This document is an Addendum 2 to Solicitation No. TMD24-FMO-0033739 issued by the Texas Military Department (TMD) for an HVAC replacement project. The Addendum makes corrections to the scope of work, reducing the required HVAC capacity from 12.5 tons to 10 tons per unit and extending the bid due date to March 1, 2024. The solicitation seeks a contractor to remove and dispose of two chiller, boiler, and humidifier systems and install two new 10-ton, 3-phase 230V electric HVAC systems with 20 kW heat at a facility located in Mineral Wells, Texas within Stephens County.
The Addendum indicates that the change in HVAC capacity is made to address potential humidity issues that could arise from an oversized system. No other details are provided regarding pricing, set-asides, incumbents, funding, or contract terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM OF SOLICITATION
1. SOLICITATION NO.
TMD24-FMO-0033739
2. ADDENDUM NO.
3. EFFECTIVE DATE
02/20/2024
4. ISSUED BY
Texas MilitaryDepartment 2200 W. 35th Street Austin, Texas 78703
5. NAME AND ADDRESS OF OFFEROR
6. The above numbered solicitation is an addendum as set forth in Item 4. The hour and date specified for receipt of Bids X is extended, is not extended.
Bidders should acknowledge receipt of this addendum prior to the hour and date specified in the solicitation or, by one of the following methods:
(a) By completing Items 5 and 8, and returning 1 copy of the addendum; (b) By acknowledging receipt of this addendum on each copy of the bid submitted; or (c) By separate letter or e-mail which includes a reference to the solicitation and addendum numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF BIDS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID. If by virtue of this addendum, you desire to change a bid already submitted, such change may be made by e-mail or letter, provided each e-mail or letter makes reference to the solicitation and this addendum, and is received prior to the opening hour and date specified.
7. DESCRIPTION OF ADDENDUM
TMD has issued this Addendum 2 in order to make corrections to the scope of work section C.1 and C.2.I for this Project per the recommendation of the question below and adding 7 days to bid due date (03/01/2024).
Instead of the 12.5 tons, replace with 10 tons:
I. Install two (2) new HVAC 10 ton 3ph 230v electric systems with 20 KW heat each.
Except as provided herein, all terms and conditions of the solicitation, as heretofore changed, remain unchanged and in full force and effect.
8a. NAME AND TITLE OF SIGNER (Type or Print)
8b. OFFEROR
(Signature of Person Authorized to Sign) Date Signed
TEXAS MILITARY DEPARTMENT
INVITATION FOR BIDS (IFB)
TMD24-FMO-0033739 HVAC
REPLACEMENT
Question and Answer Document
Question: Is this TMD facility open to the idea of installing 20 tons of air conditioning instead of the 25 tons listed in the solicitation?
“Current Equipment:
• The current equipment ( 1 - 25 Ton air handler, 2 - 12.5 Ton Condenser units) provides 25 tons of cooling capacity to your 7,000 sq ft building.
The existing unit is equipped with a fresh air system designed to continually mix fresh air (outside air) into the conditioned space (inside the building). Since the outside air is continually mixing into the air handler, these units are typically oversized to compensate for the extra cooling capacity needed to condition the outside air as well as the air in the building.
Potential Problem:
• Since the project requires us to remove the fresh air system, 25 tons of cooling would now be technically considered 7.5 Tons oversized for your 7,000 sq. ft.
building. If the cooling capacity is significantly oversized, it will often lead to humidity issues within the building.
• Load calculations for cooling in Texas:
o 1 ton per 400 sq ft (insulated building) o 7000 sq ft insulated building = 17.5 tons of cooling
Solution:
• Downsize the units to a cooling capacity of 20 tons.
o Install (2) air handlers (10 tons each). Both equipped with 20kw heat strips o Install (2) condensers (10 tons each) in the place of the 12.5 ton condensers o All demo and installations listed in the solicitation (C.2 Statement of Work) will completed as requested
• This eliminates the potential problems with humidity within the conditioned space.
• Savings o This would reduce the initial cost of the project.
o The smaller units would be more efficient resulting in long term energy savings.”
Answer: Replace 12.5 tons with 10 tons per solution section of question.