Cadillac Site Diagram.pdf

PDF 148 KB Posted

Attached to
751/24228. SAA; Various Locations- Solar Arrays
Solicitation number
RFQ-171-250000000414-4
Issued by
Washtenaw County, Burt CDP, Michigan

About this file

This is a site diagram for a solar array project by the Department of Natural Resources (DNR) Finance & Operations located in Cadillac. The diagram shows an aerial view of the DNR Cadillac Customer Service Center and surrounding area, with a specific annotation indicating a target of generating 110% of 32 kW annually for the solar array installation. The image includes nearby landmarks such as J Aten Trucking and Steven Brennan's location, with a marked area labeled "Leave this area" near the proposed solar array site.

The site diagram provides a geospatial context for the solar array project, showing the proposed location within the DNR facility grounds. The precise positioning suggests careful site selection to maximize solar energy generation potential while minimizing disruption to existing infrastructure. The 110% generation target indicates an ambitious approach to renewable energy production, potentially allowing for energy surplus or future expansion of the facility's energy needs.

View the file

Other files

File Type Posted
Escanaba 3.jpg JPG image
Cadillac 4.jpeg JPEG file
Gaylord CSC 1.jpg JPG image
Gaylord CSC 2.jpg JPG image
Cadillac 2.jpeg JPEG file
CHERRYLAND T.C. FY25.pdf PDF
Design Build (Rev03-2025).pdf PDF
Gaylord CSC 4.jpg JPG image
Esc. Dist. Offic Bldg. and Maintenance Garages.pdf PDF
Escanaba 2.jpg JPG image
Escanaba Site Diagram.pdf PDF
Escanaba 1.jpg JPG image
Gaylord CSC 3.jpg JPG image
CHERRYLAND T.C. FY24.pdf PDF
Cadillac 1.jpeg JPEG file
Cadillac 3.jpeg JPEG file
Consumers Cadillac FY24.pdf PDF
Consumers Cadillac FY25.pdf PDF
Design Build Advertisement 24228.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

751/24228.SAA - DNR Finance & Operations - Cadillac Solar Array Target 110% 32 kw annually

Leave this area

File details come from the government source that posted it. Updated .