINK WITH BOTTOM GRID (CTXBG2115), OFFSET TAILPIECE
(LKAD35), AND 8"ARC TUBE SPOUT FAUCET WITH WRIST BLADE HANDLES
P-4 WASHING MACHINE OUTLET
BOX WATTS A2C-WB-M1 - - 1
2" 1
2" 2" 2" MAX PRESSURE RATING OF 150PSI. MAX TEMP RATING OF 180°F WITH ABS BOX.
NOTES:
1. PLUMBING CONTRACTOR SHALL COORDINATE ALL FIXTURE INSTALLATION DIMENSIONS WITH THE ARCHITECTURAL DETAILS ON THE ARCHITECTURAL DRAWINGS.
2. ALL PLUMBING FIXTURE, FAUCETS, AND FLUSH VALVES SHALL BE FIELD ADJUSTED TO ENSURE PROPER CODE COMPLIANT OPERATION FOR TEMPERATURE AND FLOW.
3. ALL HANDWASHING FIXTURES SHALL BE FIELD ADJUSTED TO LIMIT THE HOT WATER TEMPERATURE TO 110°F.
4. PROVIDE SERVICE STOPS FOR ALL FIXTURES. ALL EXPOSED WATER & WASTE PIPING ASSOCIATED WITH FIXTURES SHALL BE CHROME FINISH. PROVIDE ALL SUPPLIES, SERVICE STOPS, TAILPIECES, AND TRAPS FOR FIXTURES AS REQUIRED. PROVIDE ALL FINAL CONNECTIONS.
5. PROVIDE CONCEALED WALL CARRIERS FOR ALL WALL MOUNTED FIXTURES. CARRIERS SHALL BE BY WADE OR APPROVED EQUAL.
6. PROVIDE PRE-MOLDED INSULATION KITS ON ALL WASTE & WATER PIPING, VALVES & FITTINGS DIRECTLY BELOW ACCESSIBLE FIXTURES. INSULATION KIT TO BE BY TRUBRO.
CEILING
COUNTERTOP
FINISH FLOOR
TYPICAL KITCHEN SINK & DISHWASHER DETAIL
NOT TO SCALE
DISHWASHER
BY OTHERS
SINK
CLIP DISHWASHER WASTE
AS HIGH AS POSSIBLE
BELOW COUNTER
WATER HAMMER
ARRESTOR
2"
2"
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V
C
H I
T E
C T
S
O ur
9t h
2-in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
P.002
PL
U
M
BI
N G
Le ge nd , N ot es
S pe ci fic at io ns
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAIN BOX
W.
Dryer
SCALE: 1/4"=1'-0"1 Second Floor New Work Plan
2"CW
2"HW
2"HW
2"CW
2"CW
2"HW
1"CW
HWH
1"CW, MAKE CONNECTION TO EXISTING CW,
EXACT LOCATION TDIF.
CONNECT DISHWASHER TO
KITCHEN SINK HW
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V
C
H I
T E
C T
S
O ur
9t h
2-in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
P.101
PL
U
M
BI
N G
Se co nd F lo or
D om es tic
N ew
W or k Pl an
SCALE: 1/4"=1'-0"1 Second Floor New Work Plan
2"W&V
2"W&V
2"W&V
4"S 2"V
FCO
3"S, MAKE CONNECTION TO EXISTING SAN,
EXACT LOCATION TDIF.
2"V, MAKE CONNECTION TO EXISTING VENT,
EXACT LOCATION TDIF.
CONNECT DISHWASHER TO
KITCHEN SINK TAILPIECE
HWH
2"W&V
2"OPEN END DRAIN
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V
C
H I
T E
C T
S
O ur
9t h
2-in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
P.102
PL
U
M
BI
N G
Se co nd F lo or
S an ita ry
V en t
N ew
W or k
OF ALL FIRE RATED WALLS AND FLOORS AND TO DETERMINE THE LOCATIONS OF ALL FIRE RATED SLEEVES, SEALS AND CORE DRILLING
19.
IT SHALL BE THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR TO COORDINATE WITH THE OWNER FOR LOCATIONS THE DRAWINGS ARE NOT INTENDED TO SHOW ALL LOCATIONS WHERE FIRE RATED SLEEVES, SEALS OR CORE DRILLING WILL BE REQUIRED.
WITH NFPA-13 AND SHALL SUBMIT THESE REPORTS TO THE LOCAL FIRE DEPARTMENT PRIOR TO FINAL ACCEPTANCE OF THE SPRINKLER SYSTEMS.
THE CONTRACTOR SHALL TEST AND FLUSH ALL SPRINKLER SYSTEMS IN ACCORDANCE WITH NFPA-13 AND SHALL PROVIDE FLUSHING AND TESTING REPORTS IN ACCORDANCE18.
ANY DEFICIENCIES FOUND DURING TESTING AND SHALL RETEST ALL SPRINKLER SYSTEMS UNTIL THE ENTIRE SYSTEM IS ACCEPTED BY THE LOCAL FIRE DEPARTMENT.
THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL FIRE DEPARTMENT FOR TESTING AND ACCEPTANCE OF ALL SPRINKLER WORK. THE CONTRACTOR SHALL FIX17.
16. ALL MATERIALS AND EQUIPMENT USED FOR FIRE PROTECTION SYSTEMS SHALL BE UL LISTED OR FM APPROVED FOR FIRE PROTECTION SERVICE AND SHALL BE RATED AT 175 PSI WORKING PRESSURE. CONTRACTOR TO DETERMINE IF EXISTING SYSTEM CONTAINS HIGH PRESSURE FITTINGS.
2.
1.
3.
5.
4.
GENERAL NOTES
AND FIRE RATED SEPARATIONS.
6.
8.
7.
10.
CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN ALL SCAFFOLDING, HOISTING
CONTRACTOR SHALL PROVIDE FIRESTOPPING FOR ALL PENETRATIONS THRU FIRE WALLS
ALL PIPING SHALL BE RUN EXPOSED WHERE NOT POSSIBLE TO CONCEAL AND CARE SHALL BE TAKEN TO RUN ALL PIPING
WELL AS ALL RULES AND REGULATIONS OF THE AUTHORITY HAVING JURISDICTION.
ALL SPRINKLER PIPING AND HEADS ARE SHOWN DIAGRAMMATICALY. CONTRACTOR SHALL COORDINATE WITH
LOCATIONS OF DUCTWORK, DIFFUSERS AND LIGHT FIXTURES. CONTRACTOR SHALL
AS TIGHT TO CEILINGS AND WALLS AS POSSIBLE. ALL PIPING SHALL FOLLOW THE BUILDING LINES AND SHALL RUN PARALLEL TO WALL IN A NEAT MANNER
EQUIPMENT AND DERRICKS NECESSARY FOR INSTALLATION OF WORK
ALL WORK PERFORMED SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE MASSACHUSETTS STATE
IN THE DESIGN, INSTALLATION AND TESTING OF SPRINKLER SYSTEMS.
NFPA-13 LATEST ACCEPTED EDITIONS.
ALL NEW FIRE PROTECTION SYSTEMS SHALL BE SEISMICALLY BRACED, IF REQUIRED, ACCORDING
THE DRAWINGS ARE NOT INTENDED TO SHOW EXACT SPRINKLER HEAD LOCATIONS, NUMBER OF SPRINKLER
BUILDING CODE AND NFPA-13 LATEST ACCEPTED EDITIONS AS
ALL FIRE PROTECTION SYSTEMS, EQUIPMENT AND PIPING SHALL BE DESIGNED, INSTALLED AND TESTED
BY A SPRINKLER CONTRACTOR LICENSED AND EXPERIENCED IN THE STATE OF MASSACHUSETTS
TO THE APPLICABLE SECTIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND
EXISTING CONDITIONS BEFORE WORK BEGINS TO ENSURE THAT NO INTERFERENCE'S
EXIST AND THAT ALL COMPONENTS OF THE SPRINKLER SYSTEM WILL FIT INTO THE SPACE.
COORDINATE WITH THE EXISTING BUILDING CONDITIONS FOR CEILINGS, CEILING SPACES AND ROOMS.
CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL AND ELECTRICAL EXISTING CONDITIONS FOR
11.
13.
14.
15.
12.
THE TERM "CONTRACTOR" SHALL MEAN "SPRINKLER CONTRACTOR"
ALL SPRINKLER HEADS SHALL BE LISTED QUICK RESPONSE TYPE UNLESS OTHERWISE NOTED
THE CONTRACTOR SHALL PROVIDE A FIRE DEPARTMENT PERSONNEL STAFFED "FIRE WATCH" DURING ALL WELDING OPERATIONS.
THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING BUILDING CONDITIONS FOR ALL CEILING TYPES
SPRINKLER CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING IN ORDER TO ACCOMMODATE THE SPRINKLER WORK.
THE EXISTING CONDITIONS IN THE BUILDINGS AND AT NO EXTRA COST TO THE CONTRACT
THE CONTRACTOR SHALL MAKE REASONABLE CHANGES TO THE SPRINKLER HEAD LOCATIONS AND SPRINKLER PIPE ROUTES AS A RESULT OF HIS COORDINATION WITH
HEADS, OR THE EXACT ROUTING OF PIPING. THIS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
SET OF WORKING FIRE PROTECTION DRAWINGS IN ACCORDANCE WITH NFPA-13 LATEST ACCEPTED EDITION. THE
THE SPRINKLER CONTRACTOR SHALL PRODUCE A COMPLETE
AND CALCULATIONS SHALL BE STAMPED AND SIGNED BY THE CONTRACTORS REGISTERED FIRE PROTECTION SYSTEM SHALL BE HYDRAULICALLY CALCULATED PER THE DESIGN CRITERIA REQUIRED BY CODE. ALL DRAWINGS
ENGINEER AND SHALL BE SUBMITTED TO THE LOCAL FIRE DEPARTMENT FOR APPROVAL AFTER ENGINEER REVIEW.
THIS SHALL BE DONE PRIOR TO THE COMMENCEMENT OF ANY SPRINKLER WORK.
9.
AN ADDITIONAL SET OF STAMPED FIRE PROTECTION DRAWINGS AND CALCULATIONS AS DESCRIBED ABOVE
SHALL BE SUBMITTED TO THE OWNERS FOR APPROVAL. THIS SHALL BE
DONE PRIOR TO THE COMMENCEMENT OF ANY SPRINKLER WORK.
WRITTEN APPROVAL OF THE SPRINKLER CONTRACTORS SHOP DRAWINGS AND HYDRAULIC
CALCULATIONS SHALL BE OBTAINED FROM THE ENGINEER, LOCAL FIRE DEPARTMENT AND THE OWNER
PRIOR TO THE COMMENCEMENT OF ANY WORK
SHOP DRAWINGS, THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TO VERIFY THE EXISTING CEILING CONDITIONS THAT ARE TO REMAIN
21. THE DRAWINGS ARE NOT INTENDED TO SHOW THE EXISTING CEILING CONDITIONS, EXISTING LIGHT FIXTURES, EXISTING HVAC DIFFUSERS, MOLDING, SOFFITS OR ANY OTHER EXISTING FIXTURES OR EQUIPMENT IN THE EXISTING CEILINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING A SURVEY OF ALL EXISTING LIGHT FIXTURES, HVAC DIFFUSERS, MOLDING, SOFFITS AND ALL OTHER EXISTING FIXTURES OR EQUIPMENT IN THE EXISTING CEILINGS AND SHALL INDICATE THESE CONDITIONS ON THE SPRINKLER SYSTEM SHOP DRAWINGS. THE CONTRACTOR SHALL USE THIS SURVEY INFORMATION TO LOCATE SPRINKLER HEADS IN THE EXISTING BUILDING AND TO CREATE THE SPRINKLER SYSTEM SHOP DRAWINGS. PRIOR TO THE CREATION OF THE SPRINKLER SYSTEM
20.
DESIGN DENSITIES AS WELL AS THE NUMBER OF SPRINKLER HEADS IN ALL AREAS OF OPERATION THAT WILL BE USED TO CREATE THE SPRINKLER CONTRACTORS REMOTE DESIGN AREAS SHOWN ON THE DRAWINGS ARE NOT INDICATED. IT SHALL BE THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR TO SELECT ALL DESIGN AREAS AND
SHOP DRAWINGS AND HYDRAULIC CALCULATIONS. ALL DESIGN AREAS, DESIGN DENSITIES AND THE NUMBER OF OPERATING SPRINKLER HEADS SHALL BE SELECTED BY THE SPRINKLER CONTRACTOR IN ACCORDANCE WITH NFPA-13. HYDRAULIC CALCULATIONS SHALL BE PERFORMED FOR EVERY BUILDING REQUIRING SPRINKLER COVERAGE.
22.
AND SHALL WALK THRU THE BUILDING WITH THE OWNER TO DETERMINE THE EXACT ROUTING OF ALL SPRINKLER PIPING. THE SPRINKLER CONTRACTOR SHALL SURVEY ALL ROOMS AND SPACES PRIOR TO THE CREATION OF THE SPRINKLER CONTRACTORS SHOP DRAWINGS, THE SPRINKLER CONTRACTOR WILL COORDINATE A SITE MEETING AT THE BUILDING REQUIRING NEW FIRE PROTECTION SYSTEMS
IN EACH BUILDING INCLUDING CONCEALED SPACES IN ORDER TO DETERMINE THE EXACT ROUTE OF ALL SPRINKLER PIPING AND THE LOCATIONS OF ALL SPRINKLER HEADS.
23.
SHOP DRAWINGS, THE SPRINKLER CONTRACTOR SHALL SURVEY THE BUILDING AND SHALL VERIFY THE EXACT ARCHITECTURAL CONDITIONS. THE SPRINKLER CONTRACTOR SHALL ALTER THE FLOOR PLANS AS REQUIRED THE DRAWINGS ARE NOT INTENDED TO SHOW EXACT BUILDING CONDITIONS. THE SPRINKLER CONTRACTOR SHALL USE THE FLOOR PLANS AS GENERAL REFERENCE ONLY. AS PART OF THE CREATION OF THE SPRINKLER CONTRACTORS
TO ACCURATELY DEPICT THE ACTUAL EXISTING ARCHITECTURAL CONDITIONS IN THE BUILDING. THIS SHALL BE DONE PRIOR TO THE COMMENCEMENT OF ANY SPRINKLER DESIGN WORK.
27.
THE EXISTING SPRINKLER SYSTEM ISOLATION VALVES. THE EXISTING BUILDING SPRINKLER SYSTEMS SHALL REMAIN ACTIVE DURING THE WORK AS MUCH AS POSSIBLE.
THE CONTRACTOR SHALL ISOLATE THE EXISTING SPRINKLER SYSTEM IN THE SMALLEST AREA POSSIBLE AROUND THE AREA OF WORK. THIS SHALL BE DONE BY CLOSING EXISTING ISOLATION AND ZONE VALVES. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND IN THE FIELD FOR THE LOCATIONS OF
24.
26.
25.
WITH ALL ASPECT OF THE PROJECT SHALL NOT BE GROUNDS FOR EXTRA COSTS TO THE CONTRACT.
FIRE PROTECTION DRAWINGS, AND ALL CONDITIONS THAT THE SPRINKLER WORK SHALL BE INSTALLED. ANY APPARENT DISCREPANCIES IN THE DRAWINGS AND EXISTING OR PROPOSED CONDITIONS SHALL BE SUBMITTED TO THE ARCHITECT IN WRITING. FAILURE OF THE CONTRACTOR TO FAMILIARIZE HIMSELF
PRIOR TO BID, THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS AND THE ARCHITECTURAL AND
THE CONTRACTOR SHALL PAY ALL FEES, OBTAIN ALL PERMITS AND APPROVALS, AND SHALL FURNISH ALL LABOR AND MATERIALS NEEDED
FOR THE COMPLETE INSTALLATION OF ALL FIRE PROTECTION SYSTEMS SHOWN ON THE PLANS
WITH THE LOCAL WATER AUTHORITY AND OWNER THAT IS REQUIRED FOR THE CONDUCTING OF THE NEW FLOW TEST THE SPRINKLER CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SHALL PAY ALL FEES AND PERFORM ALL COORDINATION
28. THE HYDRANT/PUMP FLOW DATA INDICATED ON THE DRAWINGS SHALL NOT BE USED BY THE SPRINKLER CONTRACTOR TO PERFORM HIS
CALCULATIONS FOR THE HIS SPRINKLER SYSTEM SHOP DRAWINGS. HYDRAULIC CALCULATIONS SHALL BE STAMPED AND SIGNED BY THE CONTRACTORS
HYDRAULIC CALCULATIONS FOR HIS SPRINKLER SYSTEM SHOP DRAWINGS. THE SPRINKLER CONTRACTOR SHALL CONDUCT A NEW FIRE HYDRANT FLOW TEST IN ORDER TO OBTAIN CURRENT FLOW AND PRESSURE DATA. THE CONTRACTOR SHALL USE THIS NEWLY OBTAINED DATA TO PERFORM HIS HYDRAULIC
OWNERS INSURANCE AUTHORITY FOR FINAL APPROVAL. THIS SHALL BE DONE PRIOR TO THE COMMENCEMENT OF ANY SPRINKLER WORK.
REGISTERED FIRE PROTECTION ENGINEER AND SHALL BE SUBMITTED WITH THE SPRINKLER SYSTEM SHOP DRAWINGS TO THE LOCAL FIRE DEPARTMENT AND
SPRINKLER HEADS IN FINISHED CEILING AREAS SHALL BE VIKING CONCEALED PENDENT HEAD, QUICK RESPONSE, ORDINARY TEMPERATURE, CHROME FINISH
EQUIPMENT, COORDINATION AND NOTIFICATION OF ALL APPLICABLE AUTHORITIES FOR THE SPRINKLER PIPING TEST.
ALL WATERTIGHT SLEEVES, AND FIRE RATED SLEEVES SHALL BE BY LINKSEAL. ALL SLEEVES SHALL BE GALVANIZED STEEL
ALL NEW SPRINKLER HEADS, PIPING AND FITTINGS SHALL BE UL LISTED AND FM APPROVED, AND SHALL
ALL ABOVE GROUND PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH ROLL GROOVE ENDS AND VICTAULIC FITTINGS OR THREADED
ENDS WITH SCREW FITTINGS AS APPLICABLE. SCHEDULE 10 PIPING WILL NOT BE ALLOWED.
INSTALLATION OF SPRINKLER SYSTEMS. ALL CEILINGS AND WALLS SHALL BE PATCHED TO THE ARCHITECTS SATISFACTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING ALL CEILINGS AND WALLS AS REQUIRED FOR
ALL SPRINKLER WORK SHALL BE TESTED IN ACCORDANCE WITH NFPA 13. THE TEST SHALL BE WITNESSED BY THE LOCAL FIRE DEPARTMENT, THE OWNERS REPRESENTATIVE, AND THE OWNERS INSURING AUTHORITY. THE CONTRACTOR SHALL PROVIDE THE
BAND TYPE HANGERS SHALL BE USED FOR PIPE SIZES 3" AND SMALLER. CLEVIS TYPE HANGERS SHALL BE USED FOR PIPE ALL HANGERS SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE. ALL HANGERS AND RODS SHALL BE HOT DIPPED GALVANIZED.
ALL SPRINKLER SYSTEMS SHALL BE DESIGNED, INSTALLED IN ACCORDANCE WITH NFPA 13
ALL FIRE PROTECTION SYSTEMS AND EQUIPMENT SHALL BE BY VIKING, GRINNEL OR VICTAULIC
FOR OUTDOOR OR UNDERGROUND APPLICATIONS, AND BLACK STEEL FOR INDOOR APPLICATIONS.
SIZES 4" AND LARGER. RODS SIZES SHALL CONFORM TO NFPA 13 REQUIREMENTS.
WITH CONCEALOR COVER PLATE PROVIDED WITH FACTORY APPLIED FINISH TO MATCH THE CEILING FINISHES. ALL EXPOSED HEADS SHALL BE CHROME FINISH.
SPECIFICATIONS
BE RATED AT 175 PSI WORKING PRESSURE
5.
7.
9.
8.
6.
4.
3.
2.
1.
PROVIDE HIGH PRESSURE FITTINGS IF THERE IS NO PRESSURE REDUCING VALVE ON THIS PIPING SYSTEM.
SPRINKLER HEADS IN STORAGE, MEZZANINE AND MECHANICAL AREAS ARE TO BE PROVIDED WITH WIRE CAGES.10.
THE CONTRACTOR SHALL COORDINATE WITH THE PROPERTY OWNER AND THE LOCAL FIRE DEPARTMENT FOR THE SHUTTING DOWN AND DRAINING OF THE EXISTING SPRINKLER SYSTEM IN ORDER TO PERFORM THE WORK. FIRE DEPARTMENT MUST BE NOTIFIED EACH TIME THE SYSTEM IS IMPAIRED, EXACTLY WHAT IS BEING TAKEN OUT OF SERVICE AND THE DURATION. AREAS AND DEVICES ARE TO BE OUT OF SERVICE FOR THE LEAST AMOUNT OF TIME POSSIBLE. SPRINKLER SYSTEM IS NOT TO BE LEFT OUT OF SERVICE OVERNIGHT. CONTRACTOR SHALL INCUR ALL FEES ASSOCIATED WITH
SHUT-DOWN AND INSPECTIONS - NO EXCEPTIONS.
CONCEALED PENDENT SPRINKLER HEAD
NOT TO SCALE
1.
OF THE CEILINGS TO WHICH THE SPRINKLER HEAD WILL BE INSTALLED. THE SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL DRAWINGS FOR ALL CEILING FINISHES AND COLORS AND SHALL ORDER THE SPRINKLER HEAD COVERS TO MATCH
ALL CONCEALED SPRINKLER HEAD COVERS SHALL COME WITH FACTORY APPLIED FINISHES TO MATCH THE FINISH AND COLOR
NOTES:
PRIOR TO ORDERING ANY CONCEALED SPRINKLER HEADS, THE SPRINKLER CONTRACTOR SHALL SUBMIT ALL SPRINKLER HEAD FINISHES
BE ORDERED UNTIL THE ARCHITECT HAS APPROVED ALL SPRINKLER HEAD FINISHES, COLORS AND LOCATIONS AND COLORS AS WELL AS THE LOCATIONS OF THESE SPRINKLER HEADS TO THE ARCHITECT FOR APPROVAL. NO SPRINKLER HEADS SHALL
2.
1" SPRINKLER HEAD SUPPLY. SUPPORT FROM
BUILDING STRUCTURE IF LENGTH EXCEEDS 24"
1"RISER NIPPLE
1"CONNECTION TO BRANCH/MAIN WITH 1"TEE OUTLET
BRANCH/MAIN LINE
1"DROP NIPPLE
SUSPENDED/FINISHED CEILING
RECESSED PENDENT SPRINKLER HEAD
WET PIPE SYSTEM SPRINKLER PIPING
FIRE PROTECTION LEGEND
ELBOW DOWN OR DROP
PIPE UP THROUGH FLOOR ABOVE
SPRINKLER HEAD - CONCEALED PENDENT- ORDINARY TEMPERATURE - QUICK RESPONSE TYPE
PIPE DOWN THROUGH FLOOR BELOW
SPR
SPRINKLER HEAD - PENDENT - HIGH TEMPERATURE - QUICK RESPONSE TYPE
EXISITNG WET PIPE SYSTEM SPRINKLER PIPINGSPR
NEW CONNECTION TO EXISTING PIPINGCTE
VERIFY IN FIELDVIF
HT
SPRINKLER HEAD - PENDENT - ORDINARY TEMPERATURE - QUICK RESPONSE TYPE
SPRINKLER HEAD - UPRIGHT - ORDINARY TEMPERATURE - QUICK RESPONSE TYPE
SPRINKLER HEAD - DRY PENDENT - HIGH TEMPERATURE - QUICK RESPONSE TYPE
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
see graphic scale
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V
C
H I
T E
C T
S
O ur
9t h
2-in g ou r c lie nt ele
Bid & Submission Set: 7th March 2022
FP.001
FI
RE
P
RO
TE
CT
IO
N
Le ge nd , D et ai ls, S pe ci fic at io ns
D-02entry
Dryer
FA
PS
FEC
FA
FA
FA
SCALE: 1/4"=1'-0"1 Second Floor New Work Plan
NOTE:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING ALL
CEILINGS AND WALLS AS REQUIRED FOR INSTALLATION OF SPRINKLER SYSTEMS.
ALL CEILINGS AND WALLS SHALL BE PATCHED TO THE ARCHITECTS SATISFACTION.
S t a m p :
S h e e t :
Date:
7th…