EV Charging Station Bidder Form.docx
DOCX document 17 KB Posted
- Attached to
- RFQ for EVSE Grant
- Solicitation number
- BD-26-1087-REG01-REG01-129224
- Issued by
- Massachusetts
About this file
This is a mandatory bid sheet form issued by the Massachusetts Division of Occupational Licensure for an RFQ for EVSE (Electric Vehicle Supply Equipment) Grant. The bidder form requests information from interested vendors regarding the installation and supply of EV charging stations across four proposed locations. Bidders must provide detailed cost breakdowns for all equipment, installation labor, and infrastructure improvements required to complete the project.
The bid sheet requires vendors to submit itemized pricing for the following categories: total equipment costs for EV stations including integrated hardware and software, total installation labor costs, infrastructure costs with descriptions of necessary improvements such as trenching and electrical upgrades, other non-labor costs for equipment and materials including permits and activation fees, extended warranty options, and any additional relevant project costs. Bidders must also provide a comprehensive total project bid amount and may include supporting documentation describing the specific equipment proposed and any relevant project comments. The form requests standard bidder information including company name, contact details, and business description and experience.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOL FY27 EVSE SOW RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Division of Occupational Licensure Mandatory Bid Sheet Bidder Information Bidder Name or Company Name:
Bidder Contact Name:
Bidder Contact Email:
Bidder Contact Phone:
Business Description & Experience
Bid Summary:
Please provide a quote for the proposed 4 locations listed in the RFQ:
| Item: |
| Cost/Item/per location: |
| Lump Sum Total |
Total Equipment costs for EV stations, including all integrated hardware and software
Total Installation Labor Costs
Infrastructure costs (describe below)*
Other non-labor costs for equipment, materials, permits, trenching, mounting, connection, activation, etc (describe below)**
Extended warranty
Any other relevant costs, not specified above
Total Project Bid:
*Provide information related to any necessary infrastructure improvements required (ie trenching, excavation, new service, electric upgrades)
**Provide information on the specific equipment being proposed:
Comments: Bidder may use this space to provide additional information as they see fit.
File details come from the government source that posted it. Updated .