About this file

Manufacturing Readiness Self Assessment

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

#QuestionANSMRLCommentsThreadSub
1Is the Technology Readiness at TRL 1 or greater?1A - Technology & Industrial BaseTechnology Maturity
2Is the Technology Readiness at TRL 2 or greater?2A - Technology & Industrial BaseTechnology Maturity
3Is the Technology Readiness at TRL 3 or greater?3A - Technology & Industrial BaseTechnology Maturity
4Is the Technology Readiness at TRL 4 or greater?4A - Technology & Industrial BaseTechnology Maturity
5Is the Technology Readiness at TRL 5 or greater?5A - Technology & Industrial BaseTechnology Maturity
6Is the Technology Readiness at TRL 6 or greater?6A - Technology & Industrial BaseTechnology Maturity
7Is the Technology Readiness at TRL 7 or greater?7A - Technology & Industrial BaseTechnology Maturity
8Is the Technology Readiness at TRL 7 or greater?8A - Technology & Industrial BaseTechnology Maturity
9Is the Technology Readiness at TRL 9?9A - Technology & Industrial BaseTechnology Maturity
10Is the Technology Readiness at TRL 9?10A - Technology & Industrial BaseTechnology Maturity
11Have potential manufacturing sources been identified for technology needs (Understand state of the art)?3A - Technology & Industrial BaseA.1 - Technology Transition to Production
12Have industrial base capabilities and gaps/risks been identified for key technologies, components, and/or key processes?4A - Technology & Industrial BaseA.1 - Technology Transition to Production
13Has the industrial base assessment been initiated to identify potential manufacturing sources to produce the required capability?5A - Technology & Industrial BaseA.1 - Technology Transition to Production
14Have sole/single/foreign source vendors been identified?5A - Technology & Industrial BaseA.1 - Technology Transition to Production
15Has planning begun to minimize the risks associated with sole/single/foreign source vendors?5A - Technology & Industrial BaseA.1 - Technology Transition to Production
16Has the Industrial Capability Assessment (ICA) for MS B been completed?6A - Technology & Industrial BaseA.1 - Technology Transition to Production
17Is the industrial capability in place to support the manufacturing of development articles?6A - Technology & Industrial BaseA.1 - Technology Transition to Production
18Are the plans to minimize sole/single/foreign sources complete?6A - Technology & Industrial BaseA.1 - Technology Transition to Production
19Has the need for sole/single/foreign sources been justified?6A - Technology & Industrial BaseA.1 - Technology Transition to Production
20Have potential alternative sources been identified?6A - Technology & Industrial BaseA.1 - Technology Transition to Production
21Has the industrial capability to support production been analyzed?7A - Technology & Industrial BaseA.1 - Technology Transition to Production
22Is the stability of all sole/single/foreign sources being assessed/monitored?7A - Technology & Industrial BaseA.1 - Technology Transition to Production
23Are the necessary alternates to sole/single/foreign sources being developed?7A - Technology & Industrial BaseA.1 - Technology Transition to Production
24Has the Industrial Capability Assessment (ICA) for Milestone C been completed?8A - Technology & Industrial BaseA.1 - Technology Transition to Production
25Is the industrial capability in place to support Low Rate Initial Production (LRIP)?8A - Technology & Industrial BaseA.1 - Technology Transition to Production
26Are all necessary sources available including multi-sourcing where cost-effective or necessary to mitigate risk?8A - Technology & Industrial BaseA.1 - Technology Transition to Production
27Is the industrial capability in place to support the start of Full Rate Production (FRP)?9A - Technology & Industrial BaseA.1 - Technology Transition to Production
28Does the industrial capability support Full Rate Production (FRP)?10A - Technology & Industrial BaseA.1 - Technology Transition to Production
29Has the industrial capability been assessed to support modifications, upgrades, surge, and other potential manufacturing requirements?10A - Technology & Industrial BaseA.1 - Technology Transition to Production
30Have new manufacturing concepts and potential solutions been identified?2A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
31Have manufacturing technology concepts been identified through experiments/models?3A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
32Have pertinent Manufacturing Science (MS) and Advanced Manufacturing Technology requirements been identified?4A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
33Have the required manufacturing technology development efforts been initiated as applicable?5A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
34Are the necessary manufacturing technology development efforts continuing?6A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
35Have the required manufacturing technology development solutions been demonstrated in a production relevant environment?6A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
36Are the necessary manufacturing technology development efforts still continuing?7A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
37Have the required manufacturing science and manufacturing technology development solutions been demonstrated in a production representative environment?7A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
38Are the primary manufacturing technology efforts concluding and some improvement efforts continuing?8A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
39Have the required manufacturing technology development solutions been validated on a pilot line?8A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
40Have the required manufacturing technology process improvement efforts been initiated for Full Rate Production (FRP)?9A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
41Are manufacturing technology continuous process improvements ongoing?10A - Technology & Industrial BaseA.2 - Manufacturing Technology Development
42Have relevant materials/processes been evaluated for manufacturability using experimental results?3B - DesignB.1 - Producibility Program
43Are initial producibility and manufacturability assessments of preferred systems concepts completed?4B - DesignB.1 - Producibility Program
44Are the results of the producibility and manufacturability assessment being considered in the selection of preferred design concepts?4B - DesignB.1 - Producibility Program
45Are the results of the producibility and manufacturability assessment being reflected in the Technology Development Strategy key components/technologies?4B - DesignB.1 - Producibility Program
46Have producibility & manufacturability assessments of key technologies and components been initiated as appropriate?5B - DesignB.1 - Producibility Program
47Do ongoing design trades consider manufacturing processes and industrial base capability constraints?5B - DesignB.1 - Producibility Program
48Have the manufacturing processes been assessed for capability to test and verify in production and their influence on Operations and Support (O&S)?5B - DesignB.1 - Producibility Program
49Have producibility assessments and producibility trade studies (performance vs. producibility) of key technologies/components been completed?6B - DesignB.1 - Producibility Program
50Are the results of the producibility assessments and trade studies being used to shape the Acquisition Strategy, Systems Engineering Plan (SEP), Manufacturing and Producibility plans, and Planning for Engineering and Manufacturing Development (EMD) or technology insertion programs?6B - DesignB.1 - Producibility Program
51Are the preliminary design choices assessed against manufacturing processes and industrial base capability constraints?6B - DesignB.1 - Producibility Program
52Are the producibility enhancement efforts (e.g. Design For Mfg Assembly (DFX)) initiated?6B - DesignB.1 - Producibility Program
53Are the detailed producibility trade studies using detailed knowledge of key design characteristics and related manufacturing process capabilities completed?7B - DesignB.1 - Producibility Program
54Are the producibility enhancement efforts (e.g. Design For Mfg Assembly) ongoing for an optimized integrated system?7B - DesignB.1 - Producibility Program
55Are manufacturing processes re-assessed as needed for capability to test and verify potential influence on Operations & Support?7B - DesignB.1 - Producibility Program
56Have the producibility improvements been implemented on the system?8B - DesignB.1 - Producibility Program
57Have the known producibility issues been resolved and pose no significant risk for Low Rate Initial Production (LRIP)?8B - DesignB.1 - Producibility Program
58Have prior producibility improvements been analyzed for effectiveness during Low Rate Initial Production (LRIP)?9B - DesignB.1 - Producibility Program
59Have the producibility issues/risks discovered in Low Rate Initial Production (LRIP) been mitigated and pose no significant risk for Full Rate Production (FRP)?9B - DesignB.1 - Producibility Program
60Have design producibility improvements been demonstrated in Full Rate Production (FRP)?10B - DesignB.1 - Producibility Program
61Are process producibility improvements ongoing?10B - DesignB.1 - Producibility Program
62Are all modifications, upgrades, Diminishing Mfg Sources & Material Shortages (DMSMS), and other changes assessed for producibility?10B - DesignB.1 - Producibility Program
63Have manufacturing research opportunities been identified?1B - DesignB.2 - Design Maturity
64Have applications been defined?2B - DesignB.2 - Design Maturity
65Have broad performance goals been identified that may drive manufacturing options?2B - DesignB.2 - Design Maturity
66Have top level performance requirements been defined?3B - DesignB.2 - Design Maturity
67Have trade-offs in design options been assessed based on experiments?3B - DesignB.2 - Design Maturity
68Are product lifecycle requirements and technical requirements being evaluated?3B - DesignB.2 - Design Maturity
69Do the Systems Engineering Plan (SEP) and the Test and Evaluation Strategy recognize the need for the establishment/validation of manufacturing capability and management of manufacturing risk for the product lifecycle?4B - DesignB.2 - Design Maturity
70Have initial potential Key Performance Parameters (KPPs) been identified for the preferred systems concept?4B - DesignB.2 - Design Maturity
71Are system characteristics and measures to support required capabilities identified?4B - DesignB.2 - Design Maturity
72Are form, fit, and function constraints and manufacturing capabilities identified for the preferred systems concepts?4B - DesignB.2 - Design Maturity
73Are lower level performance requirements sufficient to proceed to the preliminary design?5B - DesignB.2 - Design Maturity
74Are all enabling/critical technologies and components identified?5B - DesignB.2 - Design Maturity
75Do enabling/critical technologies and components consider the product lifecycle?5B - DesignB.2 - Design Maturity
76Have the evaluation of design Key Characteristics (KC) been initiated?5B - DesignB.2 - Design Maturity
77Have product data required for prototype component manufacturing been released?5B - DesignB.2 - Design Maturity
78Has a system allocated baseline been established?6B - DesignB.2 - Design Maturity
79Are the system and subsystem preliminary design sufficient for Engineering and Manufacturing Development (EMD)?6B - DesignB.2 - Design Maturity
80Have all enabling/critical technologies/components been demonstrated?6B - DesignB.2 - Design Maturity
81Have preliminary design Key Characteristics (KC) been defined?6B - DesignB.2 - Design Maturity
82Are the product requirements and features well enough defined to support critical design review even though design change traffic may be significant?7B - DesignB.2 - Design Maturity
83Has all the product data essential for component manufacturing been released?7B - DesignB.2 - Design Maturity
84Have potential Key Characteristic risk issues been identified?7B - DesignB.2 - Design Maturity
85Is a mitigation plan in place for potential Key Characteristic risk issues?7B - DesignB.2 - Design Maturity
86Is the detailed design of product features and interfaces complete?8B - DesignB.2 - Design Maturity
87Has all the product data essential for system manufacturing been released?8B - DesignB.2 - Design Maturity
88Does the design change traffic have minimal impact on Low Rate Initial Production (LRIP)?8B - DesignB.2 - Design Maturity
89Are the Key Characteristics attainable based upon pilot line demonstrations?8B - DesignB.2 - Design Maturity
90Are the major product design features and configuration stable?9B - DesignB.2 - Design Maturity
91Has the system design been validated through operational testing of Low Rate Initial Production (LRIP) items?9B - DesignB.2 - Design Maturity
92Is the Physical Configuration Audit (PCA) or equivalent complete as necessary?9B - DesignB.2 - Design Maturity
93Is the design change traffic limited to minor configuration changes?9B - DesignB.2 - Design Maturity
94Are all Key Characteristics controlled in Low Rate Initial Production (LRIP) to appropriate quality levels?9B - DesignB.2 - Design Maturity
95Is the product design stable (i.e. design changes are few and generally limited to those required for continuous improvement or in reaction to obsolescence)?10B - DesignB.2 - Design Maturity
96Are all Key Characteristics controlled in Full Rate Production (FRP) to appropriate quality levels?10B - DesignB.2 - Design Maturity
97Has the cost model approach been defined?2C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
98Have initial cost targets and risks been identified?3C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
99Has a high level process chart model been developed?3C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
100Have technology cost models been developed for new process steps and materials based on experiments?3C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
101Have key manufacturing, material and specialized requirement cost drivers been identified?4C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
102Are detailed process chart cost models driven by process variables?4C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
103Has cost driver uncertainty been quantified?4C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
104Do prototype components produced in a production relevant environment, or simulations drive end-to-end cost models?5C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
105Is there a realistic cost model that includes materials, labor, equipment, tooling/Special Test Equipment (STE), setup, yield/scrap/rework, Work In Progress (WIP), and capability/capacity constraints?5C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
106Have cost models been updated with design requirements, material specifications, tolerances, integrated master schedule, results of system/subsystem simulations and production relevant prototype demonstrations?6C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
107Are cost models updated with the results of systems/sub-systems produced in a production representative environment, production plant layout and design, and obsolescence solutions?7C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
108Have cost models been updated with results of the pilot line build?8C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
109Has the Full Rate Production (FRP) cost model been updated with the result of the Low Rate Initial Production (LRIP) build?9C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
110Has the cost model been validated against actual Full Rate Production (FRP) cost?10C - Cost & FundingC.1 - Production Cost Knowledge (Cost modeling)
111Have manufacturing cost implications been identified?1C - Cost & FundingC.2 - Cost Analysis
112Have cost elements been identified?2C - Cost & FundingC.2 - Cost Analysis
113Has a sensitivity analysis been conducted to define cost drivers and production development strategy (i.e. lab to pilot to factory)?3C - Cost & FundingC.2 - Cost Analysis
114Have producibility cost risks been assessed?4C - Cost & FundingC.2 - Cost Analysis
115Do initial cost models support Analysis of Alternatives (AoA) and Alternative Systems Review (ASR)?4C - Cost & FundingC.2 - Cost Analysis
116Are costs analyzed using prototype component actuals to ensure target costs are achievable?5C - Cost & FundingC.2 - Cost Analysis
117Are decisions regarding design choices, make/buy, capacity, process capability, sources, quality, key characteristics, yield/rate, and variability influenced by cost models?5C - Cost & FundingC.2 - Cost Analysis
118Are costs analyzed using prototype system/sub-system actuals to ensure target costs are achievable?6C - Cost & FundingC.2 - Cost Analysis
119Have cost targets been allocated to subsystems?6C - Cost & FundingC.2 - Cost Analysis
120Have cost reduction and avoidance strategies been developed?6C - Cost & FundingC.2 - Cost Analysis
121Have the manufacturing costs been rolled up to the system/sub-system level and been tracked against targets?7C - Cost & FundingC.2 - Cost Analysis
122Are detailed trade studies and engineering change requests supported by cost estimates?7C - Cost & FundingC.2 - Cost Analysis
123Are cost reduction and avoidance strategies underway?7C - Cost & FundingC.2 - Cost Analysis
124Are costs analyzed using pilot line actuals to ensure target costs are achievable?8C - Cost & FundingC.2 - Cost Analysis
125Does manufacturing cost analysis support proposed changes to requirements or configuration?8C - Cost & FundingC.2 - Cost Analysis
126Are the cost reduction initiatives ongoing?8C - Cost & FundingC.2 - Cost Analysis
127Have Low Rate Initial Production (LRIP) cost goals been met and has the learning curve been analyzed with actual data?9C - Cost & FundingC.2 - Cost Analysis
128Are the cost reduction initiatives still ongoing?9C - Cost & FundingC.2 - Cost Analysis
129Has touch labor efficiency been analyzed to meet production rates?9C - Cost & FundingC.2 - Cost Analysis
130Have elements of inefficiency for touch labor been identified with plans in place for reduction?9C - Cost & FundingC.2 - Cost Analysis
131Have Full Rate Production (FRP) cost goals been met?10C - Cost & FundingC.2 - Cost Analysis
132Are the cost reduction initiatives continuing?10C - Cost & FundingC.2 - Cost Analysis
133Have potential investments been identified?1C - Cost & FundingC.3 - Manufacturing Investment Budget
134Do the program/projects have reasonable budget estimates for reaching MRL 3 through experiment?2C - Cost & FundingC.3 - Manufacturing Investment Budget
135Do the program/projects have reasonable budget estimates for reaching MRL 4 by Milestone A?3C - Cost & FundingC.3 - Manufacturing Investment Budget
136Have manufacturing technology initiatives been identified to reduce costs?4C - Cost & FundingC.3 - Manufacturing Investment Budget
137Does the program have a reasonable budget estimate to reach MRL 6 by Milestone B?4C - Cost & FundingC.3 - Manufacturing Investment Budget
138Does the cost estimate include capital investment for production-relevant equipment?4C - Cost & FundingC.3 - Manufacturing Investment Budget
139Are all outstanding MRL 4 risk areas understood with approved mitigation plans in place?4C - Cost & FundingC.3 - Manufacturing Investment Budget
140Does the program have an updated budget estimate for reaching MRL 6 by Milestone B?5C - Cost & FundingC.3 - Manufacturing Investment Budget
141Are all outstanding MRL 5 risk areas understood with approved mitigation plans in place?5C - Cost & FundingC.3 - Manufacturing Investment Budget
142Does the program have a reasonable budget estimate for reaching MRL 8 by Milestone C?6C - Cost & FundingC.3 - Manufacturing Investment Budget
143Does the cost estimate include capital investment for production-representative equipment by CDR and pilot line equipment by Milestone C?6C - Cost & FundingC.3 - Manufacturing Investment Budget
144Are all outstanding MRL 6 risk areas understood with approved mitigation plans in place?6C - Cost & FundingC.3 - Manufacturing Investment Budget
145Does the program have an updated budget estimate for reaching MRL 8 by Milestone C?7C - Cost & FundingC.3 - Manufacturing Investment Budget
146Are all outstanding MRL 7 risk areas understood with approved mitigation plans in place?7C - Cost & FundingC.3 - Manufacturing Investment Budget
147Does the program have a reasonable budget estimate for reaching MRL 9 by the Full Rate Production (FRP) decision point?8C - Cost & FundingC.3 - Manufacturing Investment Budget
148Does the cost estimate include investment for Low Rate Initial Production (LRIP) and Full Rate Production (FRP)?8C - Cost & FundingC.3 - Manufacturing Investment Budget
149Are all outstanding MRL 8 risk areas understood with approved mitigation plans in place?8C - Cost & FundingC.3 - Manufacturing Investment Budget
150Does the program have a reasonable budget estimate for Full Rate Production (FRP)?9C - Cost & FundingC.3 - Manufacturing Investment Budget
151Are all outstanding MRL 9 risk areas understood with approved mitigation plans in place?9C - Cost & FundingC.3 - Manufacturing Investment Budget
152Are the production budgets sufficient for production at the required rates and schedule to support the funded program?10C - Cost & FundingC.3 - Manufacturing Investment Budget
153Have material properties been identified for research?1D - MaterialsD.1 - Maturity
154Have material properties and characteristics been predicted?2D - MaterialsD.1 - Maturity
155Have material properties been validated and assessed for basic manufacturability using experiments?3D - MaterialsD.1 - Maturity
156Has a survey been completed to determine if the projected material has been produced in a laboratory environment?4D - MaterialsD.1 - Maturity
157Have all materials been manufactured or produced in a prototype environment (may be in a similar application/program)?5D - MaterialsD.1 - Maturity
158Are maturity efforts in place to address new material production risks for technology demonstration?5D - MaterialsD.1 - Maturity
159Has the material maturity been verified with technology demonstration articles?6D - MaterialsD.1 - Maturity
160Are preliminary material specifications in place?6D - MaterialsD.1 - Maturity
161Have material properties been adequately characterized?6D - MaterialsD.1 - Maturity
162Is the material maturity sufficient for a pilot line build?7D - MaterialsD.1 - Maturity
163Have the necessary material specifications been approved?7D - MaterialsD.1 - Maturity
164Have the materials been proven and validated during Engineering and Manufacturing Development (EMD) as adequate to support Low Rate Initial Production (LRIP)?8D - MaterialsD.1 - Maturity
165Are material specifications stable?8D - MaterialsD.1 - Maturity
166Have all necessary materials been proven and controlled to specification in Low Rate Initial Production (LRIP)?9D - MaterialsD.1 - Maturity
167Have all necessary materials been proven and controlled to specification in Full Rate Production (FRP)?10D - MaterialsD.1 - Maturity
168Has material availability been assessed?2D - MaterialsD.2 - Availability
169Have material scale-up issues been identified?3D - MaterialsD.2 - Availability
170Have projected lead times been identified for all difficult to obtain, difficult to process, or hazardous materials?4D - MaterialsD.2 - Availability
171Have material quantities and lead times been estimated?4D - MaterialsD.2 - Availability
172Have material availability issues been addressed for the prototype build?5D - MaterialsD.2 - Availability
173Have significant material risks been identified for all materials?5D - MaterialsD.2 - Availability
174Has planning begun to address scale-up issues?5D - MaterialsD.2 - Availability
175Have material availability issues been addressed to meet Engineering and Manufacturing Development (EMD) build?6D - MaterialsD.2 - Availability
176Have potential obsolescence issues been identified?6D - MaterialsD.2 - Availability
177Have material availability issues been addressed to meet Engineering and Manufacturing Development (EMD) builds?7D - MaterialsD.2 - Availability
178Have long lead procurements been identified/planned for Low Rate Initial Production (LRIP)?7D - MaterialsD.2 - Availability
179Is an obsolescence plan in place?7D - MaterialsD.2 - Availability
180Have long lead procurements been initiated for Low Rate Initial Production (LRIP)?8D - MaterialsD.2 - Availability
181Are material availability risk issues minimized for Low Rate Initial Production (LRIP)?8D - MaterialsD.2 - Availability
182Have long lead procurements been initiated for Full Rate Production (FRP)?9D - MaterialsD.2 - Availability
183Are availability risk issues minimized for Full Rate Production (FRP)?9D - MaterialsD.2 - Availability
184Are all significant Full Rate Production (FRP) material availability risk issues resolved?10D - MaterialsD.2 - Availability
185Has an initial assessment of potential supply chain capability been completed?3D - MaterialsD.3 - Supply Chain Management
186Has a survey for potential supply chain sources been completed?4D - MaterialsD.3 - Supply Chain Management
187Have potential supply chain sources been identified?5D - MaterialsD.3 - Supply Chain Management
188Are supply chain plans (e.g., teaming agreements, etc.) in place leading to an Engineering and Manufacturing Development (EMD) contract award?6D - MaterialsD.3 - Supply Chain Management
189Is there an effective supply chain management process in place?7D - MaterialsD.3 - Supply Chain Management
190Has an adequate assessment of the first tier supply chain been completed?7D - MaterialsD.3 - Supply Chain Management
191Is the supply chain adequate to support Low Rate Initial Production (LRIP)?8D - MaterialsD.3 - Supply Chain Management
192Has an adequate assessment of the critical second and lower tier supply chain been completed?8D - MaterialsD.3 - Supply Chain Management
193Is the supply chain stable and adequate to support Full Rate Production (FRP)?9D - MaterialsD.3 - Supply Chain Management
194Are long term agreements in place where practical?9D - MaterialsD.3 - Supply Chain Management
195Has the supply chain been proven to support Full Rate Production (FRP) requirements?10D - MaterialsD.3 - Supply Chain Management
196Has an initial evaluation of potential regulatory requirements and special handling concerns been completed?2D - MaterialsD.4 - Special Handling
197Has a list of hazardous materials been identified?3D - MaterialsD.4 - Special Handling
198Have potential special handling procedures been applied in the lab?3D - MaterialsD.4 - Special Handling
199Have special handling concerns been assessed?3D - MaterialsD.4 - Special Handling
200Has a list of hazardous materials been updated?4D - MaterialsD.4 - Special Handling
201Have special handling requirements been identified?4D - MaterialsD.4 - Special Handling
202Have the special handling procedures been applied in the lab?4D - MaterialsD.4 - Special Handling
203Have special handling procedures been applied in a production relevant environment?5D - MaterialsD.4 - Special Handling
204Have all special handling requirement gaps been identified?5D - MaterialsD.4 - Special Handling
205Have new special handling processes been demonstrated in lab environment?5D - MaterialsD.4 - Special Handling
206Have special handling procedures been applied in a production relevant environment?6D - MaterialsD.4 - Special Handling
207Have the plans to address the special handling requirement gaps been completed?6D - MaterialsD.4 - Special Handling
208Have special handling procedures been applied in a production representative environment?7D - MaterialsD.4 - Special Handling
209Have special handling procedures been developed and annotated on work instructions?7D - MaterialsD.4 - Special Handling
210Have special handling procedures been applied in a pilot line environment?8D - MaterialsD.4 - Special Handling
211Have special handling procedures been demonstrated in Engineering and Manufacturing Development (EMD) or technology insertion programs?8D - MaterialsD.4 - Special Handling
212Have the special handling risk issues been minimized for Low Rate Initial Production (LRIP)?8D - MaterialsD.4 - Special Handling
213Do all work instructions contain special handling provisions as required?8D - MaterialsD.4 - Special Handling
214Have special handling procedures been applied in a Low Rate Initial Production (LRIP) environment?9D - MaterialsD.4 - Special Handling
215Have the special handling procedures been demonstrated in Low Rate Initial Production (LRIP)?9D - MaterialsD.4 - Special Handling
216Have the special handling risk issues been minimized for Full Rate Production (FRP)?9D - MaterialsD.4 - Special Handling
217Have the special handling procedures been effectively implemented in Full Rate Production (FRP)?10D - MaterialsD.4 - Special Handling
218Have initial models been developed, if applicable?2E - Process Capability & ControlE.1 - Modeling & Simulation
219Have proposed manufacturing concepts or producibility needs been identified based on high-level process flow chart models?3E - Process Capability & ControlE.1 - Modeling & Simulation
220Have production modeling and simulation approaches for process or product been identified?4E - Process Capability & ControlE.1 - Modeling & Simulation
221Have the initial simulation models (product or process) been developed at the component level?5E - Process Capability & ControlE.1 - Modeling & Simulation
222Have the initial simulation models been developed at the technology sub-system or system level?6E - Process Capability & ControlE.1 - Modeling & Simulation
223Have the simulation models been used to determine system constraints and identify improvement opportunities?7E - Process Capability & ControlE.1 - Modeling & Simulation
224Have the simulation models been verified by the pilot line?8E - Process Capability & ControlE.1 - Modeling & Simulation
225Have the results of the simulation models been used to improve processes and determine that Low Rate Initial Production (LRIP) requirements can be met?8E - Process Capability & ControlE.1 - Modeling & Simulation
226Have the simulation models been verified by Low Rate Initial Production (LRIP) build and used to assist in management of Low Rate Initial Production (LRIP)?9E - Process Capability & ControlE.1 - Modeling & Simulation
227Have the results of the simulation models been used to determine if Full Rate Production (FRP) requirements can be met?9E - Process Capability & ControlE.1 - Modeling & Simulation
228Have the simulation models been verified by Full Rate Production (FRP) build?10E - Process Capability & ControlE.1 - Modeling & Simulation
229Have the production simulation models been used as a tool to assist in management of Full Rate Production (FRP)?10E - Process Capability & ControlE.1 - Modeling & Simulation
230Have material and/or process approaches been identified?2E - Process Capability & ControlE.2 - Manufacturing Process Maturity
231Have high level manufacturing processes been documented?3E - Process Capability & ControlE.2 - Manufacturing Process Maturity
232Have critical manufacturing processes been identified through experimentation?3E - Process Capability & ControlE.2 - Manufacturing Process Maturity
233Has a survey been completed to determine the current state of critical processes?4E - Process Capability & ControlE.2 - Manufacturing Process Maturity
234Has process maturity been assessed on similar processes in production?5E - Process Capability & ControlE.2 - Manufacturing Process Maturity
235Have process capability requirements been identified for pilot line, Low Rate Initial Production (LRIP) and Full Rate Production (FRP)?5E - Process Capability & ControlE.2 - Manufacturing Process Maturity
236Have the key manufacturing processes been demonstrated in a production relevant environment?6E - Process Capability & ControlE.2 - Manufacturing Process Maturity
237Has collecting or estimating process capability data from prototype build begun?6E - Process Capability & ControlE.2 - Manufacturing Process Maturity
238Have the manufacturing processes been successfully demonstrated in a production representative environment?7E - Process Capability & ControlE.2 - Manufacturing Process Maturity
239Has collecting or estimating process capability data continued?7E - Process Capability & ControlE.2 - Manufacturing Process Maturity
240Have the manufacturing processes for Low Rate Initial Production (LRIP) been verified on a pilot line?8E - Process Capability & ControlE.2 - Manufacturing Process Maturity
241Does capability data from the pilot line meet the target?8E - Process Capability & ControlE.2 - Manufacturing Process Maturity
242Are the manufacturing processes stable, adequately controlled, capable, and have the manufacturing processes achieved program Low Rate Initial Production (LRIP) objectives?9E - Process Capability & ControlE.2 - Manufacturing Process Maturity
243Have variability experiments been conducted to show Full Rate Production (FRP) impact and potential for continuous improvement?9E - Process Capability & ControlE.2 - Manufacturing Process Maturity
244Are the manufacturing processes stable, adequately controlled, capable, and have the manufacturing processes achieved program Full Rate Production (FRP) objectives?10E - Process Capability & ControlE.2 - Manufacturing Process Maturity
245Have initial estimates of yields and rates based on experiments or state of the art been completed?3E - Process Capability & ControlE.3 - Process Yields and Rates
246Has a yield and rates assessment on proposed/similar processes been completed?4E - Process Capability & ControlE.3 - Process Yields and Rates
247Has a yield and rates assessment on proposed/similar processes been applied within the Analysis of Alternatives (AoA)?4E - Process Capability & ControlE.3 - Process Yields and Rates
248Have target yield and rates been established for the pilot line, Low Rate Initial Production (LRIP), and Full Rate Production (FRP)?5E - Process Capability & ControlE.3 - Process Yields and Rates
249Have yield and rate issues been identified?5E - Process Capability & ControlE.3 - Process Yields and Rates
250Have yield and rate improvement plans been developed/initiated?5E - Process Capability & ControlE.3 - Process Yields and Rates
251Are yields and rates from the production relevant environment being evaluated against targets?6E - Process Capability & ControlE.3 - Process Yields and Rates
252Are results from the yields and rates from the production relevant environment being fed into an improvement plan?6E - Process Capability & ControlE.3 - Process Yields and Rates
253Are yields and rates from the production representative environment being evaluated against pilot line targets?7E - Process Capability & ControlE.3 - Process Yields and Rates
254Are results from the yields and rates from the production representative environment being fed into improvement plans?7E - Process Capability & ControlE.3 - Process Yields and Rates
255Have pilot line yield and rate targets been achieved?8E - Process Capability & ControlE.3 - Process Yields and Rates
256Have yields and rates required to begin Low Rate Initial Production (LRIP) been verified using pilot line articles?8E - Process Capability & ControlE.3 - Process Yields and Rates
257Are yield and rate improvement plans ongoing and being updated?8E - Process Capability & ControlE.3 - Process Yields and Rates
258Have the Low Rate Initial Production (LRIP) yield and rate targets been achieved?9E - Process Capability & ControlE.3 - Process Yields and Rates
259Are yield improvements on-going?9E - Process Capability & ControlE.3 - Process Yields and Rates
260Have the Full Rate Production (FRP) yield and rate targets been achieved?10E - Process Capability & ControlE.3 - Process Yields and Rates
261Are yield improvements on-going?10E - Process Capability & ControlE.3 - Process Yields and Rates
262Has a quality strategy been identified as part of the Technology Development Strategy (TDS)?4F - Quality ManagementF.1 - Quality Management including Supplier Quality
263Is a quality strategy included in the System Engineering Plan (SEP)?4F - Quality ManagementF.1 - Quality Management including Supplier Quality
264Has the quality strategy been updated to reflect Key Characteristic identification activities?5F - Quality ManagementF.1 - Quality Management including Supplier Quality
265Is there an initial Quality Plan (QP) and a Quality Management System (QMS) in place?6F - Quality ManagementF.1 - Quality Management including Supplier Quality
266Have quality risks and adequate metrics been identified?6F - Quality ManagementF.1 - Quality Management including Supplier Quality
267Have the quality targets been established?7F - Quality ManagementF.1 - Quality Management including Supplier Quality
268Has the ability to collect and analyze quality data (process and system) been demonstrated in the production representative environment?7F - Quality ManagementF.1 - Quality Management including Supplier Quality
269Has quality targets been demonstrated on the pilot line?8F - Quality ManagementF.1 - Quality Management including Supplier Quality
270Is continuous quality improvement on-going?8F - Quality ManagementF.1 - Quality Management including Supplier Quality
271Have supplier products completed qualification testing and first article inspection?8F - Quality ManagementF.1 - Quality Management including Supplier Quality
272Have supplier products passed acceptance testing at a rate adequate to begin Low Rate Initial Production (LRIP)?8F - Quality ManagementF.1 - Quality Management including Supplier Quality
273Have quality targets been verified on the Low Rate Initial Production (LRIP) line?9F - Quality ManagementF.1 - Quality Management including Supplier Quality
274Is continuous quality improvement on-going?9F - Quality ManagementF.1 - Quality Management including Supplier Quality
275Have supplier products passed acceptance testing at a rate adequate to transition to Full Rate Production (FRP)?9F - Quality ManagementF.1 - Quality Management including Supplier Quality
276Have the quality targets been verified on the Full Rate Production (FRP) line?10F - Quality ManagementF.1 - Quality Management including Supplier Quality
277Is continuous quality improvement on-going?10F - Quality ManagementF.1 - Quality Management including Supplier Quality
278Have new manufacturing skills been identified?3G - Mfg PersonnelG.1 - Manufacturing Personnel
279Have manufacturing skill sets been identified?4G - Mfg PersonnelG.1 - Manufacturing Personnel
280Have production workforce requirements (technical and operational) been evaluated as part of AoA?4G - Mfg PersonnelG.1 - Manufacturing Personnel
281Has the availability of process development workforce for the Technology Development Phase been determined?4G - Mfg PersonnelG.1 - Manufacturing Personnel
282Have the necessary workforce skill sets been identified to meet prototype production needs?5G - Mfg PersonnelG.1 - Manufacturing Personnel
283Have plans for the identified skill sets been developed to meet prototype production needs?5G - Mfg PersonnelG.1 - Manufacturing Personnel
284Have special skills certification and training requirements been established?5G - Mfg PersonnelG.1 - Manufacturing Personnel
285Are the manufacturing workforce skills available for production in a relevant environment?6G - Mfg PersonnelG.1 - Manufacturing Personnel
286Have resources (quantities and skill sets) been identified to achieve requirements for pilot line and production?6G - Mfg PersonnelG.1 - Manufacturing Personnel
287Have initial plans for the identified resources (quantities and skill sets) been developed to achieve requirements for pilot line and production?6G - Mfg PersonnelG.1 - Manufacturing Personnel
288Have the manufacturing workforce resource requirements been identified for the pilot line?7G - Mfg PersonnelG.1 - Manufacturing Personnel
289Have plans been developed to achieve pilot line requirements?7G - Mfg PersonnelG.1 - Manufacturing Personnel
290Have plans been updated to achieve Low Rate Initial Production (LRIP) workforce requirements?7G - Mfg PersonnelG.1 - Manufacturing Personnel
291Has the pilot line workforce been trained in the representative environment?7G - Mfg PersonnelG.1 - Manufacturing Personnel
292Have manufacturing workforce resource requirements been identified for Low Rate Initial Production (LRIP)?8G - Mfg PersonnelG.1 - Manufacturing Personnel
293Have plans been developed to achieve Low Rate Initial Production (LRIP) requirements?8G - Mfg PersonnelG.1 - Manufacturing Personnel
294Have plans been updated to achieve Full Rate Production (FRP) workforce requirements?8G - Mfg PersonnelG.1 - Manufacturing Personnel
295Have Low Rate Initial Production (LRIP) personnel been trained on the pilot line where possible?8G - Mfg PersonnelG.1 - Manufacturing Personnel
296Have Low Rate Initial Production (LRIP) personnel requirements been met?9G - Mfg PersonnelG.1 - Manufacturing Personnel
297Has a plan been implemented to achieve Full Rate Production (FRP) workforce requirements?9G - Mfg PersonnelG.1 - Manufacturing Personnel
298Have Full Rate Production (FRP) personnel requirements been met?10G - Mfg PersonnelG.1 - Manufacturing Personnel
299Are production workforce skill sets being maintained due to attrition of the workforce?10G - Mfg PersonnelG.1 - Manufacturing Personnel
300Are tooling/Special Test Equipment (STE)/Special Inspection Equipment (SIE) requirements being considered as part of AoA?4H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
301Have tooling and STE/SIE requirements been identified?5H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
302Have supporting rationale and a schedule been provided for the tooling and STE/SIE requirements?5H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
303Have prototype tooling and STE/SIE concepts been demonstrated in production relevant environment?6H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
304Have production tooling and STE/SIE requirements been developed?6H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
305Are production tooling and STE/SIE design and development efforts underway?7H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
306Has a manufacturing equipment maintenance strategy been developed?7H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
307Have all tooling, test, and inspection equipment been proven on the pilot line?8H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
308Have all tooling, test and inspection equipment requirements been identified for Low Rate Initial Production (LRIP)?8H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
309Has manufacturing equipment maintenance been demonstrated on pilot line?8H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
310Have all tooling, test, and inspection equipment been proven in the Low Rate Initial Production (LRIP)?9H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
311Have all tooling, test, and inspection equipment requirements been identified for Full Rate Production (FRP)?9H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
312Has a manufacturing equipment maintenance schedule been demonstrated?9H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
313Is proven tooling, test, and inspection equipment in place to support maximum Full Rate Production (FRP)?10H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
314Has a planned equipment maintenance schedule been achieved?10H - FacilitiesH.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE)
315Have specialized facility requirements/needs been identified?3H - FacilitiesH.2 - Facilities
316Has the availability of manufacturing facilities for prototype development and production been evaluated as part of the Analysis of Alternatives (AoA)?4H - FacilitiesH.2 - Facilities
317Have manufacturing facilities been identified to produce prototypes?5H - FacilitiesH.2 - Facilities
318Have plans for the identified manufacturing facilities been developed to produce prototypes?5H - FacilitiesH.2 - Facilities
319Have manufacturing facilities been identified to produce the pilot line build?6H - FacilitiesH.2 - Facilities
320Have plans for the identified manufacturing facilities been developed to produce the pilot line build?6H - FacilitiesH.2 - Facilities
321Have manufacturing facilities been identified to produce the Low Rate Initial Production (LRIP) build?7H - FacilitiesH.2 - Facilities
322Have plans for the identified manufacturing facilities been developed to produce the Low Rate Initial Production (LRIP) build?7H - FacilitiesH.2 - Facilities
323Have pilot line facilities been demonstrated?8H - FacilitiesH.2 - Facilities
324Are manufacturing facilities adequate to begin Low Rate Initial Production (LRIP)?8H - FacilitiesH.2 - Facilities
325Are plans in place to support the transition to Full Rate Production (FRP)?8H - FacilitiesH.2 - Facilities
326Have manufacturing facilities been demonstrated in Low Rate Initial Production (LRIP)?9H - FacilitiesH.2 - Facilities
327Are capacity plans adequate to support Full Rate Production (FRP)?9H - FacilitiesH.2 - Facilities
328Are the production facilities in place to meet Full Rate Production (FRP) requirements?10H - FacilitiesH.2 - Facilities
329Has the capacity of the production facilities been demonstrated to meet Full Rate Production (FRP) requirements?10H - FacilitiesH.2 - Facilities
330Has a manufacturing strategy been developed and integrated with an acquisition strategy?4I - Mfg ManagementI.1 - Mfg Planning & Scheduling
331Have prototype schedule risk mitigation efforts been incorporated into the Technology Development Strategy (TDS)?4I - Mfg ManagementI.1 - Mfg Planning & Scheduling
332Has the manufacturing strategy been refined based upon the preferred concept?5I - Mfg ManagementI.1 - Mfg Planning & Scheduling
333Have prototype schedule risk mitigation efforts been initiated?5I - Mfg ManagementI.1 - Mfg Planning & Scheduling
334Has the initial manufacturing approach been developed?6I - Mfg ManagementI.1 - Mfg Planning & Scheduling
335Are all system design related manufacturing events included in the Integrated Master Plan/Schedule (IMP/S)?6I - Mfg ManagementI.1 - Mfg Planning & Scheduling
336Has the manufacturing risk mitigation approach for the pilot line or technology insertion programs been defined?6I - Mfg ManagementI.1 - Mfg Planning & Scheduling
337Has the initial manufacturing plan been developed?7I - Mfg ManagementI.1 - Mfg Planning & Scheduling
338Has manufacturing planning required to achieve MRL 8 been included in the Integrated Master Plan/Schedule (IMP/S)?7I - Mfg ManagementI.1 - Mfg Planning & Scheduling
339Have manufacturing risks been integrated into risk mitigation plans?7I - Mfg ManagementI.1 - Mfg Planning & Scheduling
340Have initial work instructions been developed?7I - Mfg ManagementI.1 - Mfg Planning & Scheduling
341Is an effective production control system in place to support the pilot line?7I - Mfg ManagementI.1 - Mfg Planning & Scheduling
342Has the manufacturing plan been updated for Low Rate Initial Production (LRIP)?8I - Mfg ManagementI.1 - Mfg Planning & Scheduling