ESBD_File_343734_23-13_WDDRF and LRCC_DP_RFQ Addendum 02_2023.12.19.pdf

PDF 84 KB Posted

Attached to
23-13 TTU Junction- Wildlife Disease and Deer Research Facility and Llano River Conservation Center
Solicitation number
23-13_TTUJunction-WDDRFandLRCC_DP-RFQ
Issued by
Kimble County, Katy City, Texas

About this file

This document is an Addendum to the Request for Qualifications (RFQ) for the Wildlife Disease and Deer Research Facility (WDDRF) and Llano River Conservation Center (LRCC) projects at the Texas Tech University - Junction Campus in Junction, Texas. The addendum indicates that the intent is to award both the WDDRF and LRCC projects to a single design firm, with the construction delivery method being Construction Manager-at-Risk. It also provides responses to inquiries, clarifying that a specific number of client references is not required, and that the higher education experience requirement in Section 5.4.3 is specific to that experience.

The related state and local contract opportunity is for the 23-13 TTU Junction project, which includes the WDDRF and LRCC. Responses to the RFQ can be uploaded through the e-Builder Bid Portal until 4:00 PM CT on Wednesday, January 3, 2024. The Texas Tech University System is the contracting agency and is an equal opportunity employer that encourages all historically underutilized businesses to participate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER TWO (2) Page 1

Date: December 19, 2023

Wildlife Disease and Deer Research Facility and Llano River Conservation Center

Texas Tech University – Junction Campus Junction, TX

Texas Tech University System

Lubbock, Texas

FP&C Number: 23-13

NOTICE TO ALL RESPONDENTS:

The following shall be incorporated in and become a part of the original Request for Qualifications (RFQ) of the above-identified project. Please acknowledge receipt of this Addendum in the space provided on the Form of Response within the RFQ. Failure to do so may subject the Respondent to disqualification.

ITEM #1:

Responses to Inquiries:

• It is our intent is to award both the WDDRF and the LRCC project to a single design firm.

• The construction delivery method will be Construction Manager-at-Risk.

• The RFQ states to include current client references for all members of the project team. A specific number of references is not required.

• Yes, 5.4.3 is specific to higher education experience.

• No, 5.6.2 was not deleted.

END OF ADDENDUM NO. TWO (2)