- PROCESS TECHNOLOGY CENTER PILOT PLANT CONSTRUCTION SERVICES ELECTRICAL & CONTROL EQUIPMENT
- Solicitation number
- LSC01-0000900
- Issued by
- Harris County, Texas
About this file
This document is an exhibit that details issues with the electrical and communications systems of the Process Technology Center (PTC) Pilot Plant, as well as a proposal to remedy the improper installation. The exhibit is related to a state and local contract opportunity issued by Lone Star College in Texas for construction services and electrical engineering to upgrade the electrical panels at the PTC Pilot Plant.
The key issues identified include improper voltage supply, non-NEMA enclosures, lack of proper grounding and shielding, and inadequate ventilation, all of which have led to premature component failure and safety concerns. The proposal outlines the need to separate the communications and 480V power hardware into two NEMA-4xs cabinets, redesign and recommission the electrical and communications panels, conduct an electrical system survey and arc flash survey, and properly label components. The desired outcomes are to ensure safe student and instructor interaction with the systems, increase the reliability of the PTC for instructional use, and promote safer operation of the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT “B”- Process Technology Center: PTU Communications and Electrical Project
A. What's Wrong
I. The two panels housing the communications hardware was installed with higher (480 V) voltage/power supply hardware for the Delta-V and Cooling Tower panels in the PTU shown below. This installation causes premature component failure and creates a significant safety issue as instructors and students have a need to open the panels to troubleshoot Delta-V signals to the control room. 480 Volt power is dangerous and should only be encounters by a qualified electrician which is not a PTC-resource.
2. The controllers and 1/0 hardware are housed in a Non-NEMA (wrong) enclosure and open to direct sun light most of the day and not properly sun shielded. NEMA standards for industrial construction is the standard we should have. The 480 Volt motor drives and power for Controller system are not properly isolated and grounded causing signal interference and power surge handling uncertainty. Interference creates process control problems.
3. Controller and I/O are mounted in the vertical mode with no forced air to properly cool the system. It is a horizontal mounted base plate system causing higher and component damaging temperature inside the panel.
4. 1/0 shield system has been compromised with the control wiring exposed to the 480 Volt VFD (variable frequency drive) drive signals, no isolation. Shield and drain wire should be maintained to within 2 to 3 inches of the 1/0 termination point.
5. Panel Enclosure is not properly ventilated and sealed. Needs to be a NEMA enclosure for the area and cooled including proper sun screening. Most likely the present hardware failures due to high temperatures.
Communication Hardware
480V
B. Proposal to remedy improper installation:
I. Panels I and 2 housing the communications low voltage hardware (DeltaV/other) and 480 V power is to be separated into two NEMA-4xs cabinets each. Replace Panels with NEMA-4xs cabinet for outside service. The cabinet for housing 480 V service to have an external ON/OFF switch gear to increase assurance of a de-energized main cabinet for opening.
2. Panel I and Panel 2 Re-design, modification, and recommissioning of the new electrical/communications panels will require DeltaV and PLC (Cooling Tower Start-up/Operation) related skilled technicians by Puffer-Swieven and other subs to confirm the new panels work properly locally and from the control room.
3. An Electrical System Survey by a certified electrician skilled in the National Electric Code
(NEC) and OSHA (CFR) Code of federal regulations for Industrial electrical systems. Survey to include proper labeling of components within the system and recommendations for regular maintenance of the systems.
4. An Arc Flash survey of power distribution panels including labeling and recommendations to minimize the potential of an Arc Flash occurring.
C. Outcomes
I. The purpose of the PTU is to train students earning an AAS in Process Technology or AAS in Instrumentation Technology. The students learn how to operate and maintain industrial systems based on their education at PTC. With a properly designed and operating communications and electrical systems, instructors and students can safely interact with the hardware mentioned to carry out instruction.
2. Repairs will increase reliability of the PTU so that its ready to use throughout the semester, so students get the full experience as operators and instrument technicians
3. Safer Operation of the PTU
| A. What's Wrong |
| B. Proposal to remedy improper installation: |
| C. Outcomes |