Event_4386_Specifications.pdf

PDF 349 KB Posted

Attached to
BID - MCC - 3rd Avenue Ventilation Project
Solicitation number
0000004386
Issued by
Hennepin County, Minnesota

About this file

This is a specifications document for a bid issued by the City of Minneapolis for ventilation fan replacement and CO/NO2 monitoring system installation at the Minneapolis Convention Center (MCC) 3rd Avenue Parking Ramp. The project requires contractors to provide all labor, materials, equipment, and services to remove existing fans and install new ventilation equipment meeting specified performance criteria. Four new fans are required: two 24,000 CFM units (EF-1 and SF-1) and two 26,250 CFM units (EF-2 and SF-2), all direct-drive, 480V/3-phase configurations with manual override switches. The scope includes installation of a carbon monoxide and nitrogen dioxide monitoring system by approved manufacturers (ACME, Macurco, Toxalert, Honeywell, or CET), protective sensor cages, control integration, and bi-annual calibration during the first year of operation. An alternate bid line item addresses Variable Frequency Drives (VFDs) for all four fans with integrated speed modulation controls based on gas concentration thresholds. All installation must comply with Minnesota State Mechanical and Electrical Codes, local Minneapolis ordinances, manufacturer instructions, NEC standards, and applicable fire/life-safety codes. Bidders must submit unit pricing on a provided Excel spreadsheet with auto-calculated base bid totals; handwritten prices are not accepted.

Pricing shall be unit-based and encompass all costs including labor, equipment, materials, fuel, travel time, and debris disposal with no additional fees for mobilization or setup. The City reserves the right to reject any or all bids, waive informalities, and award to the lowest responsive and responsible contractor; this is a non-exclusive contract permitting the City to hire other contractors for similar work. Payment will be rendered within 30 days of invoice submission and final inspection upon delivery to the address specified (City of Minneapolis, 505 Fourth Ave S, Room 310, Minneapolis, MN 55415; submitinvoices@minneapolismn.gov). All work must be placed on a City-issued Purchase Order, and invoices should be submitted electronically in PDF format when feasible. The Contractor shall provide a minimum two-year warranty covering all labor, materials, equipment, and workmanship, with manufacturer warranties of no less than two years on all components. Warranty service response is required within 48 hours for standard claims and 24 hours for life-safety issues. Site-specific requirements mandate contractor coordination with MCC Facilities Management, Guest Services, and 24/7 Security Operations; an onsite Foreman or Project Manager with full authority must be designated. A formal project kickoff meeting is required to coordinate equipment deliveries, work scheduling, materials staging, and parking level restrictions while maintaining operational facility conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Minneapolis Convention Center (MCC)

Bid – 3rd Avenue Parking Ramp Ventilation Fan Replacement & CO/NO₂ Monitoring System City of Minneapolis Convention Center Parking Facilities

Event:

Bid Form All bidders shall respond with a unit price. Each unit price shall encompass all costs including but not limited to: travel time, fuel, service truck charges, and tool. No additional fee will be paid for travel/set-up time.

A valid bid response shall include the following items. This information will become the basis for the evaluation of the bid.

• Price shall consist of all labor, equipment, materiel, fuel, and miscellaneous costs to transport debris to disposal facility.

• The Bid Form must be filled out in Excel and attached to the bid response. No handwritten prices will be accepted. The spreadsheet will auto-calculate the Base Bid.

• In the event of a mathematical error, the unit price shall govern.

Non-Exclusive Any contract(s) resulting from this Request for Bid will not be an exclusive contract and the City reserves the right to hire other contractors, to perform similar work, and seek bids from other vendors.

Rights of the City The City reserves the right to reject all or any part of any bid, waive informalities, and award the contract to the lowest responsive and responsible contractors to best serve the interest of the City. Informality shall mean a minor defect or variation of a bid from the exact requirements of the Request for Bid which does not affect the price, quality, quantity, or delivery schedule for the goods, services or construction being procured.

Quantities The quantities specified in this Contract are estimated only. They may not indicate the actual quantity which will be ordered, since such volume will depend upon requirements which develop during the Contract period.

Quantities shown shall not be construed to represent any amount which the City shall be obligated to purchase under the Contract or relieve the Contractor of its obligation to fill all orders placed by the City.

INVOICE AND PAYMENT:

All work requested under this Contract shall be placed on a City issued Purchase Order.

Contractor shall make all reasonable efforts to submit invoices and documentation in an electronic format, such as PDF or other format compatible with City software capabilities, in lieu of paper invoices and documentation, when so requested by City.

Upon delivery and acceptance of the service, the Contractor shall submit an invoice detailing the appropriate charges.

Invoices shall be submitted to:

City of Minneapolis 505 Fourth Ave S, Room 310 Minneapolis, MN 55415 Email: submitinvoices@minneapolismn.gov

Upon receipt of invoice and final inspection and acceptance of the service, the City will render payment within thirty (30) days unless any items thereon are questioned, in which event payment will be withheld pending verification of the amount claimed and the validity of the claim. The Contractor shall provide complete cooperation during any such investigation.

The City will not pre-pay for service. All bills shall state the location and dates of service being billed. All fees, taxes, charges, surcharges, and revenue payments are to be itemized.

No payment will be made for material stored off-site except in situations where payments may be considered by the City for materials which are stored in a secured area, to be verified by the City and where the Contractor maintains adequate insurance coverage protecting specific materials from loss.

Proof of insurance shall be supplied prior to payment for any materials stored off-site.

1. General Requirements

Scope of Work

Provide all labor, materials, equipment, tools, commissioning, testing, and services necessary to remove existing and install new ventilation fans, control wiring, and a complete CO/NO₂ monitoring system as shown on the drawings and described herein. Variable Frequency Drives (VFDs) are not included in the Base Bid and shall be priced separately under Alternate No. 1.

Applicable Codes and Standards

All installation shall comply with, at minimum:

Minnesota State Mechanical and Electrical Codes Local City of Minneapolis requirements and ordinances

Manufacture installation instructions NEC for all electrical connections Any relevant fire/life-safety codes

Coordination Requirements

Contractor shall thoroughly review drawing prior to installation. Drawing is diagrammatic and indicates approximate locations only.

Coordinate with structural, electrical, architectural, and other trades to ensure no interference with systems or required access clearances.

Contractor shall provide necessary offsets, transitions, and routing adjustments to accommodate field conditions.

2. Products

Ventilation Fans

Provide and install new fans as shown in the Fan Schedule on the drawing:

EF-1: 24,000 CFM, 0.25 in. WC, Direct Drive, 3.0 HP, 480V/3PH SF-1: 24,000 CFM, 0.25 in. WC, Direct Drive, 3.0 HP, 480V/3PH EF-2: 26,250 CFM, 0.25 in. WC, Direct Drive, 5.0 HP, 480V/3PH SF-2: 26,250 CFM, 0.25 in. WC, Direct Drive, 5.0 HP, 480V/3PH

Fans shall include:

A. Manufacturer housings and screens B. Backdraft dampers (where noted) C. VFD compatibility D. Manual override switch (HOA) at each fan

Alternate No. 1 - Variable Frequency Drives (VFDs)

Scope of Alternate

Provide pricing for furnishing and installing Variable Frequency Drives (VFDs) for the parking ramp ventilation system as indicated on the drawings. The Alternate shall include all labor, materials, programming, wiring modifications, startup, testing, and commissioning required for a complete operation installation.

The Base Bid shall assume the ventilation fans operate without VFDs unless Alternate is accepted by the Owner.

The Alternate shall include:

Four (4) VFDs, one for each ventilation fan:

o EF-1 o SF-1 o EF-2 o SF-2

Integration with the CO/NO₂ monitoring system Motor control wiring and programming Startup, testing, and operator training All required control modifications for proper operation

If Alternate No. 1 is accepted, the Contractor shall implement the ventilation control sequence identified in the contract documents, including fan operation at reduced and full speed based on control sequence.

The Owner reserves the right to accept or reject this Alternate independently of the Base Bid.

CO/NO₂ Monitoring System A. Provide a combination carbon monoxide (CO) and nitrogen dioxide (NO₂) monitoring system, by ACME, Macurco, Toxalert, Honeywell, CET, or approved equal.

B. System shall include:

CO & NO₂ sensors Control panel(s) Zoning by floor level Line-voltage power to controllers Integration with exhaust and supply fans

C. Contractor shall provide bi-annually calibration during first year of operation.

D. Provide additional sensors as required to meet coverage requirements.

Sensor Protection Requirements

All carbon monoxide (CO) and nitrogen dioxide (NO₂) sensors installed within the parking facility shall be protected from accidental impact, vandalism, maintenance equipment, and vehicle-related damage through the installation of protective sensor cages or guards.

A. Contractor shall furnish and install protective steel wire cages at each CO/NO₂ sensor location. The cage shall be specifically sized to accommodate the sensor manufacturer's installation and calibration requirements while maintaining unrestricted airflow to the sensing elements.

B. Protective cages shall be:

Heavy-duty welded steel construction.

Corrosion-resistant galvanized steel or powder-coated finish.

Mounted securely to the wall, column, or supporting structure.

Installed to permit routine inspection, testing, calibration, and sensor replacement without removal of the mounting assembly.

C. Cage installation shall not obstruct indicator lights, displays, alarm notification devices, communication wiring, or manufacturer-required ventilation openings.

D. Contractor shall coordinate final mounting locations with the sensor manufacturer and the Owner prior to installation. Sensors shall remain readily accessible for maintenance and annual calibration activities.

E. The cost of furnishing and installing protective cages shall be included in the Base Bid and shall not be considered an additional cost item unless specifically identified on the Bid Form.

3. Execution

Demolition / Removal

A. Remove existing fans, dampers, controls, and wiring as necessary.

B. Maintain safe and operable facility conditions during work.

Installation Requirements

A. Install equipment per manufacturer instructions and site conditions.

B. Ensure sensors are coordinated with other trades prior to rough-in.

C. Provide all low-voltage and line-voltage wiring unless explicitly noted otherwise.

D. Electrical contractor provides 120/240V circuits for low-voltage devices except where noted.

Controls and System Integration

A. Base Bid Fans shall be interlocked with the CO/NO₂ monitoring system and controlled based on carbon monoxide (CO) and nitrogen dioxide (NO₂) alarm signals. The control system shall provide automatic fan start and stop in response to monitored gas concentrations.

B. Manual Override Manual start/stop capability shall activate the entire ventilation system if any fan Hand-Off-Auto (HOA) switch is placed in the “ON” position.

C. Alternate No. 1 – Variable Frequency Drives (VFDs) If Alternate No. 1 is accepted by the Owner, furnish and install VFDs and program the control system to operate in accordance with the following sequence:

At 15 ppm CO > Fans to 50% speed At 25 ppm CO > Fans to 100% speed At 1.5 ppm NO₂ > Fans to 50% speed At 3 ppm NO₂ > Fans to 100% speed

D. Base Bid Fan Operation Unless Alternate No. 1 is accepted, fans shall operate at full speed when enabled by the CO/NO₂ monitoring system and shall shut down when gas concentrations fall below programmed setpoints.

Final setpoints shall be coordinated with the monitoring system manufacturer and Owner.

Testing and Commissioning

A. Test all equipment for proper operation.

B. Verify fan airflow, manual override functions, alarm interlocks, sensor operation, and control sequences.

C. If Alternate No. 1 is accepted, verify VFD settings, speed modulation sequences, programming, and fan operation at all specified control points.

D. Provide startup documentation, operator training, and O&M manuals.

E. Provide bi-annual testing and calibration of the CO/NO₂ monitoring system during the two-year warranty period.

4. Submittals

A. Product data for fans, VFDs, controls, and monitoring system B. Shop drawings showing coordination with field conditions C. Wiring diagrams D. O&M manuals E. Startup and calibration reports

5. Basis of Bid – Unit Pricing

Contractor shall complete the Unit Pricing Sheet (provided separately) including:

Fan replacement CO/NO₂ sensors Control panels and integration Additional work (dampers, ductwork adjustments, override switches)

6. Warranty

General Warranty Requirements

A. The Contractor shall provide a minimum two (2) year warranty covering all labor, materials, equipment, controls, sensors, and workmanship associated with the ventilation fan replacement and

CO/NO₂ monitoring system installation.

B. The warranty period shall begin upon substantial completion and acceptance by the Owner.

Equipment Warranty

A. All ventilation fans, motors, VFDs, controls, and monitoring system components shall include a manufacturer’s warranty of not less than two (2) years. If a longer manufacturer warranty exists, the longer term shall apply.

B. During the warranty period, the Contractor shall repair or replace defective equipment at no cost to the Owner, including all labor required to diagnose, remove, and reinstall components.

CO/NO₂ Monitoring System Warranty

A. Sensors, control panels, wiring, and integration hardware shall be warranted against defects for two (2) years minimum.

B. Warranty shall include loss of calibration, premature sensor failure, or inability to interface with fans or VFDs as required by the specified control sequence.

Performance Warranty

A. The Contractor shall warrant that the completed system operates in accordance with the design intent, including but not limited to:

Proper zoning by floor Correct alarm thresholds (CO and NO₂) Fan speed modulation via VFDs Functioning manual override switches Proper controller integration

B. Any operational deficiency identified within the warranty period shall be corrected at the Contractor’s expense.

Warranty Service Response

A. The Contractor shall respond to warranty claims within 48 hours of notification.

B. If a life-safety issue exists (e.g., failed CO/NO₂ sensor or inoperable exhaust fan), Contractor shall respond within 24 hours.

Minneapolis Convention Center (MCC) Site-Specific Requirements

1. Site Access & Credentials The Contractor will be issued keys and badge credentials to access all required areas of the parking facility, including but not limited to:

Mechanical rooms Electrical closets Lower‑level garage areas

Contractor and subcontractor badges will be programmed to allow parking within the facility during the project.

2. Contractor Staffing & Authority The Contractor shall provide to MCC the name and contact information of the onsite Foreman or Project Manager who:

Has full authority to determine daily labor staffing levels Can approve or request changes to the project scope Can modify project schedule to accommodate MCC parking operations and event needs Serves as the primary decision‑maker during construction

3. Communication & Coordination Requirements

The Contractor will coordinate directly with:

The MCC Facilities Manager or Sr. Supervisor The MCC Guest Services Manager or Sr. Supervisor (for parking and public‑facing impacts) The MCC 24/7 Security Operations Center for general access, badge programming, after‑hours entry, and other security needs

4. Safety & Security Response The following requirements apply to all Contractor and subcontractor work performed onsite:

Medical Emergencies For any work-related injury or medical incident requiring treatment beyond basic first aid, the Contractor shall immediately contact the MCC Security Operations Center (SOC) at 612‑335‑6040.

SOC personnel will coordinate emergency medical response, including paramedic or ambulance dispatch when necessary.

Structural Damage or Safety Concerns The Contractor shall immediately report any of the following to the SOC:

Structural damage caused during construction activities Observed or suspected unsafe conditions Equipment impacts, vehicle strikes, or hazards affecting parking operations Any condition that may compromise life safety

SOC will dispatch onsite security personnel and initiate additional emergency procedures if required.

Suspicious Activity or Criminal Concerns If suspicious activity is observed, or if an event may warrant law enforcement involvement, the Contractor shall notify the SOC immediately.

The SOC will determine whether to contact 911 for Minneapolis Police response.

Imminent Life Safety Threats If any imminent threat to life, building occupants, or public safety is identified, the Contractor shall:

1. Notify the SOC immediately at 612‑335‑6040

2. Remove personnel from danger

3. Follow instructions provided by MCC Security or responding emergency agencies

5. Project Kick-Off & Operational Planning

A formal project kick‑off meeting will be required to review and confirm:

Anticipated equipment deliveries Estimated project timeline and work sequencing Staging and materials storage (if required) Identification of parking spaces or entire parking levels requiring restriction, closure, or cone‑off Coordination with MCC event schedules and peak parking demands

MCC reserves the right to adjust Contractor work windows to maintain safe and uninterrupted parking facility operations.