This file comprises technical drawings for a landfill gas collection and control system expansion project at the Perdido Landfill in Cantonment, Florida, prepared for Escambia County's Waste Services Department. The project involves comprehensive infrastructure installation including survey work, system layout design, and installation of below-grade polyvinyl chloride (PVC) and high-density polyethylene (HDPE) gas, air, and condensation lines. The scope includes drilling extraction wells, excavating while preserving existing infrastructure, abandoning identified facilities as needed, and connecting new facilities to existing systems. Key deliverables comprise seven landfill gas wellheads, 1,100 linear feet of 18-inch header pipe, 520 linear feet of 8-inch lateral pipe, and 630 linear feet of 6-inch lateral pipe. The invitation to bid (ITB #PD 25-26.004) was released on October 14, 2025, with a pre-bid meeting scheduled for October 21, 2025. Bid responses are due by November 14, 2025, at 10:00 a.m., and the contract will be awarded to the lowest responsive and responsible bidder. The contractor must complete all work within 150 consecutive calendar days from the notice to proceed, furnishing all labor, materials, equipment, tools, transportation, and services necessary to deliver the project in accordance with the technical specifications and plans.

Bidders are required to submit a bid bond or cashier's check equal to five percent of the total bid price and must provide comprehensive insurance coverage including workers' compensation, general liability, auto liability, and pollution liability. Contractors must also submit E-Verify certification and various state-mandated forms. No explicit set-aside designations for disadvantaged enterprises are mentioned in the procurement documents. While a specific total project cost is not directly stated, the detailed technical specifications and extensive underground utility installation requirements indicate a significant capital investment. The project represents an expansion of the existing landfill gas extraction and control infrastructure and requires integration with current systems, demanding contractor expertise in landfill gas collection systems, environmental infrastructure development, and complex underground utility installations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .