Estimate_20566_from_Industrial_Supply_Consultants.pdf

PDF 20 KB Posted

Attached to
Lawrence CC - SP w/EC Dietary Water Heater
Solicitation number
24-426DOC-SOURC-B-38804
Issued by
Kendall County, Illinois

About this file

This document is a quote from Industrial Supply Consultants to the Lawrence Correctional Center in Sumner, Illinois for the purchase of one Lochinvar CFN0992PM, Copper Fin II water heater with a pump, with a total weight of 843 lbs. The quote is valid from August 31, 2023 to September 14, 2023, with a ship date of August 31, 2023 and a customer pick-up option. The total cost for the water heater is $15,767.00.

The quote includes terms that any returned material is subject to a minimum service or restocking charge of 25% of the billing invoice, plus all transportation charges incurred by Industrial Supply Consultants. No other pricing terms, set asides, incumbents, funding requirements, or other salient information is provided in the document.

View the file

Other files

File Type Posted
Lawrence SP wEC Water Heater B-38804 BOA.docx DOCX document
Standard Terms and Conditions1 - v.23.2~13.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industrial Supply Consultants

4015 Hazelbrook Dr Springfield, IL 62711-8120

(217) 971-4160 kray@iscorp.us

Quote

ADDRESS

Bill O'Daniel Lawrence Correctional Center 10940 Lawrence Road Sumner, Illinois 62466 US

SHIP TO

Bill O'Daniel Lawrence Correctional Center 10940 Lawrence Road Sumner, Illinois 62466 US

QUOTE # 20566

DATE 08/31/2023

EXPIRATION DATE 09/14/2023

SHIP DATE SHIP VIA

08/31/2023 Customer P/U Porter

ACTIVITY ACTIVITY QUANTITY RATE AMOUNT

CFN0992PM LOCHINVAR - CFN0992PM, COPPER FIN II

WATER HEATER, 990MBH, w/PUMP (Total Weight 843 Lb)

1 15,767.00 15,767.00

Here is our quote, thanks again for considering us, Material accepted for return is subject to a minimum service or restocking charge of 25% of the billing invoice, plus all transportation charges incurred by Industrial Supply Consultants

TOTAL $15,767.00

Accepted By Accepted Date

File details come from the government source that posted it. Updated .