Inflatable_Refridgeration_Units.pdf

PDF 246 KB Posted

Attached to
Expeditionary Support Equipment-Inflatable Refrigeration, Collapsible Transfer Cases, and Modular Solar Power
Solicitation number
Not on record
Issued by

About this file

This is a Performance Work Statement for inflatable refrigeration units required by the United States Air Force for temporary, field-deployable cold-storage capability to preserve human remains in austere operational environments. The acquisition is conducted as a commercial commodity purchase under FAR Part 12 (Acquisition of Commercial Items) in conjunction with FAR Part 13 or FAR Part 15. The Contractor must manufacture or procure, inspect, pack, crate, and deliver complete inflatable temperature-controlled storage systems within ninety (90) calendar days After Receipt of Order (ARO) to a designated FOB Destination point.

The units must meet rigorous technical specifications including: individual capacity for 40 to 60 human remains per unit with modular scalability to 100 to 200 total remains when interconnected; vertical sidewalls providing minimum 6.5 feet clearance; structural load rating of 250 lbs per square foot; hermetically sealed air-beam architecture requiring no continuous blower operation and maintaining rigidity for 72 hours without air top-off; puncture- and tear-resistant, UV-stabilized, fire-retardant textiles conforming to NFPA 701 or CPAI-84; non-porous biohazard liners resistant to medical disinfectants, bleach, formaldehyde, and bodily fluids; liquid-tight bathtub floor berm with minimum 4-inch height and two drain scuppers; operating in ambient temperatures from −20°F to +125°F with 80 mph sustained wind tolerance; rapid setup within 15–30 minutes inflation and 2 hours total operational readiness; packed modules not exceeding 200 lbs with 463L pallet compatibility; thermal performance maintaining 36°F to 39°F internally under full solar loading with 60-minute cool-down capability from 100°F ambient; dual independent cooling circuits with automatic failover within 30 seconds; two 10-inch ventilation sleeves for chemical exhaust; 48-inch by 78-inch insulated access door with thermal curtain; and emergency interior egress mechanism. Optional deliverables include modular mortuary racking systems (CLIN 0002) and hybrid power generation packages (CLIN 0003) with 3 kW solar arrays and 10 kW generators. Required deliverables also include technical manuals, repair kits, warranty documentation, and operator training videos. Warranty coverage includes 3 years for inflatable structures and fabrics, 5 years for refrigeration systems, 3 years for power systems and racking, and 2 years for other components. Government acceptance requires 100% receiving inspection, pneumatic integrity verification, thermal pull-down and redundancy testing, and liquid containment validation, with nonconforming items subject to rejection and contractor rectification within fifteen (15) calendar days at no additional Government cost.

View the file

Other files

File Type Posted
Collapsable_Inflatable Transfer Case.pdf PDF
RFI.pdf PDF
Containerized_Modular_Solar_Power_Systems.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

UNCLASSIFIED | Page 1

PERFORMANCE WORK STATEMENT

FOR

Inflatable Refrigerators

UNITED STATES AIR FORCE

Purchase Description and Commodity Acquisition

TABLE OF CONTENTS

1. GENERAL INFORMATION

2. REQUIREMENTS

3. CONTRACTOR DELIVERABLES

4. QUALITY ASSURANCE AND GOVERNMENT ACCEPTANCE

1. GENERAL INFORMATION

1.1 Statement of Need and Background

The United States Air Force (USAF) requires an agile, rapidly deployable, and scalable cold-storage capability to close an operational gap during Large-Scale Combat Operations (LSCO), mass-casualty surges, and expeditionary contingencies. Specifically, a capability requirement exists for temporary, field-deployable refrigeration solutions to safely, respectfully, and hygienically preserve human remains (HR) in austere operational environments. These units are required to support forward mortuary affairs collection points, mobile preparation and embalming facilities, and temporary staging nodes where permanent cold-storage infrastructure is damaged, unavailable, or non-existent.

Current legacy deployable refrigeration assets are rigid, heavy, logistically constrained, and limited in capacity. The Government requires commercial-off-the-shelf (COTS) or commercially adapted inflatable, dynamic temperature-controlled structures to bridge this capability gap.

1.2 Scope of Acquisition

This is a commercial commodity acquisition conducted under FAR Part 12 (Acquisition of Commercial Items) in conjunction with FAR Part 13 or FAR Part 15.

The Contractor shall manufacture (or procure), inspect, pack, crate, and deliver complete inflatable temperature-controlled storage systems (herein referred to as Inflatable Refrigerators). The inflatable refrigeration units shall be capable of independent or interconnected operation to provide scalable capacity ranging from small unit support to theater-level requirements. The units must be rugged, chemically resistant to mortuary fluids and decontamination solutions, easy to deploy and recover, and capable of maintaining precise temperature control in austere environments while supporting the storage of human remains in transfer cases, Ziegler cases, clinical mortuary trays, or human remains pouches.

1.3 Period of Performance and Delivery

All commodities, documentation, and accessories shall be delivered to the designated FOB Destination point within ninety (90) calendar days After Receipt of Order (ARO), unless an alternate delivery schedule is established in the contract order.

UNCLASSIFIED | Page 2

2. REQUIREMENTS

The delivered inflatable refrigeration units must meet or exceed the following salient technical characteristics:

2.1 Capacity, Geometry and Usable Space

2.1.1 Base Unit Capacity:

Each individual inflatable refrigeration unit shall accommodate modular interior mortuary racking systems capable of storing a minimum of 40 to 60 human remains using standard military transfer cases, Ziegler cases, clinical mortuary trays, and/or human remains pouches.

2.1.2 Modular Scalability:

The system shall be designed to support modular connection of multiple units. When two or more units are interconnected, the overall system shall be capable of scaling to a total storage capacity of 100 to 200 human remains.

2.1.3 Vertical Sidewall Clearance:

The design shall feature vertical or near-vertical sidewalls providing a minimum of 6.5 feet (78 inches) of vertical clearance from the floor along the interior perimeter before any roof-arch transition.

2.1.4 Structural Load Rating:

The sub-structure and flooring shall safely support multi-tier portable mortuary racks or stacked human remains pouches with a distributed loading rating of not less than 250 lbs per square foot without puncturing, compressing, or damaging the thermal floor envelope.

2.2 Structural Envelope, Air-Beam Architecture and Environmental Resilience

2.2.1 Hermetically Sealed Air-Beam Architecture (or Similar):

The structure shall utilize independent, hermetically sealed pneumatic air-beams (closed-chamber design) or similar technology that does not require continuous blower operation. Systems that require continuous, 24/7 blower operation to maintain structural inflation are strictly prohibited.

2.2.2 Once inflated, the structure shall maintain full structural rigidity and design profile autonomously for a minimum of seventy-two (72) hours without requiring supplemental air top-off.

2.2.3 Each air-beam rib shall feature an independent isolation valve and an integrated mechanical over-pressure relief valve.

2.2.4 Textile & Seam Construction:

The structure shall be fabricated from high-tensile, puncture- and tear-resistant, UV-stabilized, and fire-retardant composite textiles conforming to NFPA 701, CPAI-84, or equivalent standard.

2.2.5 Biohazard Liner & Chemical Resistance:

Interior liner surfaces shall be non-porous, smooth, and impervious to medical-grade disinfectants, 10% sodium hypochlorite (bleach) solutions, formaldehyde and embalming fluid vapors, bodily fluids, and virucidal decontamination washes without peeling, blistering, or delaminating.

2.2.6 Liquid-Tight "Bathtub" Floor Berm:

The flooring shall feature an integrated, raised perimeter containment berm (minimum 4 inches in

UNCLASSIFIED | Page 3 height) welded directly to the sidewall liner to contain melting condensation, bodily fluids, or sanitization runoff. The berm shall include at least two (2) capped, chemical-resistant drain scuppers for controlled drainage.

2.2.7 Environmental Operating Thresholds:

• Ambient temperature range: −20°F to +125°F (−29°C to +52°C)

• Sustained wind tolerance: Minimum 80 mph (approx. 70 knots) sustained with gusts up to 100 mph when properly anchored

• Snow load tolerance: Minimum 10 lbs per square foot

2.2.8 Extended Storage Shelf-Life:

Textiles, elastomeric bladders, and mechanical valves shall be rated for extended crated/sheltered storage with a minimum 5-year shelf-life without vulcanization, seal adhesion, or dry rot.

2.3 Deployability, Ergonomics and Logistics Footprint

2.3.1 Rapid Setup Time:

Full inflation of the structural skeleton shall occur within fifteen to thirty (15–30) minutes of inflation pump activation. Total operational readiness (including floor placement, anchoring, and ECU connection) shall be achievable within two (2) hours by a crew of two to four (2–4) personnel.

2.3.2 Tool-Free Assembly:

Erection and teardown shall require no heavy equipment, cranes, or specialized tools.

2.3.3 Package Ergonomics (MIL-STD-1472):

When deflated, the shelter envelope and primary components shall pack into ruggedized transit bags or wheeled transport cases equipped with heavy-duty lift handles. Individual transit bags or modules shall target a maximum gross weight of 150 lbs, but shall not exceed 200 lbs (excluding the skid-mounted ECU).

2.3.4 Tactical Logistics Compatibility:

Packed systems shall be 100% compatible with standard 463L cargo pallet tie-down envelopes and standard military intermodal container space constraints.

2.4 Thermal Performance, Refrigeration and Redundancy

2.4.1 Operational Temperature Range:

The integrated refrigeration system shall maintain steady-state internal chamber temperatures between 36°F and 39°F (+2°C to +4°C) when subjected to full solar loading in ambient environments up to +125°F (+52°C). The system shall also support sub-freezing operations down to 0°F (-18°C) when required.

2.4.2 Cool-Down Capability:

The refrigeration unit shall pull down internal chamber temperatures from an ambient start of +100°F (+38°C) to the target operating threshold of 39°F (+4°C) within sixty (60) minutes of compressor startup.

2.4.3 Cooling Redundancy and Failover:

The system shall incorporate dual independent cooling circuits or dual ECU connection plenums with

UNCLASSIFIED | Page 4 an automatic failover mechanism. In the event of a failure of the primary cooling circuit or ECU, the secondary system shall engage automatically within 30 seconds and maintain the internal chamber temperature below 45°F (+7°C) at all times. The failover shall occur with no manual intervention required.

2.5 Air Quality, Ventilation and Power Systems

2.5.1 Chemical/VOC Exhaust Ports:

The structure shall include at least two (2) dedicated pass-through ventilation sleeves (minimum 10-inch diameter) with airtight cinch collars to accommodate external exhaust ducting or negative-pressure air-filtration units for safely removing chemical vapors (such as formaldehyde or disinfectants).

2.5.2 Electrical Specifications and Power Compatibility:

All electrical components shall operate on standard U.S. electrical profiles: 120V / 208V / 240V AC, 60 Hz, single- or three-phase power. The system shall be compatible with solar power systems, military Tactical Quiet Generators (TQGs), and commercial utility power. The refrigeration system shall include integral surge suppression and phase-reversal protection.

2.6 Ingress, Egress and Safety Features

2.6.1 Barrier Doors & Vestibule:

The entryway shall provide an insulated, heavy-duty access opening (minimum 48 inches wide by 78 inches high) with an integrated split-flap magnetic thermal curtain or zippered airlock vestibule to minimize thermal loss during frequent personnel and gurney transfers.

2.6.2 Emergency Interior Egress:

The main entry door and airlock shall feature an illuminated, mechanical emergency internal release mechanism operable with gloved hands to prevent personnel entrapment under complete blackout conditions.

2.7 Modular Interior Mortuary Racking and Tray System (CLIN 0002)

The Contractor shall provide as an optional item a modular, multi-tier mortuary racking and tray system compatible with the inflatable refrigeration units. The racking system shall:

2.7.1 Safely support and organize a minimum of 40 to 60 human remains per inflatable unit using standard military transfer cases, Ziegler cases, clinical mortuary trays, and/or human remains pouches.

2.7.2 Be constructed of corrosion-resistant materials that are easily cleaned and compatible with formaldehyde, bleach solutions, and standard mortuary decontamination chemicals.

2.7.3 Be designed for rapid installation and removal inside the inflatable structure while maintaining proper airflow around stored remains.

2.7.4 Support modular expansion when multiple inflatable units are interconnected.

2.8 Power Generation and Management System (CLIN 0003 - Optional)

The Contractor shall provide as an optional item a power generation and management system compatible with the inflatable refrigeration units. The power package shall:

UNCLASSIFIED | Page 5

2.8.1 Include a high-efficiency solar array with a minimum nameplate capacity of 3 kW, MPPT charge controllers, and battery storage with a minimum usable capacity of 5 kWh.

2.8.2 Offer a quiet diesel or multi-fuel generator (minimum 10 kW rating) with automatic transfer switch capability.

2.8.3 Provide a hybrid power management system capable of prioritizing solar power, then battery, then generator with seamless failover and no interruption to cooling.

2.8.4 Be fully compatible with standard military Tactical Quiet Generators (TQGs) and 120/208/240V 60 Hz power sources.

3. CONTRACTOR DELIVERABLES

The Contractor shall deliver the commodities and technical data specified below:

Item Description Quantity Schedule / Milestone

CLIN

Inflatable Temperature-Controlled Storage Unit(s) (complete operational assembly including sealed air-beam structure, redundant ECU/chiller system, rapid inflation pump, bathtub floor, ducting, and anchoring kit)

As specified in contract order

Within 90 Calendar Days

ARO

CLIN

Modular Interior Mortuary Racking & Tray System As specified in contract order

Within 90 Calendar Days

ARO

CLIN

Power Generation and Management Package (Solar array, hybrid controller, and generator option)

As specified in contract order

Within 90 Calendar Days

ARO

CDRL

A001

Commercial Technical Manuals (Setup, Operation, Preventive Maintenance, Field Sanitization/Decon, Deflation, Packing & Storage)

1 Hard Copy + 1 Digital per unit

Delivered concurrently with units

CDRL

A002

Rapid Field Repair & Patch Kit 1 Complete Kit per Unit

Packed inside unit transit case

CDRL

A003

Commercial Warranty Documentation 1 Copy per shipment

With final delivery

CDRL

A004

Digital Operator Training Media (Step-by-step video demonstration)

1 Digital Copy Within 30 days of contract award

Warranty (CDRL A003):

The Contractor shall provide a minimum commercial warranty as follows:

UNCLASSIFIED | Page 6

• Inflatable Structure, Air-Beams, and Fabrics: 3 years

• Refrigeration / ECU / Cooling System: 5 years

• Power System (Solar, Batteries, Inverters, Controllers): 3 years

• Modular Racking System: 3 years

• All other components and workmanship: 2 years

4. QUALITY ASSURANCE AND GOVERNMENT ACCEPTANCE

4.1 Receiving Inspection

Upon delivery, Government Quality Assurance personnel will perform a 100% inspection to verify:

• Total component inventory matches the contract CLIN schedule and packing slip.

• Freedom from transit damage, material defects, pinhole leaks, or damaged hardware.

• Verification of Buy American Act (BAA) / Trade Agreements Act (TAA) certificates of origin.

4.2 Operational Acceptance Testing

Prior to final invoice acceptance, the Government reserves the right to conduct a field validation test on delivered units:

4.2.1 Pneumatic Integrity Test: The shelter must fully inflate in under 30 minutes and maintain operational rigidity for 24 hours without secondary air addition.

4.2.2 Thermal Pull-Down & Redundancy Test: The refrigeration unit must pull down the interior chamber from ambient temperature to 39°F (+4°C) within 60 minutes. Simulated primary circuit failure must successfully trigger secondary failover without temperature exceeding 45°F (+7°C).

4.2.3 Liquid Containment Verification: The bathtub floor berm must demonstrate zero leakage when exposed to washdown fluids.

4.3 Rejection and Rectification

Any unit that fails physical inspection, does not meet salient performance parameters, or contains non-BAA/TAA compliant items shall be rejected. The Contractor shall repair or replace non-conforming items within fifteen (15) calendar days of notification at no additional cost to the Government.

1. GENERAL INFORMATION
1.1 Statement of Need and Background
1.2 Scope of Acquisition
1.3 Period of Performance and Delivery
2. REQUIREMENTS
2.1 Capacity, Geometry and Usable Space
2.2 Structural Envelope, Air-Beam Architecture and Environmental Resilience
2.3 Deployability, Ergonomics and Logistics Footprint
2.4 Thermal Performance, Refrigeration and Redundancy
2.5 Air Quality, Ventilation and Power Systems
2.6 Ingress, Egress and Safety Features
2.7 Modular Interior Mortuary Racking and Tray System (CLIN 0002)
2.8 Power Generation and Management System (CLIN 0003 - Optional)
3. CONTRACTOR DELIVERABLES
4. QUALITY ASSURANCE AND GOVERNMENT ACCEPTANCE
4.1 Receiving Inspection
4.2 Operational Acceptance Testing
4.3 Rejection and Rectification

File details come from the government source that posted it. Updated .