ESBD_File_341610_Attachment D Laundry Equipment Maintenance Requirements.pdf

PDF 40 KB Posted

Attached to
IFB TSD Replacement Washer Extractor and Service
Solicitation number
303-4-05237
Issued by
Travis County, Austin City, Texas

About this file

This document is an attachment detailing the laundry equipment maintenance requirements for a state and local contract opportunity in Texas. The contract is for the Texas School for the Deaf and involves the purchase and installation of one Milnor Washer-Extractor Model #30022VRJ, as well as quarterly preventative maintenance and as-needed repair services for this new washer and three existing appliances, over a five-year term. The contract solicitation was issued on November 7, 2023, with a deadline for submission of questions on November 14, 2023, and a bid submission deadline of November 28, 2023.

The maintenance requirements cover both washers and dryers, including changing oils, lubricating grease points, checking and adjusting belts and chains, checking air and water leaks, and performing full diagnostic procedures. The equipment to be serviced includes two Milnor dryers and one existing washer, as well as a new washer to be installed. The service schedule is quarterly (four times per year) for all the laundry equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D

LAUNDRY EQUIPMENT MAINTENANCE REQUIREMENTS

WASHERS DRYERS

Change all oils Change all oils

Lubricate all grease points Lubricate all grease points

Clean contacts Check and adjust all belts

Check and adjust belts Check and adjust chains

Check air line leaks and hose condition Check sprockets

Check air valve leaks Check and adjust door latch

Check and adjust balance feature Check gas valve

Check and adjust door latch Check burner flame level

Check water valves Check thermostat

Check water leaks Check timer

Check and tighten main bearing bolts Check full operation

Check floor mounting bolts Check lint screen

Check full operation Check thermostat sensing probe

Perform full microprocessor based diagnostic procedure

Check lint from air flow switch

Check motors through voltage and amp draw tests Clean air vents on drive motor

EQUIPMENT TO BE SERVICED

MODEL SERIAL NUMBER SERVICE SCHEDULE

MLG758V Dryer (x2)* 582985 and 582986 Quarterly (4 times per year)

30022T5X Washer (x1)* 12716958 / 12213AAT Quarterly (4 times per year)

New Washer TBD Quarterly (4 times per year)

OTHER EQUIPMENT

Upon Request

File details come from the government source that posted it. Updated .