EV Charging Pricing Template.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Electric Vehicle Charging Stations
- Solicitation number
- PE-92200-RFP-2026-000000079
- Issued by
- Fulton County, Georgia
About this file
This is an EV Charging Pricing Template for the standardization of proposal pricing related to the installation and operation of 21 dual-port Level 2 electric vehicle charging stations. The template requires vendors to provide detailed pricing across equipment procurement, installation services, ongoing maintenance and support, and warranty options. Bidders must complete all yellow-shaded fields in the template, providing unit pricing where applicable, with quantities specified for each line item. The project encompasses equipment pricing for the charging stations themselves, replacement connectors and cords, and any additional equipment; installation services on a lump-sum basis; annual software and network subscription fees; preventative maintenance costs; repair labor rates; and replacement parts allowances. The template also requires vendors to specify standard manufacturer or vendor warranty terms and optional extended warranty offerings with associated annual customer support fees.
The pricing proposal requires vendors to exclude taxes unless otherwise specified in the solicitation documents and to enter "N/A" for any line items not applicable to their proposal or if no revenue share model is proposed. Section 4 of the template addresses revenue sharing arrangements, requiring vendors to specify the percentage of charging revenue allocated to the Government/Consortium, vendor, and other parties, along with any minimum guarantee provisions. The template consolidates all costs into a summary section that totals equipment subtotal, additional costs subtotal, and warranty and support subtotal to arrive at the total initial proposed cost. Vendors must also provide notes, references, project descriptions, site locations, and organization contact information with phone numbers and email addresses to support their proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Electric Vehicle Charging Station.pdf | ||
| Sign In Sheet.pdf | ||
| GWCC_Campus_and_Area_Maps_Update.pdf | ||
| GWCCA_ParkingDeck_ElecCarCharging.pdf | ||
| GWCCA Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Template
| EV Charging Stations Pricing Template | ||||||
| Instructions | ||||||
| Complete all yellow-shaded fields. Provide unit pricing where applicable. If a line item is not applicable, enter N/A. If revenue share is not proposed, enter N/A. | ||||||
| This template is intended to standardize proposal pricing for 21 dual-port Level 2 EV charging stations. | ||||||
| Amounts should exclude taxes unless otherwise stated by the solicitation. | ||||||
| 1. Equipment Pricing | ||||||
| Item | Description | Qty | Unit of Measure | Unit Price | Extended Price | Notes / Assumptions |
| EV Charging Station | Dual-port Level 2 unit | 21 | Each | $0.00 | ||
| Charging Connectors/Cords | Replacement cord/cable cost | Each | ||||
| Other Equipment | Specify any additional equipment included | |||||
| 2. Installation and Additional Costs | ||||||
| Item | Description | Qty | Unit of Measure | Unit Price | Extended Price | Notes / Assumptions |
| Installation | Installation services (if applicable) | 1 | Lot | $0.00 | ||
| Software/Network Subscription | Annual recurring fee | 1 | Annual | $0.00 | ||
| Preventative Maintenance | Annual maintenance fee | 1 | Annual | $0.00 | ||
| Repair Labor | Hourly labor rate or flat repair pricing | 1 | Hour/Flat | $0.00 | ||
| Replacement Parts | Other replacement parts pricing | 1 | Allowance | $0.00 | ||
| 3. Warranty and Support | ||||||
| Item | Description | Term | Unit of Measure | Cost | Included (Y/N) | Notes |
| Standard Warranty | Manufacturer / vendor warranty | Years | ||||
| Extended Warranty Option | Optional extended warranty | Years | ||||
| Customer Support | Any separate support fee | Annual | ||||
| 4. Revenue Share (if applicable) | ||||||
| Category | Description | GWCCA Share | Vendor Share | Other Fees | Minimum Guarantee | Notes |
| Revenue Share Proposal | Percentage of charging revenue | |||||
| 5. Cost Summary | ||||||
| Equipment Subtotal | $0.00 | |||||
| Additional Costs Subtotal | $0.00 | |||||
| Warranty/Support Subtotal | $0.00 | |||||
| Total Initial Proposed Cost | $0.00 | |||||
| Notes |
References
| Reference Submission Template | |||||
| Project / Site | Organization | Contact Name | Phone / Email | Project Description | Location |
File details come from the government source that posted it. Updated .