Event_34101-13716_Scope_and_Diagram.pdf

PDF 233 KB Posted

Attached to
Vault Expansion-UPDATED State and local contract opportunity
Solicitation number
Event 34101-13716
Issued by
Gibson County, Livingston Town, Tennessee

About this file

This document is a Scope of Work for a Vault Expansion project by the State of Tennessee, located at 690 Airways Drive in Lexington, TN 38351. The project involves two potential concepts for expanding and securing an existing vault area, with a total expansion of approximately 400 square feet. The scope includes removing existing doors, frames, and plumbing fixtures, cutting new wall openings, installing reinforced CMU walls, and applying expanded metal security coverings to walls and ceilings. Additional work involves installing a new dehumidifier sized for approximately 6,800 cubic feet, LED lighting fixtures, and electronic security systems.

The project offers two design concepts (Concept 1 and Concept 2) with slight variations in wall construction and expansion approach. Both concepts emphasize security enhancement through the installation of 3/16" expanded metal with specific grid opening requirements and weight specifications. The electrical work includes conduit preparation for security systems, and the owner's Electronic Security Systems vendor will install necessary sensors and alarms. The project references AR 190-11, Appendix G, Paragraph G-2, suggesting military or government-related security standards. The documentation is dated 07.30.2025, indicating a future project timeline.

View the file

Other files for this state and local contract opportunity

Other files attached to Vault Expansion-UPDATED, newest first.
File Type Posted
Vault_Expansion.pdf PDF
Event_34101-13716_Scope_and_Diagram.pdf PDF
34101-13716_Terms.pdf PDF
Event_34101-_13716_AMD_One_Questions.pdf PDF
Vault_Expansion.pdf PDF
34101-13716_Terms.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Tennessee

Sourcing Event 34101-13716

Vault Expansion

Location: 690 Airways Drive Lexington, TN 38351

Scope of Work:

1. Remove door and frame to Drill Hall.

2. Infill wall opening with 12” reinforced CMU. Reinforcing is two #4 bars every third block course, doweled 4” into existing wall.

3. Remove hand sink, floor drain and shelf-mounted water heater. Cap plumbing penetrations in wall and below floor.

4. Cut opening in existing 8” concrete wall for new 3’-4” wide x 6’-8” tall hollow metal cased opening.

5. Concept 1 - For the existing 8” and 12” CMU walls (total of three walls) and to create a secured ceiling element, over the entire room-side surface of the walls and to the bottom of the existing steel bar joists install 3/16” expanded metal with a maximum grid opening of 1” x 3” and weighing a minimum of 4.27 pounds per square foot. The new expanded metal shall applied and fastened to the existing CMU walls and steel bar joists so that destruction of the existing and reinforcing materials is required to remove them.

6. Concept 2 – Remove existing 8” CMU wall. Install new reinforced 8” CMU to roof deck above. Reinforcing is two #4 bars every third course, doweled 4” into existing walls. For the existing and new 8” and 12” CMU walls (total of four walls) and to create a secured ceiling element, over the entire room-side surface of the walls and to the bottom of the existing steel bar joists install 3/16” expanded metal with a maximum grid opening of 1” x 3” and weighing a minimum of 4.27 pounds per square foot. The new expanded metal shall applied and fastened to the existing CMU walls and steel bar joists so that destruction of the existing and reinforcing materials is required to remove them.

7. For the existing floor, over the entire surface install Marsten, Irving or pierced steel planking. The new steel planking shall applied and fastened to the existing

CMU walls so that destruction of the existing and reinforcing materials is required to remove them.

8. Install new dehumidifier piped to existing drain. New dehumidifier is to be sized to serve both the existing vault and the expansion area (approximately 6,800 cubic feet).

9. New LED lighting fixtures in existing vault and to bottom of expanded metal in expansion area.

10. Electrical subcontractor to provide conduit as required for use by Electronic Security Systems. See Item 11 below.

11. Owner’s Electronic Security Systems vendor to install new sensors and alarms as necessary to secure the existing and expansion areas of the vault.

Reference: AR 190-11, Appendix G, Paragraph G-2.

LEXINGTON RC VAULT EXPANSION

07.30.2025

Concept 1 Concept 2

Evemt 34101-13716 Scope of Work
diagram