EV_Layout_update20261013.jpg

JPG image 1 MB Posted

Attached to
Electric Vehicle Charging Station Upgrades
Solicitation number
DEEP102326CM
Issued by
Connecticut

About this file

This is a layout diagram related to an Electric Vehicle Charging Station Upgrades project for the Connecticut Department of Energy and Environmental Protection (DEEP). The image, titled "EV_Layout_update20261013.jpg," appears to be a technical drawing or site plan dated October 13, 2026, depicting the physical configuration and placement of electric vehicle charging stations. The diagram illustrates the spatial arrangement of charging infrastructure, likely showing multiple charging station locations, their interconnections, and relevant site features necessary for the installation and upgrade project.

The layout diagram serves as a supporting exhibit for the Invitation to Bid (ITB) for consultant services to review and facilitate installation support for replacing existing EV charging stations with upgraded units capable of integrating Amp Up wireless software for electronic payment processing. This technical documentation is essential for bidders to understand the physical scope of work across all DEEP charging locations, enabling accurate assessment of installation requirements, site conditions, and logistical considerations for the charging station replacement and upgrade initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .