Copy_of_Manufacturing_Readiness_Self-Assessment_template.xlsx
XLSX spreadsheet 41 KB Posted
- Solicitation number
- Not on record
About this file
Manufacturing Readiness Self Assessment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EVA_MIL-STD-881C-based_Electronic_Systems_WBS_Template_2014_5_30.docx | DOCX document | |
| EVA_TMSA_21_May_2014_with_HW_TRLs_template.docx | DOCX document | |
| Copy_of_EVA_System_Metrics_template_2014_6_30.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # | Question | ANS | MRL | Comments | Thread | Sub |
| 1 | Is the Technology Readiness at TRL 1 or greater? | 1 | A - Technology & Industrial Base | Technology Maturity | ||
| 2 | Is the Technology Readiness at TRL 2 or greater? | 2 | A - Technology & Industrial Base | Technology Maturity | ||
| 3 | Is the Technology Readiness at TRL 3 or greater? | 3 | A - Technology & Industrial Base | Technology Maturity | ||
| 4 | Is the Technology Readiness at TRL 4 or greater? | 4 | A - Technology & Industrial Base | Technology Maturity | ||
| 5 | Is the Technology Readiness at TRL 5 or greater? | 5 | A - Technology & Industrial Base | Technology Maturity | ||
| 6 | Is the Technology Readiness at TRL 6 or greater? | 6 | A - Technology & Industrial Base | Technology Maturity | ||
| 7 | Is the Technology Readiness at TRL 7 or greater? | 7 | A - Technology & Industrial Base | Technology Maturity | ||
| 8 | Is the Technology Readiness at TRL 7 or greater? | 8 | A - Technology & Industrial Base | Technology Maturity | ||
| 9 | Is the Technology Readiness at TRL 9? | 9 | A - Technology & Industrial Base | Technology Maturity | ||
| 10 | Is the Technology Readiness at TRL 9? | 10 | A - Technology & Industrial Base | Technology Maturity | ||
| 11 | Have potential manufacturing sources been identified for technology needs (Understand state of the art)? | 3 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 12 | Have industrial base capabilities and gaps/risks been identified for key technologies, components, and/or key processes? | 4 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 13 | Has the industrial base assessment been initiated to identify potential manufacturing sources to produce the required capability? | 5 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 14 | Have sole/single/foreign source vendors been identified? | 5 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 15 | Has planning begun to minimize the risks associated with sole/single/foreign source vendors? | 5 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 16 | Has the Industrial Capability Assessment (ICA) for MS B been completed? | 6 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 17 | Is the industrial capability in place to support the manufacturing of development articles? | 6 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 18 | Are the plans to minimize sole/single/foreign sources complete? | 6 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 19 | Has the need for sole/single/foreign sources been justified? | 6 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 20 | Have potential alternative sources been identified? | 6 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 21 | Has the industrial capability to support production been analyzed? | 7 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 22 | Is the stability of all sole/single/foreign sources being assessed/monitored? | 7 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 23 | Are the necessary alternates to sole/single/foreign sources being developed? | 7 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 24 | Has the Industrial Capability Assessment (ICA) for Milestone C been completed? | 8 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 25 | Is the industrial capability in place to support Low Rate Initial Production (LRIP)? | 8 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 26 | Are all necessary sources available including multi-sourcing where cost-effective or necessary to mitigate risk? | 8 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 27 | Is the industrial capability in place to support the start of Full Rate Production (FRP)? | 9 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 28 | Does the industrial capability support Full Rate Production (FRP)? | 10 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 29 | Has the industrial capability been assessed to support modifications, upgrades, surge, and other potential manufacturing requirements? | 10 | A - Technology & Industrial Base | A.1 - Technology Transition to Production | ||
| 30 | Have new manufacturing concepts and potential solutions been identified? | 2 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 31 | Have manufacturing technology concepts been identified through experiments/models? | 3 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 32 | Have pertinent Manufacturing Science (MS) and Advanced Manufacturing Technology requirements been identified? | 4 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 33 | Have the required manufacturing technology development efforts been initiated as applicable? | 5 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 34 | Are the necessary manufacturing technology development efforts continuing? | 6 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 35 | Have the required manufacturing technology development solutions been demonstrated in a production relevant environment? | 6 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 36 | Are the necessary manufacturing technology development efforts still continuing? | 7 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 37 | Have the required manufacturing science and manufacturing technology development solutions been demonstrated in a production representative environment? | 7 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 38 | Are the primary manufacturing technology efforts concluding and some improvement efforts continuing? | 8 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 39 | Have the required manufacturing technology development solutions been validated on a pilot line? | 8 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 40 | Have the required manufacturing technology process improvement efforts been initiated for Full Rate Production (FRP)? | 9 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 41 | Are manufacturing technology continuous process improvements ongoing? | 10 | A - Technology & Industrial Base | A.2 - Manufacturing Technology Development | ||
| 42 | Have relevant materials/processes been evaluated for manufacturability using experimental results? | 3 | B - Design | B.1 - Producibility Program | ||
| 43 | Are initial producibility and manufacturability assessments of preferred systems concepts completed? | 4 | B - Design | B.1 - Producibility Program | ||
| 44 | Are the results of the producibility and manufacturability assessment being considered in the selection of preferred design concepts? | 4 | B - Design | B.1 - Producibility Program | ||
| 45 | Are the results of the producibility and manufacturability assessment being reflected in the Technology Development Strategy key components/technologies? | 4 | B - Design | B.1 - Producibility Program | ||
| 46 | Have producibility & manufacturability assessments of key technologies and components been initiated as appropriate? | 5 | B - Design | B.1 - Producibility Program | ||
| 47 | Do ongoing design trades consider manufacturing processes and industrial base capability constraints? | 5 | B - Design | B.1 - Producibility Program | ||
| 48 | Have the manufacturing processes been assessed for capability to test and verify in production and their influence on Operations and Support (O&S)? | 5 | B - Design | B.1 - Producibility Program | ||
| 49 | Have producibility assessments and producibility trade studies (performance vs. producibility) of key technologies/components been completed? | 6 | B - Design | B.1 - Producibility Program | ||
| 50 | Are the results of the producibility assessments and trade studies being used to shape the Acquisition Strategy, Systems Engineering Plan (SEP), Manufacturing and Producibility plans, and Planning for Engineering and Manufacturing Development (EMD) or technology insertion programs? | 6 | B - Design | B.1 - Producibility Program | ||
| 51 | Are the preliminary design choices assessed against manufacturing processes and industrial base capability constraints? | 6 | B - Design | B.1 - Producibility Program | ||
| 52 | Are the producibility enhancement efforts (e.g. Design For Mfg Assembly (DFX)) initiated? | 6 | B - Design | B.1 - Producibility Program | ||
| 53 | Are the detailed producibility trade studies using detailed knowledge of key design characteristics and related manufacturing process capabilities completed? | 7 | B - Design | B.1 - Producibility Program | ||
| 54 | Are the producibility enhancement efforts (e.g. Design For Mfg Assembly) ongoing for an optimized integrated system? | 7 | B - Design | B.1 - Producibility Program | ||
| 55 | Are manufacturing processes re-assessed as needed for capability to test and verify potential influence on Operations & Support? | 7 | B - Design | B.1 - Producibility Program | ||
| 56 | Have the producibility improvements been implemented on the system? | 8 | B - Design | B.1 - Producibility Program | ||
| 57 | Have the known producibility issues been resolved and pose no significant risk for Low Rate Initial Production (LRIP)? | 8 | B - Design | B.1 - Producibility Program | ||
| 58 | Have prior producibility improvements been analyzed for effectiveness during Low Rate Initial Production (LRIP)? | 9 | B - Design | B.1 - Producibility Program | ||
| 59 | Have the producibility issues/risks discovered in Low Rate Initial Production (LRIP) been mitigated and pose no significant risk for Full Rate Production (FRP)? | 9 | B - Design | B.1 - Producibility Program | ||
| 60 | Have design producibility improvements been demonstrated in Full Rate Production (FRP)? | 10 | B - Design | B.1 - Producibility Program | ||
| 61 | Are process producibility improvements ongoing? | 10 | B - Design | B.1 - Producibility Program | ||
| 62 | Are all modifications, upgrades, Diminishing Mfg Sources & Material Shortages (DMSMS), and other changes assessed for producibility? | 10 | B - Design | B.1 - Producibility Program | ||
| 63 | Have manufacturing research opportunities been identified? | 1 | B - Design | B.2 - Design Maturity | ||
| 64 | Have applications been defined? | 2 | B - Design | B.2 - Design Maturity | ||
| 65 | Have broad performance goals been identified that may drive manufacturing options? | 2 | B - Design | B.2 - Design Maturity | ||
| 66 | Have top level performance requirements been defined? | 3 | B - Design | B.2 - Design Maturity | ||
| 67 | Have trade-offs in design options been assessed based on experiments? | 3 | B - Design | B.2 - Design Maturity | ||
| 68 | Are product lifecycle requirements and technical requirements being evaluated? | 3 | B - Design | B.2 - Design Maturity | ||
| 69 | Do the Systems Engineering Plan (SEP) and the Test and Evaluation Strategy recognize the need for the establishment/validation of manufacturing capability and management of manufacturing risk for the product lifecycle? | 4 | B - Design | B.2 - Design Maturity | ||
| 70 | Have initial potential Key Performance Parameters (KPPs) been identified for the preferred systems concept? | 4 | B - Design | B.2 - Design Maturity | ||
| 71 | Are system characteristics and measures to support required capabilities identified? | 4 | B - Design | B.2 - Design Maturity | ||
| 72 | Are form, fit, and function constraints and manufacturing capabilities identified for the preferred systems concepts? | 4 | B - Design | B.2 - Design Maturity | ||
| 73 | Are lower level performance requirements sufficient to proceed to the preliminary design? | 5 | B - Design | B.2 - Design Maturity | ||
| 74 | Are all enabling/critical technologies and components identified? | 5 | B - Design | B.2 - Design Maturity | ||
| 75 | Do enabling/critical technologies and components consider the product lifecycle? | 5 | B - Design | B.2 - Design Maturity | ||
| 76 | Have the evaluation of design Key Characteristics (KC) been initiated? | 5 | B - Design | B.2 - Design Maturity | ||
| 77 | Have product data required for prototype component manufacturing been released? | 5 | B - Design | B.2 - Design Maturity | ||
| 78 | Has a system allocated baseline been established? | 6 | B - Design | B.2 - Design Maturity | ||
| 79 | Are the system and subsystem preliminary design sufficient for Engineering and Manufacturing Development (EMD)? | 6 | B - Design | B.2 - Design Maturity | ||
| 80 | Have all enabling/critical technologies/components been demonstrated? | 6 | B - Design | B.2 - Design Maturity | ||
| 81 | Have preliminary design Key Characteristics (KC) been defined? | 6 | B - Design | B.2 - Design Maturity | ||
| 82 | Are the product requirements and features well enough defined to support critical design review even though design change traffic may be significant? | 7 | B - Design | B.2 - Design Maturity | ||
| 83 | Has all the product data essential for component manufacturing been released? | 7 | B - Design | B.2 - Design Maturity | ||
| 84 | Have potential Key Characteristic risk issues been identified? | 7 | B - Design | B.2 - Design Maturity | ||
| 85 | Is a mitigation plan in place for potential Key Characteristic risk issues? | 7 | B - Design | B.2 - Design Maturity | ||
| 86 | Is the detailed design of product features and interfaces complete? | 8 | B - Design | B.2 - Design Maturity | ||
| 87 | Has all the product data essential for system manufacturing been released? | 8 | B - Design | B.2 - Design Maturity | ||
| 88 | Does the design change traffic have minimal impact on Low Rate Initial Production (LRIP)? | 8 | B - Design | B.2 - Design Maturity | ||
| 89 | Are the Key Characteristics attainable based upon pilot line demonstrations? | 8 | B - Design | B.2 - Design Maturity | ||
| 90 | Are the major product design features and configuration stable? | 9 | B - Design | B.2 - Design Maturity | ||
| 91 | Has the system design been validated through operational testing of Low Rate Initial Production (LRIP) items? | 9 | B - Design | B.2 - Design Maturity | ||
| 92 | Is the Physical Configuration Audit (PCA) or equivalent complete as necessary? | 9 | B - Design | B.2 - Design Maturity | ||
| 93 | Is the design change traffic limited to minor configuration changes? | 9 | B - Design | B.2 - Design Maturity | ||
| 94 | Are all Key Characteristics controlled in Low Rate Initial Production (LRIP) to appropriate quality levels? | 9 | B - Design | B.2 - Design Maturity | ||
| 95 | Is the product design stable (i.e. design changes are few and generally limited to those required for continuous improvement or in reaction to obsolescence)? | 10 | B - Design | B.2 - Design Maturity | ||
| 96 | Are all Key Characteristics controlled in Full Rate Production (FRP) to appropriate quality levels? | 10 | B - Design | B.2 - Design Maturity | ||
| 97 | Has the cost model approach been defined? | 2 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 98 | Have initial cost targets and risks been identified? | 3 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 99 | Has a high level process chart model been developed? | 3 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 100 | Have technology cost models been developed for new process steps and materials based on experiments? | 3 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 101 | Have key manufacturing, material and specialized requirement cost drivers been identified? | 4 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 102 | Are detailed process chart cost models driven by process variables? | 4 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 103 | Has cost driver uncertainty been quantified? | 4 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 104 | Do prototype components produced in a production relevant environment, or simulations drive end-to-end cost models? | 5 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 105 | Is there a realistic cost model that includes materials, labor, equipment, tooling/Special Test Equipment (STE), setup, yield/scrap/rework, Work In Progress (WIP), and capability/capacity constraints? | 5 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 106 | Have cost models been updated with design requirements, material specifications, tolerances, integrated master schedule, results of system/subsystem simulations and production relevant prototype demonstrations? | 6 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 107 | Are cost models updated with the results of systems/sub-systems produced in a production representative environment, production plant layout and design, and obsolescence solutions? | 7 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 108 | Have cost models been updated with results of the pilot line build? | 8 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 109 | Has the Full Rate Production (FRP) cost model been updated with the result of the Low Rate Initial Production (LRIP) build? | 9 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 110 | Has the cost model been validated against actual Full Rate Production (FRP) cost? | 10 | C - Cost & Funding | C.1 - Production Cost Knowledge (Cost modeling) | ||
| 111 | Have manufacturing cost implications been identified? | 1 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 112 | Have cost elements been identified? | 2 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 113 | Has a sensitivity analysis been conducted to define cost drivers and production development strategy (i.e. lab to pilot to factory)? | 3 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 114 | Have producibility cost risks been assessed? | 4 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 115 | Do initial cost models support Analysis of Alternatives (AoA) and Alternative Systems Review (ASR)? | 4 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 116 | Are costs analyzed using prototype component actuals to ensure target costs are achievable? | 5 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 117 | Are decisions regarding design choices, make/buy, capacity, process capability, sources, quality, key characteristics, yield/rate, and variability influenced by cost models? | 5 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 118 | Are costs analyzed using prototype system/sub-system actuals to ensure target costs are achievable? | 6 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 119 | Have cost targets been allocated to subsystems? | 6 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 120 | Have cost reduction and avoidance strategies been developed? | 6 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 121 | Have the manufacturing costs been rolled up to the system/sub-system level and been tracked against targets? | 7 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 122 | Are detailed trade studies and engineering change requests supported by cost estimates? | 7 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 123 | Are cost reduction and avoidance strategies underway? | 7 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 124 | Are costs analyzed using pilot line actuals to ensure target costs are achievable? | 8 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 125 | Does manufacturing cost analysis support proposed changes to requirements or configuration? | 8 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 126 | Are the cost reduction initiatives ongoing? | 8 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 127 | Have Low Rate Initial Production (LRIP) cost goals been met and has the learning curve been analyzed with actual data? | 9 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 128 | Are the cost reduction initiatives still ongoing? | 9 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 129 | Has touch labor efficiency been analyzed to meet production rates? | 9 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 130 | Have elements of inefficiency for touch labor been identified with plans in place for reduction? | 9 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 131 | Have Full Rate Production (FRP) cost goals been met? | 10 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 132 | Are the cost reduction initiatives continuing? | 10 | C - Cost & Funding | C.2 - Cost Analysis | ||
| 133 | Have potential investments been identified? | 1 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 134 | Do the program/projects have reasonable budget estimates for reaching MRL 3 through experiment? | 2 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 135 | Do the program/projects have reasonable budget estimates for reaching MRL 4 by Milestone A? | 3 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 136 | Have manufacturing technology initiatives been identified to reduce costs? | 4 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 137 | Does the program have a reasonable budget estimate to reach MRL 6 by Milestone B? | 4 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 138 | Does the cost estimate include capital investment for production-relevant equipment? | 4 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 139 | Are all outstanding MRL 4 risk areas understood with approved mitigation plans in place? | 4 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 140 | Does the program have an updated budget estimate for reaching MRL 6 by Milestone B? | 5 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 141 | Are all outstanding MRL 5 risk areas understood with approved mitigation plans in place? | 5 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 142 | Does the program have a reasonable budget estimate for reaching MRL 8 by Milestone C? | 6 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 143 | Does the cost estimate include capital investment for production-representative equipment by CDR and pilot line equipment by Milestone C? | 6 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 144 | Are all outstanding MRL 6 risk areas understood with approved mitigation plans in place? | 6 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 145 | Does the program have an updated budget estimate for reaching MRL 8 by Milestone C? | 7 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 146 | Are all outstanding MRL 7 risk areas understood with approved mitigation plans in place? | 7 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 147 | Does the program have a reasonable budget estimate for reaching MRL 9 by the Full Rate Production (FRP) decision point? | 8 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 148 | Does the cost estimate include investment for Low Rate Initial Production (LRIP) and Full Rate Production (FRP)? | 8 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 149 | Are all outstanding MRL 8 risk areas understood with approved mitigation plans in place? | 8 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 150 | Does the program have a reasonable budget estimate for Full Rate Production (FRP)? | 9 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 151 | Are all outstanding MRL 9 risk areas understood with approved mitigation plans in place? | 9 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 152 | Are the production budgets sufficient for production at the required rates and schedule to support the funded program? | 10 | C - Cost & Funding | C.3 - Manufacturing Investment Budget | ||
| 153 | Have material properties been identified for research? | 1 | D - Materials | D.1 - Maturity | ||
| 154 | Have material properties and characteristics been predicted? | 2 | D - Materials | D.1 - Maturity | ||
| 155 | Have material properties been validated and assessed for basic manufacturability using experiments? | 3 | D - Materials | D.1 - Maturity | ||
| 156 | Has a survey been completed to determine if the projected material has been produced in a laboratory environment? | 4 | D - Materials | D.1 - Maturity | ||
| 157 | Have all materials been manufactured or produced in a prototype environment (may be in a similar application/program)? | 5 | D - Materials | D.1 - Maturity | ||
| 158 | Are maturity efforts in place to address new material production risks for technology demonstration? | 5 | D - Materials | D.1 - Maturity | ||
| 159 | Has the material maturity been verified with technology demonstration articles? | 6 | D - Materials | D.1 - Maturity | ||
| 160 | Are preliminary material specifications in place? | 6 | D - Materials | D.1 - Maturity | ||
| 161 | Have material properties been adequately characterized? | 6 | D - Materials | D.1 - Maturity | ||
| 162 | Is the material maturity sufficient for a pilot line build? | 7 | D - Materials | D.1 - Maturity | ||
| 163 | Have the necessary material specifications been approved? | 7 | D - Materials | D.1 - Maturity | ||
| 164 | Have the materials been proven and validated during Engineering and Manufacturing Development (EMD) as adequate to support Low Rate Initial Production (LRIP)? | 8 | D - Materials | D.1 - Maturity | ||
| 165 | Are material specifications stable? | 8 | D - Materials | D.1 - Maturity | ||
| 166 | Have all necessary materials been proven and controlled to specification in Low Rate Initial Production (LRIP)? | 9 | D - Materials | D.1 - Maturity | ||
| 167 | Have all necessary materials been proven and controlled to specification in Full Rate Production (FRP)? | 10 | D - Materials | D.1 - Maturity | ||
| 168 | Has material availability been assessed? | 2 | D - Materials | D.2 - Availability | ||
| 169 | Have material scale-up issues been identified? | 3 | D - Materials | D.2 - Availability | ||
| 170 | Have projected lead times been identified for all difficult to obtain, difficult to process, or hazardous materials? | 4 | D - Materials | D.2 - Availability | ||
| 171 | Have material quantities and lead times been estimated? | 4 | D - Materials | D.2 - Availability | ||
| 172 | Have material availability issues been addressed for the prototype build? | 5 | D - Materials | D.2 - Availability | ||
| 173 | Have significant material risks been identified for all materials? | 5 | D - Materials | D.2 - Availability | ||
| 174 | Has planning begun to address scale-up issues? | 5 | D - Materials | D.2 - Availability | ||
| 175 | Have material availability issues been addressed to meet Engineering and Manufacturing Development (EMD) build? | 6 | D - Materials | D.2 - Availability | ||
| 176 | Have potential obsolescence issues been identified? | 6 | D - Materials | D.2 - Availability | ||
| 177 | Have material availability issues been addressed to meet Engineering and Manufacturing Development (EMD) builds? | 7 | D - Materials | D.2 - Availability | ||
| 178 | Have long lead procurements been identified/planned for Low Rate Initial Production (LRIP)? | 7 | D - Materials | D.2 - Availability | ||
| 179 | Is an obsolescence plan in place? | 7 | D - Materials | D.2 - Availability | ||
| 180 | Have long lead procurements been initiated for Low Rate Initial Production (LRIP)? | 8 | D - Materials | D.2 - Availability | ||
| 181 | Are material availability risk issues minimized for Low Rate Initial Production (LRIP)? | 8 | D - Materials | D.2 - Availability | ||
| 182 | Have long lead procurements been initiated for Full Rate Production (FRP)? | 9 | D - Materials | D.2 - Availability | ||
| 183 | Are availability risk issues minimized for Full Rate Production (FRP)? | 9 | D - Materials | D.2 - Availability | ||
| 184 | Are all significant Full Rate Production (FRP) material availability risk issues resolved? | 10 | D - Materials | D.2 - Availability | ||
| 185 | Has an initial assessment of potential supply chain capability been completed? | 3 | D - Materials | D.3 - Supply Chain Management | ||
| 186 | Has a survey for potential supply chain sources been completed? | 4 | D - Materials | D.3 - Supply Chain Management | ||
| 187 | Have potential supply chain sources been identified? | 5 | D - Materials | D.3 - Supply Chain Management | ||
| 188 | Are supply chain plans (e.g., teaming agreements, etc.) in place leading to an Engineering and Manufacturing Development (EMD) contract award? | 6 | D - Materials | D.3 - Supply Chain Management | ||
| 189 | Is there an effective supply chain management process in place? | 7 | D - Materials | D.3 - Supply Chain Management | ||
| 190 | Has an adequate assessment of the first tier supply chain been completed? | 7 | D - Materials | D.3 - Supply Chain Management | ||
| 191 | Is the supply chain adequate to support Low Rate Initial Production (LRIP)? | 8 | D - Materials | D.3 - Supply Chain Management | ||
| 192 | Has an adequate assessment of the critical second and lower tier supply chain been completed? | 8 | D - Materials | D.3 - Supply Chain Management | ||
| 193 | Is the supply chain stable and adequate to support Full Rate Production (FRP)? | 9 | D - Materials | D.3 - Supply Chain Management | ||
| 194 | Are long term agreements in place where practical? | 9 | D - Materials | D.3 - Supply Chain Management | ||
| 195 | Has the supply chain been proven to support Full Rate Production (FRP) requirements? | 10 | D - Materials | D.3 - Supply Chain Management | ||
| 196 | Has an initial evaluation of potential regulatory requirements and special handling concerns been completed? | 2 | D - Materials | D.4 - Special Handling | ||
| 197 | Has a list of hazardous materials been identified? | 3 | D - Materials | D.4 - Special Handling | ||
| 198 | Have potential special handling procedures been applied in the lab? | 3 | D - Materials | D.4 - Special Handling | ||
| 199 | Have special handling concerns been assessed? | 3 | D - Materials | D.4 - Special Handling | ||
| 200 | Has a list of hazardous materials been updated? | 4 | D - Materials | D.4 - Special Handling | ||
| 201 | Have special handling requirements been identified? | 4 | D - Materials | D.4 - Special Handling | ||
| 202 | Have the special handling procedures been applied in the lab? | 4 | D - Materials | D.4 - Special Handling | ||
| 203 | Have special handling procedures been applied in a production relevant environment? | 5 | D - Materials | D.4 - Special Handling | ||
| 204 | Have all special handling requirement gaps been identified? | 5 | D - Materials | D.4 - Special Handling | ||
| 205 | Have new special handling processes been demonstrated in lab environment? | 5 | D - Materials | D.4 - Special Handling | ||
| 206 | Have special handling procedures been applied in a production relevant environment? | 6 | D - Materials | D.4 - Special Handling | ||
| 207 | Have the plans to address the special handling requirement gaps been completed? | 6 | D - Materials | D.4 - Special Handling | ||
| 208 | Have special handling procedures been applied in a production representative environment? | 7 | D - Materials | D.4 - Special Handling | ||
| 209 | Have special handling procedures been developed and annotated on work instructions? | 7 | D - Materials | D.4 - Special Handling | ||
| 210 | Have special handling procedures been applied in a pilot line environment? | 8 | D - Materials | D.4 - Special Handling | ||
| 211 | Have special handling procedures been demonstrated in Engineering and Manufacturing Development (EMD) or technology insertion programs? | 8 | D - Materials | D.4 - Special Handling | ||
| 212 | Have the special handling risk issues been minimized for Low Rate Initial Production (LRIP)? | 8 | D - Materials | D.4 - Special Handling | ||
| 213 | Do all work instructions contain special handling provisions as required? | 8 | D - Materials | D.4 - Special Handling | ||
| 214 | Have special handling procedures been applied in a Low Rate Initial Production (LRIP) environment? | 9 | D - Materials | D.4 - Special Handling | ||
| 215 | Have the special handling procedures been demonstrated in Low Rate Initial Production (LRIP)? | 9 | D - Materials | D.4 - Special Handling | ||
| 216 | Have the special handling risk issues been minimized for Full Rate Production (FRP)? | 9 | D - Materials | D.4 - Special Handling | ||
| 217 | Have the special handling procedures been effectively implemented in Full Rate Production (FRP)? | 10 | D - Materials | D.4 - Special Handling | ||
| 218 | Have initial models been developed, if applicable? | 2 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 219 | Have proposed manufacturing concepts or producibility needs been identified based on high-level process flow chart models? | 3 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 220 | Have production modeling and simulation approaches for process or product been identified? | 4 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 221 | Have the initial simulation models (product or process) been developed at the component level? | 5 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 222 | Have the initial simulation models been developed at the technology sub-system or system level? | 6 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 223 | Have the simulation models been used to determine system constraints and identify improvement opportunities? | 7 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 224 | Have the simulation models been verified by the pilot line? | 8 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 225 | Have the results of the simulation models been used to improve processes and determine that Low Rate Initial Production (LRIP) requirements can be met? | 8 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 226 | Have the simulation models been verified by Low Rate Initial Production (LRIP) build and used to assist in management of Low Rate Initial Production (LRIP)? | 9 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 227 | Have the results of the simulation models been used to determine if Full Rate Production (FRP) requirements can be met? | 9 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 228 | Have the simulation models been verified by Full Rate Production (FRP) build? | 10 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 229 | Have the production simulation models been used as a tool to assist in management of Full Rate Production (FRP)? | 10 | E - Process Capability & Control | E.1 - Modeling & Simulation | ||
| 230 | Have material and/or process approaches been identified? | 2 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 231 | Have high level manufacturing processes been documented? | 3 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 232 | Have critical manufacturing processes been identified through experimentation? | 3 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 233 | Has a survey been completed to determine the current state of critical processes? | 4 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 234 | Has process maturity been assessed on similar processes in production? | 5 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 235 | Have process capability requirements been identified for pilot line, Low Rate Initial Production (LRIP) and Full Rate Production (FRP)? | 5 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 236 | Have the key manufacturing processes been demonstrated in a production relevant environment? | 6 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 237 | Has collecting or estimating process capability data from prototype build begun? | 6 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 238 | Have the manufacturing processes been successfully demonstrated in a production representative environment? | 7 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 239 | Has collecting or estimating process capability data continued? | 7 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 240 | Have the manufacturing processes for Low Rate Initial Production (LRIP) been verified on a pilot line? | 8 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 241 | Does capability data from the pilot line meet the target? | 8 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 242 | Are the manufacturing processes stable, adequately controlled, capable, and have the manufacturing processes achieved program Low Rate Initial Production (LRIP) objectives? | 9 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 243 | Have variability experiments been conducted to show Full Rate Production (FRP) impact and potential for continuous improvement? | 9 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 244 | Are the manufacturing processes stable, adequately controlled, capable, and have the manufacturing processes achieved program Full Rate Production (FRP) objectives? | 10 | E - Process Capability & Control | E.2 - Manufacturing Process Maturity | ||
| 245 | Have initial estimates of yields and rates based on experiments or state of the art been completed? | 3 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 246 | Has a yield and rates assessment on proposed/similar processes been completed? | 4 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 247 | Has a yield and rates assessment on proposed/similar processes been applied within the Analysis of Alternatives (AoA)? | 4 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 248 | Have target yield and rates been established for the pilot line, Low Rate Initial Production (LRIP), and Full Rate Production (FRP)? | 5 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 249 | Have yield and rate issues been identified? | 5 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 250 | Have yield and rate improvement plans been developed/initiated? | 5 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 251 | Are yields and rates from the production relevant environment being evaluated against targets? | 6 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 252 | Are results from the yields and rates from the production relevant environment being fed into an improvement plan? | 6 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 253 | Are yields and rates from the production representative environment being evaluated against pilot line targets? | 7 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 254 | Are results from the yields and rates from the production representative environment being fed into improvement plans? | 7 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 255 | Have pilot line yield and rate targets been achieved? | 8 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 256 | Have yields and rates required to begin Low Rate Initial Production (LRIP) been verified using pilot line articles? | 8 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 257 | Are yield and rate improvement plans ongoing and being updated? | 8 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 258 | Have the Low Rate Initial Production (LRIP) yield and rate targets been achieved? | 9 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 259 | Are yield improvements on-going? | 9 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 260 | Have the Full Rate Production (FRP) yield and rate targets been achieved? | 10 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 261 | Are yield improvements on-going? | 10 | E - Process Capability & Control | E.3 - Process Yields and Rates | ||
| 262 | Has a quality strategy been identified as part of the Technology Development Strategy (TDS)? | 4 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 263 | Is a quality strategy included in the System Engineering Plan (SEP)? | 4 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 264 | Has the quality strategy been updated to reflect Key Characteristic identification activities? | 5 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 265 | Is there an initial Quality Plan (QP) and a Quality Management System (QMS) in place? | 6 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 266 | Have quality risks and adequate metrics been identified? | 6 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 267 | Have the quality targets been established? | 7 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 268 | Has the ability to collect and analyze quality data (process and system) been demonstrated in the production representative environment? | 7 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 269 | Has quality targets been demonstrated on the pilot line? | 8 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 270 | Is continuous quality improvement on-going? | 8 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 271 | Have supplier products completed qualification testing and first article inspection? | 8 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 272 | Have supplier products passed acceptance testing at a rate adequate to begin Low Rate Initial Production (LRIP)? | 8 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 273 | Have quality targets been verified on the Low Rate Initial Production (LRIP) line? | 9 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 274 | Is continuous quality improvement on-going? | 9 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 275 | Have supplier products passed acceptance testing at a rate adequate to transition to Full Rate Production (FRP)? | 9 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 276 | Have the quality targets been verified on the Full Rate Production (FRP) line? | 10 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 277 | Is continuous quality improvement on-going? | 10 | F - Quality Management | F.1 - Quality Management including Supplier Quality | ||
| 278 | Have new manufacturing skills been identified? | 3 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 279 | Have manufacturing skill sets been identified? | 4 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 280 | Have production workforce requirements (technical and operational) been evaluated as part of AoA? | 4 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 281 | Has the availability of process development workforce for the Technology Development Phase been determined? | 4 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 282 | Have the necessary workforce skill sets been identified to meet prototype production needs? | 5 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 283 | Have plans for the identified skill sets been developed to meet prototype production needs? | 5 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 284 | Have special skills certification and training requirements been established? | 5 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 285 | Are the manufacturing workforce skills available for production in a relevant environment? | 6 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 286 | Have resources (quantities and skill sets) been identified to achieve requirements for pilot line and production? | 6 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 287 | Have initial plans for the identified resources (quantities and skill sets) been developed to achieve requirements for pilot line and production? | 6 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 288 | Have the manufacturing workforce resource requirements been identified for the pilot line? | 7 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 289 | Have plans been developed to achieve pilot line requirements? | 7 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 290 | Have plans been updated to achieve Low Rate Initial Production (LRIP) workforce requirements? | 7 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 291 | Has the pilot line workforce been trained in the representative environment? | 7 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 292 | Have manufacturing workforce resource requirements been identified for Low Rate Initial Production (LRIP)? | 8 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 293 | Have plans been developed to achieve Low Rate Initial Production (LRIP) requirements? | 8 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 294 | Have plans been updated to achieve Full Rate Production (FRP) workforce requirements? | 8 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 295 | Have Low Rate Initial Production (LRIP) personnel been trained on the pilot line where possible? | 8 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 296 | Have Low Rate Initial Production (LRIP) personnel requirements been met? | 9 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 297 | Has a plan been implemented to achieve Full Rate Production (FRP) workforce requirements? | 9 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 298 | Have Full Rate Production (FRP) personnel requirements been met? | 10 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 299 | Are production workforce skill sets being maintained due to attrition of the workforce? | 10 | G - Mfg Personnel | G.1 - Manufacturing Personnel | ||
| 300 | Are tooling/Special Test Equipment (STE)/Special Inspection Equipment (SIE) requirements being considered as part of AoA? | 4 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 301 | Have tooling and STE/SIE requirements been identified? | 5 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 302 | Have supporting rationale and a schedule been provided for the tooling and STE/SIE requirements? | 5 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 303 | Have prototype tooling and STE/SIE concepts been demonstrated in production relevant environment? | 6 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 304 | Have production tooling and STE/SIE requirements been developed? | 6 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 305 | Are production tooling and STE/SIE design and development efforts underway? | 7 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 306 | Has a manufacturing equipment maintenance strategy been developed? | 7 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 307 | Have all tooling, test, and inspection equipment been proven on the pilot line? | 8 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 308 | Have all tooling, test and inspection equipment requirements been identified for Low Rate Initial Production (LRIP)? | 8 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 309 | Has manufacturing equipment maintenance been demonstrated on pilot line? | 8 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 310 | Have all tooling, test, and inspection equipment been proven in the Low Rate Initial Production (LRIP)? | 9 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 311 | Have all tooling, test, and inspection equipment requirements been identified for Full Rate Production (FRP)? | 9 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 312 | Has a manufacturing equipment maintenance schedule been demonstrated? | 9 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 313 | Is proven tooling, test, and inspection equipment in place to support maximum Full Rate Production (FRP)? | 10 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 314 | Has a planned equipment maintenance schedule been achieved? | 10 | H - Facilities | H.1 - Tooling/ Special Test and Inspection Equipment (STE/SIE) | ||
| 315 | Have specialized facility requirements/needs been identified? | 3 | H - Facilities | H.2 - Facilities | ||
| 316 | Has the availability of manufacturing facilities for prototype development and production been evaluated as part of the Analysis of Alternatives (AoA)? | 4 | H - Facilities | H.2 - Facilities | ||
| 317 | Have manufacturing facilities been identified to produce prototypes? | 5 | H - Facilities | H.2 - Facilities | ||
| 318 | Have plans for the identified manufacturing facilities been developed to produce prototypes? | 5 | H - Facilities | H.2 - Facilities | ||
| 319 | Have manufacturing facilities been identified to produce the pilot line build? | 6 | H - Facilities | H.2 - Facilities | ||
| 320 | Have plans for the identified manufacturing facilities been developed to produce the pilot line build? | 6 | H - Facilities | H.2 - Facilities | ||
| 321 | Have manufacturing facilities been identified to produce the Low Rate Initial Production (LRIP) build? | 7 | H - Facilities | H.2 - Facilities | ||
| 322 | Have plans for the identified manufacturing facilities been developed to produce the Low Rate Initial Production (LRIP) build? | 7 | H - Facilities | H.2 - Facilities | ||
| 323 | Have pilot line facilities been demonstrated? | 8 | H - Facilities | H.2 - Facilities | ||
| 324 | Are manufacturing facilities adequate to begin Low Rate Initial Production (LRIP)? | 8 | H - Facilities | H.2 - Facilities | ||
| 325 | Are plans in place to support the transition to Full Rate Production (FRP)? | 8 | H - Facilities | H.2 - Facilities | ||
| 326 | Have manufacturing facilities been demonstrated in Low Rate Initial Production (LRIP)? | 9 | H - Facilities | H.2 - Facilities | ||
| 327 | Are capacity plans adequate to support Full Rate Production (FRP)? | 9 | H - Facilities | H.2 - Facilities | ||
| 328 | Are the production facilities in place to meet Full Rate Production (FRP) requirements? | 10 | H - Facilities | H.2 - Facilities | ||
| 329 | Has the capacity of the production facilities been demonstrated to meet Full Rate Production (FRP) requirements? | 10 | H - Facilities | H.2 - Facilities | ||
| 330 | Has a manufacturing strategy been developed and integrated with an acquisition strategy? | 4 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 331 | Have prototype schedule risk mitigation efforts been incorporated into the Technology Development Strategy (TDS)? | 4 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 332 | Has the manufacturing strategy been refined based upon the preferred concept? | 5 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 333 | Have prototype schedule risk mitigation efforts been initiated? | 5 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 334 | Has the initial manufacturing approach been developed? | 6 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 335 | Are all system design related manufacturing events included in the Integrated Master Plan/Schedule (IMP/S)? | 6 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 336 | Has the manufacturing risk mitigation approach for the pilot line or technology insertion programs been defined? | 6 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 337 | Has the initial manufacturing plan been developed? | 7 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 338 | Has manufacturing planning required to achieve MRL 8 been included in the Integrated Master Plan/Schedule (IMP/S)? | 7 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 339 | Have manufacturing risks been integrated into risk mitigation plans? | 7 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 340 | Have initial work instructions been developed? | 7 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 341 | Is an effective production control system in place to support the pilot line? | 7 | I - Mfg Management | I.1 - Mfg Planning & Scheduling | ||
| 342 | Has the manufacturing plan been updated for Low Rate Initial Production (LRIP)? | 8 | I - Mfg Management | I.1 - Mfg Planning & Scheduling |
This is the start of the file's text. The full file is on GovTribe.