ESBD_File_341194_Addendum 4.pdf
PDF 2 MB Posted
- Attached to
- Frank Garrett HVAC Project
- Solicitation number
- 152-11-2024-01
- Issued by
- Bexar County, San Antonio City, Texas
About this file
This document is Addendum #4 to the Frank Garrett HVAC Project No. 35-00282-02-03, which is a state and local contract opportunity involving the Bexar County and San Antonio City jurisdictions. The addendum includes administrative changes to the bid documents, such as a revised bid opening date of December 8, 2023 at 2:00 PM CT, as well as responses to questions about pipe sizes for the domestic cold water, sanitary sewer, domestic hot water, and hot water return systems. The addendum also references Addendum #3, which provided additional information about the project.
The contract opportunity is for the Frank Garrett HVAC Project, which is being advertised through online bidding on the CivCast platform. The pre-bid meeting will be held virtually on November 13, 2023, and the deadline for questions is November 20, 2023. Bid results will be read aloud using WebEx. No further details are provided about pricing terms, set asides, incumbents, funding requirements, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_File_341194_Addendum 2.pdf | ||
| ESBD_File_341194_010 IFB - LQB_Frank Garret.pdf | ||
| ESBD_File_341194_Addendum 1.pdf | ||
| ESBD_File_341194_Addendum 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #4, Frank Garrett HVAC Project No. 35-00282-02-03
Form09/22/2021AM Page 1 | 2
ADDENDUM 4
PROJECT NAME: Frank Garrett HVAC Project
DATE: 12/01/2023
PROJECT NO: 35-00282-02-03
This addendum is separated into sections for convenience; however, all respondents, bidders, contractors, subcontractors, material men, and other parties must be responsible for reading the entire addendum. The failure to list an item or items in all affected sections of this addendum does not relieve any party affected from performing as per instructions, providing that the information is set forth one time any place in this addendum. These documents will be attached to and will become part of the
Contract Documents for this project. The respondent/bidder is required to acknowledge the receipt of this addendum.
GENERAL:
1. The following changes and/or additions to the Contract Documents, via this addendum, must apply to proposals made for and to the execution of the various parts of the work affected thereby.
2. Careful note of the Addendum must be taken by all interested parties and all trades affected must be fully advised in their performance of the work involved.
3. This Addendum is hereby made part of the project requirements and contract documents for the above reference project.
Ensure to acknowledge this Addendum in CivCast when downloading this Addendum. Acknowledgement of this
Addendum is a requirement in order to submit bid in CivCast. This addendum consists of the items and their associated attachments as listed below:
A. ADMINISTRATIVE CHANGES TO BID DOCUMENTS:
1. Change of Bid Opening Date.
a. Current Bid Opening Date: December 5, 2023 @ 2:00pm
b. New Bid Opening Date: December 8, 2023 @ 2:00pm
C. QUESTIONS & RESPONSES:
Question #6: Pipe sizes for the domestic cold water and sanitary sewer are the only pipe sizes shown.
Pipe sizes for the domestic hot water and hot water return are not shown. In order to price these systems, all pipe sizes will be required, and site visit is not enough time for us to do this.
Answer: See Addendum #3 drawings for pipe sizes.
Question #7: What are the pipe sizes to all new chilled water piping? Not shown on drawings.
Answer: See Addendum #3 drawings for pipe sizes.
SIGNED AND SEALED BY CONSULTANT (Engineer/Architect of Record) By signing and sealing this addendum, the Engineer/Architect of Record acknowledges that the sign/seal is only for changes/clarifications to the items associated with the Engineer’s/Architect’s work referenced in this addendum.
Addendum #4, Frank Garrett HVAC Project No. 35-00282-02-03
Form09/22/2021AM Page 2 | 2
END OF ADDENDUM NO. 4
/0
1/
ADDENDUM #3
Alderson & Associates, Inc. | Consulting Engineers | TBPE Firm No. F1008
7700 Torino, Suite 101 | San Antonio, TX 78229 | (210) 614-1110 | www.alderson-inc.com
Date: 11/27/2023
Client: MARMON MOK ARCHITECTURE
Project Name: FRANK GARRETT COMMUNITY CENTER RENOVATION–PACKAGE 2
Project Number: 23002
This addendum is generally separated into sections for convenience; however, all contractors, subcontractors, material men and other parties shall be responsible for reading the entire addendum. The failure to list an item or items in all affected sections of this addendum does not relieve any part affected from performing as per instructions, providing that the information is set forth one time any place in this addendum. These documents shall be attached to and become part of the Contract Documents for this project.
PLAN ITEMS
RE: Plan Sheet M101:
Item 1: Updated piping sizes.
RE: Plan Sheet P101:
Item 1: Added block note.
RE: Plan Sheet -P102:
Item 1: Added block note.
Item 2: Updated piping sizes.
END OF ITEMS FOR ADDENDUM
4"
4"
4"
1"
1"
4"
4"
LDR2 HV1
MDPL
1"
1"
1"
4"
4" 4" 4"
4" 4"
4"
M101
MECHANICAL NEW
WORK & DEMOLITION
ENLARGEMENT
E
D
C
B
A
654321
Drawn Checked Date Project No.
Revisions
2023 Marmon Mok, LLP Unauthorized reproduction is prohibited.
c
SHEET TITLE
SHEET NO.
Fi le
P at h
2/ 8/
:3
4:
P M
FR
AN
K G
AR
R
ET
T
C O
M M
U N
IT
Y
C
EN
TE
R
R
EN
O
VA
TI
O
N
PA
C
KA
G
E
N W
8t h St
Sa n An to ni o, T
X
23002 10/13/23
MEB
PEP
11-27-2023 Addendum #03
WOMEN'S
RR
MEN'S RR
JANITOR'S
CLOSET
CHILLER - SEE MECH
P101
PLUMBING NEW WORK
E
D
C
B
A
654321
Drawn Checked Date Project No.
Revisions
2023 Marmon Mok, LLP Unauthorized reproduction is prohibited.
c
SHEET TITLE
SHEET NO.
Fi le
P at h
2/ 8/
:3
4:
P M
FR
AN
K G
AR
R
ET
T
C O
M M
U N
IT
Y
C
EN
TE
R
R
EN
O
VA
TI
O
N
PA
C
KA
G
E
N W
8t h St
Sa n An to ni o, T
X
23002 10/13/23
MEB
PEP
ADDITIVE ALTERNATE #1
CARRIER
WITH VAPOR
ROD, CUT TO
THREADED
PIPE
CLEVIS TYPE
PIPE HANGER
INSULATION
SEAL TO PIPE
LENGTH
MIN. LENGTH = 6"
FOR INSULATION.
SHEET METAL SHIELD
HANGER POINT
PROVIDE A SECTION
INSULATION AT EACH
OF INCOMPRESSIBLE
N.T.S.
NOTE: ALL PIPE INSULATION SHALL BE CONTINUOUS.
INSULATED PIPES SHALL BE SUPPORTED AROUND
INSULATION. "NOTCHING" OF INSULATION AROUND
PIPE SUPPORTS IS NOT ACCEPTABLE.
WHERE INSULATION IS IN
CONTACT WITH UNISTRUT, USE
INSULATION PROTECTION.
P-4000 UNISTRUT
PIPE HANGER DETAIL
CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING PIPE SIZES AND
NOTIFY THE ENGINEER OF ANY
DISCREPANCIES FOR FURTHER
DIRECTION.
JANITOR'S
CLOSET
WOMEN'S
RR
MEN'S RR
FLOOR
ACCESS
PANEL TBD
CHILLER - SEE MECH
P102
PLUMBING NEW WORK
E
D
C
B
A
654321
Drawn Checked Date Project No.
Revisions
2023 Marmon Mok, LLP Unauthorized reproduction is prohibited.
c
SHEET TITLE
SHEET NO.
Fi le
P at h
2/ 8/
:3
4:
P M
FR
AN
K G
AR
R
ET
T
C O
M M
U N
IT
Y
C
EN
TE
R
R
EN
O
VA
TI
O
N
PA
C
KA
G
E
N W
8t h St
Sa n An to ni o, T
X
23002 10/13/23
MEB
PEP
ADDITIVE ALTERNATE #1
CARRIER
WITH VAPOR
ROD, CUT TO
THREADED
PIPE
CLEVIS TYPE
PIPE HANGER
INSULATION
SEAL TO PIPE
LENGTH
MIN. LENGTH = 6"
FOR INSULATION.
SHEET METAL SHIELD
HANGER POINT
PROVIDE A SECTION
INSULATION AT EACH
OF INCOMPRESSIBLE
N.T.S.
NOTE: ALL PIPE INSULATION SHALL BE CONTINUOUS.
INSULATED PIPES SHALL BE SUPPORTED AROUND
INSULATION. "NOTCHING" OF INSULATION AROUND
PIPE SUPPORTS IS NOT ACCEPTABLE.
WHERE INSULATION IS IN
CONTACT WITH UNISTRUT, USE
INSULATION PROTECTION.
P-4000 UNISTRUT
PIPE HANGER DETAIL
CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING PIPE SIZES AND
NOTIFY THE ENGINEER OF ANY
DISCREPANCIES FOR FURTHER
DIRECTION.
| Addendum 3.pdf |
| Addendum 4 (003).pdf |
File details come from the government source that posted it. Updated .