Escanaba Site Diagram.pdf

PDF 1 MB Posted

Attached to
751/24228. SAA; Various Locations- Solar Arrays
Solicitation number
RFQ-171-250000000414-4
Issued by
Washtenaw County, Burt CDP, Michigan

About this file

This document appears to be a site diagram and location map for a solar array project for the Michigan Department of Natural Resources (DNR) Finance & Operations located in Escanaba. The project targets a 31 kW solar installation, with flexibility for either roof or ground mounting at the DNR facility. The site has specific geographical characteristics, including a west-side terrain drop-off and an existing mural on the east side of the building, as noted in the accompanying construction documentation.

The location map reveals the project site is situated near several local landmarks, including the Escanaba River, Michigan State Fire Department, Pioneer Trail Park, and Delta County Parks. The site photograph shows a modern DNR building with large glass windows, a brown roof, and is positioned on a grassy slope with surrounding pine trees. The project appears to be part of a broader renewable energy initiative for state government facilities, leveraging the location's topography and existing infrastructure to implement a solar energy solution that can potentially reduce operational energy costs and support sustainability goals.

View the file

Other files

File Type Posted
Escanaba 3.jpg JPG image
Cadillac 4.jpeg JPEG file
Gaylord CSC 1.jpg JPG image
Gaylord CSC 2.jpg JPG image
Cadillac 2.jpeg JPEG file
CHERRYLAND T.C. FY25.pdf PDF
Design Build (Rev03-2025).pdf PDF
Gaylord CSC 4.jpg JPG image
Esc. Dist. Offic Bldg. and Maintenance Garages.pdf PDF
Escanaba 2.jpg JPG image
Cadillac Site Diagram.pdf PDF
Escanaba 1.jpg JPG image
Gaylord CSC 3.jpg JPG image
CHERRYLAND T.C. FY24.pdf PDF
Cadillac 1.jpeg JPEG file
Cadillac 3.jpeg JPEG file
Consumers Cadillac FY24.pdf PDF
Consumers Cadillac FY25.pdf PDF
Design Build Advertisement 24228.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

751/24228.SAA DNR Finance & Operations - Escanaba Solar Arrays Target 31 kw - Possible roof or ground mount Site drops off to west / mural on east - see existing construction docs

File details come from the government source that posted it. Updated .